Loading...
NAPA parking lot template 8-14-01 001 Amill, Washington State Olympic Region VI/ Department of Transportation office or Project Engineer noughts 9. MacDonald 821 Airport Court SL MS 47447 Secretary of Transportation Tumwater, WA 98504-7447 10;'t 6750 360 90fi]51 T Y. 1-800-833-6388 August i4, 2001 www wsd.t,.a goy City of Yelm P O Box 479 - Yelm, WA 98597-0479 Re: Contract TA 1636 SR 507 / Clark Road UC Improvements Fed. Aid No. STPH-0507(18) Subject: NAPA Parking Lot Attention Shelly A. Badger Attached for your review and signature is Change Order Number 10, "NAPA Parking Lot Improvements" This is a City requested Change Order. This Change Order establishes three new pay items. The first item shall include installing a Type 1 Catch Basin including connecting to existing pipe and the asphalt patching of the existing asphalt concrete pavement. The second item shall include installing approximately 50 meters of Extruded Curb Type 6 or Type 3 The third item shall include sod needed to transition from the edge of sidewalk to asphalt parking lot, approximately 110 square meters of sod The property owner will be responsible to maintain the sod Please sign the attached Change Ol der and return by August 24, 2001 If you have any questions, please call Michael McConnon at (360) 570-6766 Sincerely, NEAL J CAMPBELL P.E. Project Engineer NJC/pg MJWJf7 Y I Attachments cc. TA 1636-7 #10 SFD01-9, 240 ' c City of Yelm PO Box 479,105 Yelm Ave W Yetm Washington 98597 360-458-3244 360-458-4348 fax www.ci.velm.wa.us CHANGE ORDER PROPOSAL Date Page _ of _ Pages Project Title: Change Order Number Prime Contractor ? Requested by City under the terms of Section 7 01 of the Standard Specifications ? Change proposed by Contractor Endorsed by: Contractor Date Original Contract Amount: Current Contract Amount: Estimated Net Change This Order Estimated Contract Total After Change: ? Approval Recommended Project Manager Date ? Approved City Administrator Date CHANGE ORDER Page of Project: Change Order Number: Change Order Date: To: All work, materials, and measurements to be in accordance with the provisions of the Standard specifications and Special Provisions for the type of construction involved. This contract is proposed to be revised as follows: Description: Constructing Requirements: Measurement: Payment: