Loading...
1Plan Punchlist (2)PROJECT: AUTUMN HILL ITEM COMPLETE NOT COMPLETE NOT APPLICABLE COMMENTS Final Plat Punchlist complete, or agreement for completion ~ ~ ~ Will Need As -Built Drawings -After all punchlist items have been corrected. ^ ~ ~ Will Need 11 -Full Size Plans ~ ~ ~ Will Need 1 - 11 X 17 Copy of Plan ~ ~ ~ Will Need Mathematical Lot Closures and Street centerline closures, and square footage of each parcel ^ ~ ~ Will Need Mathematical boundary closures of the subdivision showing the error closure, if any ^ ^ ^ Engineering/Survey and other applicable Fees Paid ~ ~ ~ At final Plat Plat Certificate ~ ~ ~ Will Need Warranty Agreement ~ ~ ~ Will Need Water Bill of Sale ~ ~ ~ Will Need Sewer Bill of Sale ~ ~ ~ Will Need Waiver of Protest for any Improvements Stormwater Maintenance Agreement ~ ~ ~ Will Need Water Rights Agreement (if Applicable) Homeowners Agreement (Covenants and Restrictions, Articles of Incorporation/Bylaws) ~ ~ ~ Will Need Copy of any Deed Restrictions applicable Page 1 of 2 ITEM COMPLETE NOT COMPLETE NOT APPLICABLE COMMENTS Copy of any Dedication requiring separate documents A phasing plan (if applicable) Final drawings on disk in Auto Cadd format ~ ~ ~ Will Need School Mitigation Agreement ~ ~ ~ Will Need Street and Address Plan ~ ~ ~ Will Need Sepa Mitigation ~ ~ ~ TFC at BP /School Mitigation Open Space Final Improvements completed - or - Fee in Lieu of ^ ^ ^ Dedication of Open Space on Face of Plat and in CCR Landscaping and Irrigation Plans, to include Perimeter, Planting Strips, Open Space, and Stormwater Facilities ^ ~ ~ LOOKS GREAT Face of Plat to include: TFC, School Mitigation Fees, Easements, Deed Restrictions, and Dedications. ^ ~ ~ Will Need Water and Sewer LID /Latecomers Abandonment of Well/Septic/Drainfield ~ ~ ~ Will Need Assigned Savings for any Improvements Summary of how developer has met all conditions of approval ~ ~ ~ Will Need Misc: C:\DOCUME~1\R_ALLEN\LOCALS~1\Temp\ELF7117\1 Plan Punchlist.doc Page 2 of 2