Loading...
858 Attachment A ~ ATTACHMENT A Ordinance 858 CITY OF YELM COMPREHENSIVE PLAN TABLE OF CONTENTS VOLUME 1 I. Introduction - I 1 A. Intent ...........................................................................................................1 - 1 B. Content I - 1 C. Applicability _ I 3 D. Consistency I - 5 The Planning Cycle (figure) I- 6 II. Growth Management Act Planning Parameters II - 1 A. Policies II - 1 B. Population and Demographics I I- 4 C. Urban Growth Area Boundaries II - 6 D. The Planning Sub-Areas II - 7 E. Public Participation II - 10 ~ I II. Land Use I I I- 1 A. Policy Guide I I I- 1 B. Land Use Patterns III - 3 C. Changing the Land Use Map III - 4 I D. Interqovernmental Coordination ' III - 4 E. Transfer of Development Rights Program - III 4 I F. The Planning Sub-Areas - Citv of Yelm and UGA Land Needs Assessment III - 5 IV. Housing ..........................................................................................................IV - 1 A. Introduction ...............................................................................................IV - 1 B. Inventory and Analysis ..............................................................................IV - 2 C. Goals and Policies ..................................................................................IV - 15 D. Future Needs and Alternatives ................................................................IV - 16 V. Public Facilities & Utilities ................................................................................V - 1 A. Introduction ................................................................................................V - 1 B. County-Wide Planning Policies ..................................................................V - 1 C. Public Facilities ..........................................................................................V - 2 D. Private Utilities ...........................................................................................V - 6 E. Overall Goals and Policies .......................................................................V - 10 i MAPS Map 1 Urban Growth Boundary Map 2 Existing City Limits and Zoning Map 3 Future Land Use Map 4 Critical Areas, Streams, Wildlife, Wetlands Map 5 Critical Areas, Geoloqic Hazard Areas Map 6 Critical Areas. Frequentlv Flooded Areas Map 7 East Planning Subarea Map 8 South Planning Subarea Map 9 Southwest Planning Subarea Map 10 Northwest Planning Subarea ~ , , APPENDICES VOLUME 2 Appendix A Yelm Comprehensive Transportation Plan, August 1992 and as amended VOLUME 3 Appendix B Yelm Comprehensive Water Plan, August 1994 and as amended VOLUME 4 Appendix C Yelm Comprehensive Sewer Plan, August 1994 and as amended VOLUME 5 Reference Documents: Appendix D Yelm Parks Plan, 1987 and as amended Appendix E Yelm Economic Development Summit, 1988 and as amended Appendix F Yelm Visioning Plan and as amended Appendix G Private Utility Planning for the Yelm Area and as amended 1. Electric 2. Gas 3. Telephone 4. Cable ( Appendix H Draft Joint Plan (May 1990) ~ iii Chapter XI Visioning no "A~ Chapter XII Environment no Chapter XIII Historic Preservation no Chapter XIV Miscellaneous Provisions no Exhibit A County-Wide Planning Policies (August 1993) yes Exhibit B Population Projections yes Exhibit C Yelm Open Space Ordinance, amended 8/94 no Exhibit D Interim Yelm Critical Areas Resources Land Ordinance, no 9/92 Exhibit E Regional Transportation Improvement Program, 1995-1997 (September 1994) no Exhibit F Essential Public Facilities Comprehensive Plan Provisions (January 1994) yes , ~e Map 1 Urban Growth Boundary yes Map 2 Existing City Limits and Zoning no Map 3 Future Land Use yes Map 4 Critical Areas, Streams, Wildlife, Wetlands a~ yes Map 5 _ Critical Areas, Geoloqic Hazard Areas Aq~i#e~ yes ~es+g~+e~ Map 6 Critical Areas, Frequentlv Flooded Areas yes Map 7 East Planning Subarea yes Map 8 South Planning Subarea yes Map 9 Southwest Planning Subarea yes Map 10 Northwest Planning Subarea yes ~ , , ~es Appendix A Yelm Comprehensive Transportation Plan, August 1992 yes Appendix B Yelm Comprehensive Water Plan, August 1994 no Appendix C Yelm Comprehensive Sewer Plan, August 1994 no Appendix D Yelm Parks Plan, 1987 Appendix E Yelm Economic Development Summit, 1988 Appendix F Yelm Visioning Plan, [pending] Appendix G Private Utility Planning for the Yelm Area 1. Electric 2. Gas 3. Telephone 4. Cable I ~ I-2 ~ ATTACHMENT A Ordinance 858 CITY OF YELM COMPREHENSIVE