Loading...
propsed changes 4-1-04 001 City Hall Proposed Changes to Contract Revised April 1, 2004 Phase I Verbally changed and completed, not invoiced Material Labor Total Paint old back door $35.00 $90.00 $125.00 Paint restrooms $77.00 390.00 $467.00 New door and jamb $750.00 $750.00 Remove and store shelving $85.00 $850.00 from 117 Repair Outlet box in floor $130.00 $130.00 Total $862.00 $695.00 $1557.00 Phase I Proposed changes Materials and Labor 1) New matching VCT in restrooms -$1788.00 2) Exterior I-box for RPB 386.00 3) CDD Reception elect. & Comm. 682.50 Total-52856.50 Phase 11 Proposed Changes 1) Additional bookcases Room # Description Cost Estimate 126 Shelving over file cabinets $477.00 122 L shaped bookcase $2016.00 123 20" Shelving over file cabinets See 122 123 12" book case " 109 Work Center (note 5) $1080.00 109 Take arc out of counter (note 109 xv~.ite 2 108 Counter Space (note 3) $1475.00 106 Shelves (note 4) $1389.00 105 Relocate court shelves $ 160.00 Total $7677 2) Restroom Remodel -$4943.00 3) Plumbing wall at old break room 600.00 4) Water filter + access panel in new plumbing wall. 225.00 5) Standardize egg crate light fixtures (24 new) -$4800.00 6) Replace 9 new lights w/egg crates -S ? 7) New 7' doors -$3060.00 8) Electrical Change Order 41240.00 Total -526959.1 Committed Total 7525.5