Loading...
city hall event 4-27-05 001 Message Page 1 of 1 ~J1y/ - Shelly Badger ) 1' C 1~ To: jawright centurytel.net Cc: Grant Beck; Gary Carlson Subject: May 19th City Hall event Jim, it was nice to talk with you this afternoon. I am hopeful that you will be able to attend Yelm Chamber After HoursfUty Hall Open House event on Thursday, May 19th from 5.30 - 7 PM. I will look forward to receipt of the paperwork thatwe discussed so that we can officially close out the project and release the retainage. Please refer to Section V1 of the executed contract and the bid specifications for contract completion information. C The punchlist that was attached to the October 5, 2004 letter from Brent Dille has been completed? We do have a situation that may fall under "warranty work" Between December 17th and April 19th, 2005, we have had to replace 4 ballasts in the new lighting. I am wondering if the electrician should check their installation. When it was only 1, we thought nothing of it, but now that there have been 4, it seems that it is worth a warranty check. Shelly Badger Yelm City Administrator shellvb ci elm.wa us P.O. Box 479 Yelm, WA 98597 360-458-8405 ~Cf «Ic~~1rf0l1 ) /SC I ~~P w~~(1[,r ~cYr+L I i Jc ~Ul)C2o-1 / 4/27/2005 Phase II Punch List Room 106-Agnes Office 'Nos! Nal Room 107-Barb Office: i,--'Updew-Sills Room 108-Work room: Room 105-Safe Room: 3---IRStall-wvalFskeWes Room 109-Main counter: 1 Grout all around main counter, both sides, one missing all together, other cracking or separated. ..k -'a" wAdqF PaRa d@6!f (yet to be p6ta W2) 3. Seam in main counter uneven sRtraRCe 6. Gap around counter and molding Women's Restroom 2-Hele-iR-4aipraeraw~aN Men's Restroom Break room Main Workroom Cl P2 Pt .1 ;9l .-l 3G7ue-ewsaCine4 char, 4 Door Hardware not smooth, catches upon opening 5 touch up paint on door trim Council Room haIL.3 1 Main doors drag 8 scrape tile when opening Shelly's Office 1. Align bookcase wall 4P. Al p 5. Sheetrock the alcove on the north side comer Dana's Office Mayors Office 3. Replace base-very poor job in this room 4- Touch up paint on the wall behind door and on the south wall Cabinetry 1 Block counter at each end 2. Drill Holes for power/communication cables in counters at work room and water dept. desk 4. Repair Shelly's Book shelf 5. Install shelves with doors in Dana's Office 6. Align all shelf doors where required 8. Back wall under counter 9 Additional Shelves a. 2 for Shelly b. 4 for Dana 10. Council Bench a. Fill in staff/council counter elevation change b. End pieces on both ends of the bench c Finish trim on bench d. Install base at bench e. Repair scratch on bench surface f. Fix seam on right side of the arc. g. Finish corners of bench.