Loading...
Quotes 001 Lu„L2U2H14 01 11 e. L74,4 rWPBELL-'r 19t e'.. CAM~/P,~AUT - COX FLOOR COVERING 1002 South 30 Street. Tacoma, WA 98409. Pboae (253) 272-4799. F.(253)272-74u Proposal Dare: June 3, 2004 To: A M. James Company Arm: Jim Wright From: Jim Cate Project: Yelm City Hall - Revised The following is the necessary material needed to change carpet in the Court Room of Ydm City Hall, per specifications provided. Quote does not include carpet demudisposal, nrmimne moving, cleaning/polishing, weekend tabor or sales tax. Cpt - Shaw/Patcraft 410061 Dualityn6110" Here & There 10 oz Carpet Micro Weave Pattern G)op wl 18" Pat em Match $3,032.00 'carpet for Court Room I 1. Thank You, Jim Cate I' Council Chambers Breakdown Construction Phase Material Cost Labor Cost Total Demotition Riser/Bench $475.00 $475.00 Electrical $800.00 $800.00 Total $1,275.00 Carpentry Riser $1,750.00 $3,000.00 $4,750.00 Bench Frame $1,750.00 $1,100.00 $2,850.00 Total $7,600.00 Wall Studs $564.00 $3,120.00 $3,684.00 Insulation $800.00 $975.00 $1,775.00 GWB $900.00 $1,801.00 $2,701.00 Total $8,160.00 Ceiling Frame $1,400.00 $1,325.00 $2,725.00 GWB Ceiling $880.00 $1,625.00 $2,505.00 ACT $1,258.00 $982.00 $2,240.00 Total $7,470.00 Misc. Door Panels $210.00 $125.00 $335.00 Paint $385.00 $579.00 $964.00 Total $1,299.00 Electrical $3,600.00 $5,400.00 $9,000.00 $9,000.00 HVAC $375.00 $1,125.00 $1,500.00 $1,500.00 Total $13,872.00 $22,432.00 $36,304.00 " Cost Savings Eliminate Switch Locations $975.00 $35,329.00 Eliminate Abatement $1,700.00 $34,604.00 All ACT ceiling $1,305.00 $34,999.00 Eliminate can lights, Add 3 2x4 $1,100.00 $35,204.00 $5,080.00 Eliminate All $31,224.00