PLAN TABLE OF CONTENTS VOLUME 1 I. Introduction I - 1 A. I ntent - I 1 B. Content I - 1 C. Applicability I - 3 D. Consistency I - 5 The Planning Cycle (figure) I- 6 II. Growth Management Act Planning Parameters II - 1 A. Policies - II 1 B. Population and Demographics - II 4 C. Urban Growth Area Boundaries II - 6 D. The Planning Sub-Areas - II 7 E. Public Participation - II 10 ~ I II. Land Use I II - 1 A. Policy Guide I I I- 1 B. Land Use Patterns - III 3 C. Changing the Land Use Map III - 4 I D. Interqovernmental Coordination ~ ~ III - 4 E. Transfer of Development Rights Program III - 4 I F. The Planning Sub-Areas - City of Yelm and UGA Land Needs Assessment III - 5 IV. Housing ..........................................................................................................IV - 1 A. Introduction ...............................................................................................IV - 1 B. Inventory and Analysis ..............................................................................IV - 2 C. Goals and Policies IV - 15 D. Future Needs and Alternatives ................................................................IV - 16 V. Public Facilities & Utilities - ................................................................................V 1 A. Introduction _ ................................................................................................V 1 B. County-Wide Planning Policies ..................................................................V - 1 C. Public Facilities _ ..........................................................................................V 2 D. Private Utilities ...........................................................................................V - 6 E. Overall Goals and Policies ..................................V - 10 i II. GROWTH MANAGEMENT ACT PLANNING PARAMETERS A. Policies Note: See Chapter 1, Paqe 1, Introduction, B. Content which identifies portions of the plan applicable to the Citv and UGA areas and C. Applicabilitv for a list of the goals and policies applicable to the unincorporated portion of the Yelm UGA ~,,,.,+o.~ ~vhih~+ ~ ~n addition reiterates the portions of the plan adopted by Thurston Countv. 1.* Growth Management Act The City of Yelm is participating in comprehensive planning under the provisions of the Growth Management Act, Chapter 36.70A RCW. The purpose of the Act is to promote responsive, responsible local planning to accomplish thirteen identified statewide goals. The following State Growth Manaqement Act goals are adopted to guide the development and adoption of comprehensive plans and development regulations of those counties and cities that are required or choose to plan under RCW 36.70A.040. The following goals are not listed in order of priority and shall be used exclusively for the purpose of guiding the development of comprehensive plans and development regulations: (1) Urban growth. Encourage development in urban areas where adequate public facilities and services exist or can be provided in an efficient manner. (2) Reduce sprawl. Reduce the inappropriate conversion of undeveloped land into sprawling, low-density development. (3) Transportation. Encourage efficient multimodal transportation systems that are based on regional priorities and coordinated with county and city comprehensive plans. (4) Housing. Encourage the availability of affordable housing to all economic segments of the population of this state, promote a variety of residential densities and housing types, and encourage preservation of existing housing stock. (5) Economic development. Encourage economic development throughout the state that is consistent with adopted comprehensive plans, promote economic opportunity for all citizens of this state, especially for unemployed and for disadvantaged persons, promote the retention and exqansion of existinq businesses and recruitment of new businesses recoqnize repional differences impactinq economic development opportunities, and encourage growth in areas experiencing insufficient II-1 CWPP, as applicable, will be implemented in the City of Yelm and the UGA. The County-Wide Planning Policies are specifically adopted as the policy base for the Joint Plan in both the incorporated and unincorporated areas of the Yelm I UGA . 3. City of Yelm's Objectives a. Background The City of Yelm is a small town located in Northeastern Thurston County at the junction of two state highways. Growth in the vicinity is determined by the community's proximity to Fort Lewis and the rapidly growing Pierce County area, from Puyallup and Fredrickson toward the north, to Spanaway and Roy toward the south. The City of Yelm is also subject to growth pressures spilling over from the Thurston County metropolitan area and particularly the Lacey/East Lacey suburbs of the Lacey UGA~a~ It is expected that the growth induced by the development of the major planned communities at DuPont, Meridian Campus, and Hawks Prairie will also spur growth in the Yelm area, as will the Thurston Highlands Planned Community, which is being designed to reach the recreational/golf/retirement market which does not now exist in the area as a focus development. In addition, Yelm is the urban center providing many of the urban services for a large suburban/rural community located in the Northeast Thurston County area. b. Comprehensive Plan Purpose The purpose of Yelm's Comprehensive Plan is to identify how the City will prepare for and deal with growth which it is legally required to ~ accommodate under the State Growth Management Act, as well as the other forces which will shape and guide the community in the future. Yelm's Comprehensive Plan is a continuation of the Joint Planning process between the City of Yelm and Thurston County prior to 1990. (That Draft Plan is included as Volume 5/Appendix H for reference purposes, but is superseded by this Comprehensive Plan for all policy purposes). The stated purpose of that Joint Plan was "to promote consistency of local plans and certainty about future development," which continues to be the focus of City planning under this Comprehensive Plan. The Comprehensive Plan identifies the policy base for implementing the County-Wide Planning Policies (copy attached at Exhibit A) within the ~ Yelm UGA , including both incorporated and unincorporated Urban Growth Areas. ~ II-3 ~ Cities and counties are obliqed to conduct their planning usinq poqulation forecasts that are consistent with those developed for their county bv the Office of Financial Manaqement (OFM). This means that the forecasts used bv each countv must fall within the ranqe of the Hiqh, Intermediate, and Low OFM series. Each countv then determines the qrowth allocations for each citv and its UGA, in consultation with the cities. In its Countv-Wide Planninq Policies, Thurston Countv determines what forecast to use within the OFM ranqe bv relving on the forecasts of the Thurston Reqional Planninq Council (TRPC). Likewise, the Countv relies on TRPC to determine realistic allocations of population, in consultation with the cities. The most recent small area (citv and rural) TRPC forecast was released in Julv 2005 and adopted in 2006. 2. Basis for Public Facility and Utility Planning The City of Yelm uses the ~ , , h., +ho .,o~~ ~n~ Medium Densitv (population of 11,480 bv 2030) for planning utilities and public facilities within the city limits and UGA . The use of the - Medium Growth assumption for such planning is consistent with the regional model adopted as part of the regional allocation process. The City may also use a 50-year planning horizon for certain portions of public facilities as detailed in public facility plans. 3. Range of Accuracy on Projections and Trends ~ The h, ~rcfnn Qo,,;,,.,,~ o~.,,,.,,.,,, r,,,,.,,.,~ ~TRPC} has completed population and emploYment prolections beqinninA in the 1970's. The County-wide lonq ranqe proiections have proven to be qenerallv reliable. The smaller scale (e g individual cities) and shorter time periods (e.q. 5- 10 vears) are more variable Consepuentlv, the TRPC tracks qrowth and updates the proiections everv 3-5 vears or so in order to make adiustments to proiections that can be as accurate as possible for countv, citv and urban qrowth areas. ~*~+°^~e^+ ^f ~ ~~e^;~;^ 0 0 ~ Dl~n r~eviJ he re~iio~~~er! nr m~rlifor) 4. Yelm School District Growth Planning The Yelm School District enrollment increased bv an averaqe annual rate of 2.4% between the 1990/1991 school vear and the 2000/2001 school vear Between the 2003/2004 and 2004/2005 school years the rate of change was 4.2%. The school district will track student qrowth for planninq purposes by determininq the student production rate per household ,r~+.... ~,~d 7. ric ~ h.~ n i ~ i e--6. i+~ i I i m i~e. \ ~ ~ c~ ~+-~v~-~~1~Yttf-F°+cic~i{i- Cli r.c7-i QL'e"'~.