NAPA parking lot template 8-14-01 001
Amill,
Washington State Olympic Region
VI/ Department of Transportation office or Project Engineer
noughts 9. MacDonald 821 Airport Court SL MS 47447
Secretary of Transportation Tumwater, WA 98504-7447
10;'t
6750
360 90fi]51
T Y. 1-800-833-6388
August i4, 2001 www wsd.t,.a goy
City of Yelm
P O Box 479 -
Yelm, WA 98597-0479
Re: Contract TA 1636
SR 507 / Clark Road UC Improvements
Fed. Aid No. STPH-0507(18)
Subject: NAPA Parking Lot
Attention Shelly A. Badger
Attached for your review and signature is Change Order Number 10, "NAPA Parking
Lot Improvements" This is a City requested Change Order.
This Change Order establishes three new pay items. The first item shall include
installing a Type 1 Catch Basin including connecting to existing pipe and the asphalt
patching of the existing asphalt concrete pavement. The second item shall include
installing approximately 50 meters of Extruded Curb Type 6 or Type 3 The third item
shall include sod needed to transition from the edge of sidewalk to asphalt parking lot,
approximately 110 square meters of sod The property owner will be responsible to
maintain the sod
Please sign the attached Change Ol der and return by August 24, 2001
If you have any questions, please call Michael McConnon at (360) 570-6766
Sincerely,
NEAL J CAMPBELL P.E.
Project Engineer
NJC/pg
MJWJf7
Y I
Attachments
cc. TA 1636-7 #10
SFD01-9, 240
' c City of Yelm
PO Box 479,105 Yelm Ave W
Yetm Washington 98597
360-458-3244
360-458-4348 fax
www.ci.velm.wa.us
CHANGE ORDER PROPOSAL
Date Page _ of _ Pages
Project Title:
Change Order Number
Prime Contractor
? Requested by City under the terms of Section 7 01 of the Standard
Specifications
? Change proposed by Contractor
Endorsed by:
Contractor
Date
Original Contract Amount:
Current Contract Amount:
Estimated Net Change This Order
Estimated Contract Total After Change:
? Approval Recommended
Project Manager Date
? Approved
City Administrator Date
CHANGE ORDER Page of
Project:
Change Order Number:
Change Order Date:
To:
All work, materials, and measurements to be in accordance with the provisions of
the Standard specifications and Special Provisions for the type of construction
involved.
This contract is proposed to be revised as follows:
Description:
Constructing Requirements:
Measurement:
Payment: