Loading...
Cost Estimates 4-2-03 001 Page 1 of I Shelly Badger From: 'Rory Connally' <rory@architectsbcra.com> To: "Shelly Badger" <shelly@yelmtel.com> Sent: Wednesday, April 02, 20031030 AM Subject: RE. ? on cost estimates Shelly, The $180,000 includes work in the admin area. The $49,000 should be subtracted from the $180,000 if you choose to delay all work in the admin area. About $10,000 to $20,000 would have to be added to the $180,000 if you went with the Alternate A version of the admin area. I will work on fne-tuning a cost estimate for Alternate A and e-mail it back to you and Grant today. Thanks, Rory -----Original Message----- From: Shelly Badger [mailto:shelly@yelmtel.com] Sent: Tuesday, April 01, 2003 1:24 PM To: rory@architectsbcra.com Subject: ? on cost estimates Rory, Grant forwarded to me the e-mail which included cost estimates for the entire project + the admin wing. I am not clear how to read the admin wing estimate.... is the $49,785 in addt to the $180,252 if we choose option A? We are quite fond of option A so it is important to us to understand its cost implications. Thanks, Shelly Shelly Badger Yelm City Administrator P.O. Box 479, Yelm, WA 98597 360-458-8405 shelly@yelmtel.com 4-7/2003 Completed. 3126103 CITY OF YELM REMODEL Page let 1 YELM CITY HALL CONSTRUCTION COST ESTIMATE: ADMIN. WING BUDGETARY COST ESTIMATE PROJECT COMPONENT REMARKS Quantity Unit $SS Est. Cost BASE ESTIMATE SUMMARY BREAKDOWNS: (includes 20% Contractor G.R., 01 MI Mark-Ups: No Sales Tex) Remodel Work 100 LS $49,]8500 $49.]8500 Sae Pages 2 and 3 for estimate details. TOTAL ESTIMATE BUDGET: 4,000.00 SF $12.45 $49,T05.00 NOTES'. All the above pricing includes a 20% contractors mark-up to cover general requirements, Overhead 8 profit. bond 8 insurance Soft costs, such az sales tax. permits, design fees, and owners administration tests, are not included. Quantit Unit S$$ Eat. Cost REMODEL WORK:: REMARKS Remove existing ACT ceilings. 50000 SF $0.50 $25000 Remove emitting finished flooring 1.00000 SF $0.50 $500.00 In remodeled areas, assumed to mostly be existing carpet. Remove resting wall Won. 1 00 MD $45000 $450 00 Removal of ansdng casework 8 specialties. Slab cuts 8 patches for new waste lines. 60.00 LF $6000 $3,600.00 Allowance for lines to new sink fixtures. Remove existng interior partitions. 7000 LF $10.00 $70000 Per demo dwg, assumed to be gage flamed, 9 to 10 high Miscellaneous patches and restoration 1 00 MD $450 00 $480.00 Allowance, assumed to be relatively light General clean-up. 1 00 MD $36000 $360.00 Allowance D.-Vision' $b, 34000 New, interior partition trammg. 30 00 LF $2500 $750 00 Per new floor plan layout assumes 10 high partitions. Sound batt insulation. 3000 LF $250 $]e.Old In most new Interior partitions. GWB walls finches. 70000 SF $1,20 $84000 At new wall foaming. Tia-me bracing and coordination, 200 MD $00000 $ 1, 00000 Allowance. Partitions. $2,66500 Reused doors installed 100 Ea $80000 $800.00 Per Door Schedule, new homes and some new hardware. New interior walk doors 1 00 E. $600.00 $60000 Per Door Schedule in Intend, assumes non-grouted tramps. New interior wall hellos. 2.00 Be $400 00 $80000 At Reception Court and CCD Open Office, non granted frames. Downdnw: $2200.00 Paint new and existing walls in remodel areas. 4800 00 SF $035 $1.68000 At all wall surfaces in remodeled areas only Finish new 8 reused doors in remodel areas 2.00 Ea $75 00 $150.00 Per floor plan and Door Schedule. includes new wall cores. Painting pick-up and touch 11, 2 00 MD $52000 $1,040 00 Allowance New and reused suspended acoustic ceilings. 500,00 SF $1 00 $500 00 In materialist areas, some salvaged ceilings to be reused. New VCT flooring. 30000 SF $1]0 $51000 Per remodeled floor plan and schedule. New sheet vinyl. 5000 SF $300 $15000 In portion of Storage 021. New carpet flooring 82000 SF $3.50 $287000 Assumed to be a heavy duty commercial carpel. Rubber walk mats. 150.00 SF $T 00 $1, 05000 At Lobby and poNOn of Entry 023. New rubber base throughout remMel areas 45000 LF $1.65 $]42.50 Throughout remodeled areas. Finish tie-ins and pick-up 100 MD $50000 $50000 Allowance ,assumed to be minor Miscellaneous interior lnm. 100 MO $54000 $540.00 F 2 nishes : , scope to be determined Interior signage 100 ITS $350.00 $350 00 Allowance Fire extingwehers and cabineh. 100 ITS $15000 $15000 Residential appliances. 1.00 LS $1500.00 $1,500 00 Range, refrigerator. microwave, andercounler reGgerator Spegal5aa. $2.00000 Base counter 8 casework door in Lobby 00 L 2500 LF $13000 $3.25000 Assumes open shelving under countertops. Uppers and lowers in Break Room 010 10.00 LF $220 00 $2.20000 Per door plan. CaSewurk, $5.45000 New plumbing fixtures. 100 Ea $180000 $180000 New sinks in Break Room and Storage 021 Tie-ms and plumbing pick up. 1.00 LS $800 00 $80000 Allowance Plumbing $260 00 Overhead HVAC revamp in remodeled areas. 2,500 00 LS $1 00 $2500 00 Allowance, scope to be determined Air balance tie-ins and HVAC pick-up. 1,50000 LS $100 $1.500.00 HVAC. $4.000,u) Power revamp in remodeled areas 1 00 LS $3,00000 $300000 Allowance. ass in panels. Includes demo. New lighting in remodeled areas 100 LS $2,00000 $2 000.00 Allowance. assumes some existing fixtures may be reused. Fire alarm revamp in remodeled areas 1 00 LS $500.00 $500.00 Allowance, scope to be determined Communications in remodeled areas. 1 00 LS $50000 $500 00 " Elachmal Lens and pickup. 1 00 ITS $500 00 $500 00 Electrlrnl' $5.50000 REMODEL WORK. 4,00000 SF $19 3] 341 48T 511 Add for 20S General Contractor Mark-Ups 400000 SF $1245 ~$49]ee 00 For. Architects BCRA-Tsang PRELIMINARY ESTIMATE From. Bill Acker Consulting 6ernser Completed. 3/26/03 CITY OF YELM REMODEL Page 1 of 1 YELM CITY HALL CONSTRUCTION COST ESTIMATE: ADMIN. WING BUDGETARY COST ESTIMATE PROJECT COMPONENT REMARKS Quantity Unit Est. Cmd BASE ESTIMATE SUMMARY BREAKDOWNS: Includes 20% Contractor G.R., Oli B81 Mark-U s; No Sales Tax Remodel Work 1.00 ITS $49,78500 $49,78500 See Pages 2 and 3 for estimake details. TOTAL ESTIMATE BUOGET: 4,000.00 SF $12.45 549.185.00 NOTES: All the above pricing includes a 20% contractors mark-up to cover general requirement, overhead 8 profit, bond 8 insurance. Soft costs, such as sales tax, permit, design fees, and owner's administration costs, are not included. Quantity Unit Esc Cost REMODEL WORK:: REMARKS Remove coming ACT Ceilings. 50000 SF $0.50 $250.00 Remove existin,gy, finished floor, 100000 SF $050 $500.00 In remodeled areas. assumed to mostly be existing carpet. Remove existing wall fixtures 100 MD $450.00 $45000 Removal of existing casework 6 specialties. Slab cuts 8 patches for new waste lines. 