~7--6e'~CGY- t II-5 ~ 3. Urban Growth Area Boundaries 7 I nnn_Torm i ir~e Rn~~nrl~rio ~ e ~ • The Plan identifies ~~ie#-~e~growth boundaries which are designed to encourage development at urban levels of density on urban services. The City of ~ Yelm will not annex beyond the ~"^~rUrban Growth bBoundary and will extend utilities beyond the City limits only when a public health emergency requiring such action is approved by the County, and will not impose a financial burden on the City. T",~he~w-~ ~~a; ~~es~il;-o r~„~~,~,~~ ~o~~ +h.,., ~TC, v~ c,~~ r c~ aTrva-rc.T•a crn'~rT D.'~ The Planning Sub-Areas I 1. "East" Planning Area (see Map 7a-A) The East Planning Area is bounded by the Burlington Northern Railroad tracks on the west, the Centralia Power Canal on the north and east, and State Route 510 on the south. a. Urban Growth The East Planning Area is characterized by significant commercial ~ development within the City. The UGA is presently characterized by a well-established road network and areas of urban and suburban densities, as well as some property at lower densities, and a potential for future growth. The land is relatively free of environmentally sensitive lands, other than the aquifer which is shallow and uncapped, and is generally suitable for more intensive development provided groundwater I controls are established. ~ ' ~s~~, a~~e~l °-~--;,Phased utility planning will be used to facilitate development at urban levels of density. b. Municipal Utilities The East Planning Area is within the water service area of the City and development at any higher-level density requires sewers, since most of the area is underlain by an uncapped drinking water aquifer. Lower density areas are presently served by water, but not sewer services. Areas using on-site septic systems would be regulated through a ~ sewer/septic utility, until sewers and higher density development +sare available. c. Logical Boundaries The railroad, the state highway, and the canal make logical physical boundaries for the East Planning Area, which is one of the two planning II-7 being planned as the Thurston Highlands Community. The area will have ~ a mix of single family and multifamily residential uses as well as open space, parks, school sites, and commercial spaces. The overall average I density of the Planned Community is ~ 4 units per acre (qross densitv). b. Municipal Utilities All of the growth in the Southwest Planning Area is planned to be served by sewer and water from the City of Yelm. Any on-site systems approved in advance of sewer approval will be required to participate in and hook up to the extended sewers and would be subject to the City septic maintenance utility. The area is projected to contain a main water reservoir for the City, as well as a storage facility integrated into the golf course ponds, for irrigation water storage. The irrigation water may be recycled from the City's water treatment facility. c. Logical Boundaries The Southwest Planning Area is marked by a single large property ownership, Thurston Highlands, which is completely within the present City limits. Fort Lewis, 93rd, and the state highways are all used for planning purposes to define limits of sewer and water service areas and provide a logical boundary. ~ The ~Urban Growth Boundarv area includes an Environmentally- Sensitive/Agriculture area. The area is surrounded by roads, utilities, and ~ other urban development, and is included to ensure a logical and cost- effective service area boundary. I 4. "Northwest" Planning Area (see Map 10~) The Northwest Planning Area is bounded on the north by the Centralia Power Canal, on the east by the Burlington-Northern Railroad, on the south by 93rd Avenue and SR 510, and on the west by the north-south centerline of Section 14, Township 17N, Range 1 E and the south line of the north half of Sections 13 and 14, Township 17N, Range 1 E. a. Urban Growth The easterly portion of the Northwest Planning Area is comprised of one of the most rapidly growing areas in Yelm. The westerly portion, although of a lower residential density, is characterized by the Knight complex, which is used for education, publication, and other business uses, and often hosts programs which result in a periodic influx of visitors for public gatherings. b. Municipal Utilities The easterly portion of the Northwest Planning Area is to be accommodated by sewer and water service. The westerly portion is II-9 III. LAND USE A.* Policy Guide Note: See Chapter 1, Paqe 1, Introduction, B. Content which identifies portions of the ~lan_applicable to the Citv and UGA areas and C. Applicability for a list of the goals and policies applicable to the unincorporated portion of the Yelm UGA _+s The purpose of this Land Use Section of the Comprehensive Plan is to identify a pattern of development which will: 1. Promote infill at urban densities; 2. Permit cost effective phasing of urban utilities to enable the community to sustain project growth patterns; 3. Identify policies to guide development regulations which will allow implementation of the Yelm Comprehensive Plan and Joint Plan; and 4. Provide a plan in which the required population is accommodated consistent with the State Growth Manaqement Act and goals and policies of this Comprehensive Planl a~consistent with the community resources. r- B. Land Use Patterns Be~ele~~~a#~er-~~s a~s~^ T~-r~a~-E~lap-~-*T4 n, , , ~H6k1 ~9~R--~~~c .~,~-.ri+rn-~rT~-~~~-A,f--vr2~Fl-1--~~G--~~'~2~'f~-A~~c°-`r'2~ApR~-~°-P?i-r ^'cq 'urr'r°c~~ 1. Existing Land Use Designations. Within the city limits, the City of Yelm's current land use patterns are shown on ~ Volume I, Map 2, which shows the existing ~994} zoning of the Yelm area. Development regulations will modify density, use, and other standards to be consistent with the criteria below. 2.* Proposed Land Use Designations. The future land use plan is to be adopted as the land use and pre-annexation zoning for the City of Yelm. Properties which annex to the City will annex at the identified land use subject to the utility availability overlay. a. Residential I The residentiallv zoned areas provide for the bulk of the housing development in the planning areas. Minimum densities se III - 1 developments must be able to screen or buffer impacts of non- ~ residential uses from existing or potential residential developments, and contain all open space and recreation areas within the site. The minimum acreage for a mixed use development shall be 40 acres. Mixed use developments may have 5% of the gross area in ~ neighborhood commercial - no commercial use is to be larger than 5,000 square feet, 25% of the net land area in medium density or high density apartments, and 25% of the gross land area in open space, with not less than 5 acres of improved park space dedicated to the City. Development standards should be created to encourage mixed-use subdivisions. The "mixed use" alternative must be processed as a project and applies only to eligible properties. I b. The Environmentallv Sensitive Area lESAZ category a~epertains to properties that are in the ~ urban rg owth area but presently in agricultural use and affected by critical lands with environmental limitations. !~^~e-~Tar~-~~#le~*~g~~el^~e~+ ^~;~a~vw'~-#~i~,~~~e c. Commercial Yelm has identified three levels of commercial categories to meet community needs: Neighborhood Service/Professional Office, General ~ Retail/Commercial Core, and a Commercial Service district (larger and more intensive commercial uses, including auto and machine oriented, modular housing, and recreational sales, service, and repair. d. I ndustrial/V1/arehouse Yelm has identified finro industrial categories which are on major transportation routes, near existing utilities, and capable of being buffered for other needed development to avoid undue impact on the community. The two categories are to serve community needs: warehouse, assembly, and distribution; and manufacturing/industrial, focusing on the production of goods, utilities, or services. The former are more appropriate on the perimeter of the industrial area, the latter designed to be included in the industrial core. The County will consider rezoning the industrial- designated area to a light industrial zone, Chapter 20.28 Thurston County Code, prior to annexation. e. Public Institutional/Open Space Yelm has identified two land use designations or categories which reflect public ownership of the land or land permanently set aside as dedicated open space or critical areas. Public purpose lands which are presently identified are shown on the Future Land Use Map, Map #3. ~ III - 3 E.* Transfer of Development Rights Program The City of Yelm supports the Transfer of Development Rights program to support ~ certain rural programs. Proper regulations need to assure that such a program is not counterproductive to urban goals and objectives of this plan. The City ~ and County have established a county-wide Transfer of Development Rights program, in which some portion of the density range within the low-density residential designation is achievable through the purchase of transferred development rights rather than allowed outright. The objective of a county-wide Transfer of Development Rights program is to support conservation of important natural and/or cultural resources (e.g. long-term agricultural lands, historic properties, or significant wildlife habitat). I F.