Loading...
phase 2 punch list 001 Phase II Punch List Room 106-Agnes Office 1. Rusty nail head above window facing courtyard. 2. Windowsills scratchedlholes, need stained 3. Paint chip in wall on west wall 4. Corner painting questionable Scratches on NW wall 5. Door dirty 6. Rough Corner 7 Gouge on west wall Room 107-Barb Office. 1. Window Sills Room 108-Work room: 1. Door molding needs touch up paint near walls 2. Upper cabinet dirty 3. Counter top edge irregular 4. Far right drawers rub when opened Room 105-Safe Room: 1. Right of door has something on it (dirt?) 2. Door molding needs touch up paint 3. Install wall shelves Room 109-Main counter: 1. Grout all around main counter, both sides, one missing all together, other cracking or separated. 2. Back wall under Diana desk (yet to be installed?) 3. Seam in main counter uneven 4. All window sills need sanded and stained Gouge in women's restroom wall to left of entrance 5. Cord for pull down door 6. Gap around counter and molding 7 Drawers misaligned 8. Pipe antenna Women's Restroom 1 Putty on brick wall in women's restroom, by commode 2. Hole in bathroom wall 3. Adju=.t door swing Men's Restroom 1 Means room sink could use some caulking Break room 1 Paint chipped around doorframe into kitchen 2. Grout for kitchen counter 3. Glue on laminate over dishwasher Main Workroom 1. Workroom in hallway - corner seam uneven. 2. Chalky wall paint at light switch 3. Glue on cabinet doors Council Room 1 Painted over screw to left of door into council chambers (council member entrance in hall ) 2. Realign Doors Shelly's Office 1. Align bookcase wall 2. Leftwindow, ledge dirty 3. Outlet gouge across from door 4. Paint touch up 5. Sheetrock the alcove on the north side corner Dana's Office 1 General Cleaning Mayors Office 1. Drywall seam lower back wall 2. Doorjamb touch up Cabinetry, 1. Block counter at each end 2. Drill Holes for power/communication cables in counter 3. Fill in above refrigerator 4. Repair Shelly's Book shelf 5. Install shelves with doors in Dana's Office 6. Align all shelf doors where required 7 Check on printer shelf. Slides hard 8. Back wall under counter