Loading...
walk thru blemishes court offices 2-19-04 001 WALK-THROUGH BLEMISHES COURT OFFICES • Paint chips around electrical outlets, on edges and corners of walls, around doors - throughout both offices • Water/white spots on window sill of front office • Baseboard in front office not filled in before painted- open holes • Baseboard in front office not put together all the way. Gaps and holes in between • Close off old EXIT sign opening in back office • Chipped wall not filled in at entry to filing area on top left watt • Stabilize the front counter from the outside Front office light on ceiling has gaps around- looks like it wasn't positioned properly Message Page 1 of 1 Gary Carlson From: Gretchen Fennell [gretchenf@ci.yelm.wa.us] Sent: Thursday, February 19, 2004 1GIG0 AM To: GARY CARL-SON Cc: Agnes Bennick: Barb Bange Subject: WALK THROUGH 2/19/04 Hey Gary, Barb and t only looked at the new community development part. Here are my notes. Door entering area has peek through on paint. Needs another coat to cover these spots Plug in wall socket at left of door is too small for the hole in the wall. Needs finished. Adjacent wall needs texture. Kitchen has oveMpray of paint on cupboards to the right of the sink. Light at corner of front counter area - to the right of Roberta's desk - is not straight and hangs low. Carpet at front counter at the end of Roberta's desk is starting to pull out. Needs the trim work. Roberta's drawers on left side of desk kind of stick when pulled out. Above front counter at the left of Roberta's desk where the drop meets the wall there is texture and paint needed. Finish shelving under Roberta's desk and under front counter Second metal door also has peek through on paint. Needs another coat to cover. i First window on back wall to the left needs texture to cover long strip of damaged wall. Second window from left needs trim work and caulking to finish window. Plug in under this window looks like it doesn't tit and needs repair and texture. Right corner of building after metal door needs texture and upper corner needs texture and paint. Far wall where Grant will be needs texture above windows and windows need sealed (caulking). On same wall coffee spill (not ours) Not all carpet was exposed during walk through. Thank you, Gretchen 2/19/04 Mens & Womens rooms need cleaned Page 1 of 1 Gary Carlson From: Tamil Merriman [tamim@ci.yelm.wa.us] Sent: Thursday, February 19, 2004 1011 AM To: Gary Carlson (E-mail) Cc: Shelly Badger (E-mail); Grant Beck (E-mail) Subject: Notes from Walk-Thru Mena & Womens rooms need cleaned. Paint on upper door jams into mess and worriers rooms Outlet needed in mechanical room Conference room: West wall, between shelves and window, above head level, sheetrock damaged !Southwest corner of conference room, bad corner seam North side of window in conference room has dark scratches in the paint East wall in conference room white scratches near ceiling All door jams have metal showing thru Entry way door and window framing has putty or sheetrock mud on them, needs cleaned off. Roller marks very evident in paint in hallway from court office to lobby, especially near ceiling Wall corner to left of conference room door, between conference room and CDD counter chipped. CDD lobby counter, northeast corner at ceiling, dark staining coming through. West outside wall of kitchen, facing hallway door, patching very bad????? COD Area Plan storage/small work area, paint on both walls very bad Exterior door on east wall of cdd area scratched Wall paint around exterior cdd door scratched BE corner of cdd office (jims office) paint and seam VERY BAD White scratched above jims window Rubber floor trim under cdd big counter not connected to wall, pushed back Shelving in cdd area needs completed Screens on windows. OOOOOOOOOOONO POWER OR PHONE TO ROBERTA'S DESK 00000000000 2/19/!14