60.00 LF $6000 $3,60000 Allowance for lines to row sink fixtures Remove existing interior panifima 10 00 LF $10.00 $100 00 Per demo away, assumed to be gage framed, 9' to 10' high. Miswllanaons patches and restoration. 1 00 MD $480.00 $48000 Allowance, assunned to be relatively light. General clearrup. 1.00 MD $360.00 $36000 Allowance. Degraften: $8,34000 Newmtenor patraph framing. 3000 LF $25.00 $]50.00 Per new floor plan layouts es 10 high partiflons. Sound banlrsulation. 30.00 IF $250 $75.00 In most new interior paditlonsLnn GWB walls finishes. ]00.00 SF $120 $840.00 At new wall framing. Tie-ins, bracing and coordination 200 MD $500.00 $100000 Allowance. PartRiors $2,665.00 Reused doors installed. 1.00 Ea $80000 $800.00 Per Door Schedule, new fames and some new hardware. New interior walk doors. 1.00 Ea $600.00 $60000 Pei Door Schedule in interiors, assumes homgrouted frames. New interior wall reffes. 200 Be $400.00 $80000 At Reception Court and CCD Open Office non-grouted frames. Dec'Mnday $2,20000 Paint new and existing walls in remodel areas 4,800.00 SF $0.35 $1,660.00 At all wall surfaces in remodeled areas only. Finish new 8 reused doors in remodel areas. 200 Be $75.00 $15000 Per floor plan and Door Schedule, IMILides how wall relites Painting pick-op and tonchrup 2.00 MD $52000 $1,04000 Allowance. New and reused suspended acoustic ceilings. 600,00 SF $1.00 $50000 I n remodeled areas. some salvaged ceilings to be reused. New VCT flooring. 30000 SF $1]0 $510.00 Per remodeled floor plan and schedule. New sheet vinyl. 50.00 SF $300 $150.00 In portion of Storage 021. New carpet flooring 82000 SF $3.50 $287000 Assumed to be a heavy duty commercial carpet. Rubber walk mats. 150.00 SF $100 $1,050.00 At Lobby and porton of Entry 023. New rubber base throughout remodel areas. 45000 LF $1.65 $74250 Throughout remodeled areas Finish tie-ins aM pick-up 1 00 MO $500.00 $50000 Allowance, assumed to be hashim Miscellaneous manor inm. 1.00 MD $540.00 $540.00 ' Finishes. $9,23250 Interiorsignage 100 ITS $350.00 $35000 Allowance, scope to be determined Fire extinguishers and chimets. 1.00 LS $15000 $150.00 " Residential appliances. 100 LS $1,500.00 $150000 Range, reingeratoq microwave, undercounter refrigerator Specialties $2,00000 Base counter 8wsevers door in Lobby 001. 25.00 LF $13000 $325000 Assumes open shelving under countertops. Uppers and lowers in Break Room 010. 1000 LF $22000 $2,20000 Pen float plan. Casework $5,45000 New plumbing fixtures. 100 Es $1,80000 $180000 New sinks in Break Room and Storage 021. Tie x5 and plumbing pickup. 1.00 LS $80000 $800 e0 Allowance. Plumbing: $2,600.00 Overheatl HVAC revamp in remodeled areas, 2,50000 LS $1.00 $2, 50000 Allowance, scope to be determined. Air balance, horns and HVAC pick-rip. 150000 LS $1.00 $1,50000 " HVAC. $4,000.00 Power revamp in remodeled areas. 100 LS $3,00000 $3,000.00 Allowance. assumes no new main panels, includes demo New lighting in remodel" areas 1 00 ITS $2,000.00 $2,000.00 Allowance, assumes some existing fixtures may be reused Fire alarm revamp in remodeled areas. 100 LS $500.00 $500.00 Ailowance, scope to be determined Communication in remodeled areas. 1.00 LS $50000 $50000 " Electrical tie-ins and pick-up. 1.00 LS $50000 $50000 " Electrical $6500.x REMODEL WORK: 4,000.00 SF $10.31 $41,481.50 Add for 20%General Contractor Mark-U s. 4,00000 SF $1245 $49,18500 For Arehitant BCRA-Taarg PRELIMINARY ESTIMATE From Bil AOkerconulbig Sarrneas