* The Planning Sub-Areas = City of Yelm and UGA Land Needs Assessment The community is divided into four sub-areas to permit the identification of logical service areas and the development and monitoring of the goals and policies of this ~ Comprehensive Plan. See maps 7, 8, 9, and 10. The subareas also provide a reasonable basis for the urban growth area lands needs assessment which is set forth in #-~e-tables 1 and 2~elev~. ~ ~-~598 I ~ ~z ~.t ~ ~ ~ ~ , ~-a-a--a6~FES 4 - , ~ ~ - ~ > > - • ~ • ~ . . . ~ , . 4 ~ ~ III - 5 Table 2' ~ Analvsis of Land Suaplv vs. Demand, 2000-2025 Yelm and Yelm Urban Growth Area (UGAI . . . . ~ i ~ ~ ~ ~ Residential 3144 1,365 1594 57% 49% Commercial 400 185 54% Industrial 251 22 91 % Source: Buildable Lands Renort for Thurston Countv TRPC. 2002. Reaional Benchmarks, Julv 2003; based on Forecast of Land Demand Poou/aGOn antl Emnlovment Fo2cast fOr ihe Thurston Countv, 1999. TRPC. 'The table reflects current zoninq however the suqqlv column for Residential Uses includesthe 1 250 acre oroposal for the Thurston Hiqhlands Master Planned Communitv. Some of this land will be residential some commercial some institutional and a larqe amount of ocen soace When the Master Plan review orocess is complete the amount of residential acreaae and the estimated percentaae of residential land remaininq can be recalculated. I ~t6F~6 ~ ~4 ~ -d54-8 ~ -~a I -55~-~ ~ ( ° . .r- I a-`~C4~ o , ~ ° -~4~9 ~ ~9 ~ ~ ~ -~55:6 I ° -'~~.-"t ~ , , , ~:8 I I r+~s-e~~va~ - o 0 ~ 0 o ~ ~ - 7 IV. HOUSING A.* Introduction This housing element addresses the housing needs of the City of Yelm and its UGA. The goal of the City of Yelm is to establish a baseline for evaluating the growth of the community and to assure that adequate facilities are available to serve the needs of the y,- - I communit 81 The housing element considers population and income characteristics; housing characteristics, including the condition of the existing housing stock; housing problems; and strategies. It then sets forth the goals and policies that will be used to encourage the provision of affordable housing in the City of Yelm. The capacity utilities and planned densities within the UGA provide ample opportunity to meet housing needs above the median incomes levels. 1. Growth Management Act Requirements The Growth Management Act requires Yelm to meet the relevant planning goals in the Act. The relevant goal for housing elements is Goal 4: ~ "Housing. Encourage the availability of affordable housing to all economic segments of the population of this State; promote a variety of residential densities and housing types; and encourage preservation of existing housing stock." This housing element contains a number of goals and policies designed to encourage the availability of affordable housing, promote variety in housing, and errcourage the preservation of existing housing. 9~ „ , „ „ , „ Population estimates for the Yelm UGA3 were obtained from the TRPC and , . , the ~999 2000 censu In many of the tables, data is shown for both Yelm and either Thurston County overall or unincorporated Thurston County. This information is provided only for purposes of comparing the Yelm data with other local data. IV - 1 affordable housing and the general pattern of population increase for ~ Thurston County. Southern Pierce County, directly across the Nisqually River, is also growing rapidly and Yelm is seeing spiltover growth from Pierce County. ~ ~ie?~ €-~e~-~s ~939 ~4 - ~949 ~ ~A 4~A ~4-3 -a-969 479 a--~ ~8 ~ ~1-a- ~9~9 ~-94 -~-8~~ -~998 ~-3 a-99-'~ ~ ~ „ , Table 1 Historic Population Chanqe for City of Yelm Year Population Averaqe Annual 1930 384 1940 378 -0.2% 1950 470 2.2% 1960 479 0.2% 1970 628 2.7% 1980 1,294 7.5% 1990 1,337 0.3% 2000 3,289 9.4% 2005 4,455 7.0% Source: 1930 to 2000 - U.S. Bureau of the Census. 2005 Washinqton State Office of Financial Manapement TRPC Small Area Poaulation Estimates: The Profile. Note: Includes qrowth bv annexation. ~ IV-3 b. Household Characteristics ~ The table below shows the types and sizes of households within the City. It is anticipated that the average household size will continue to drop due to lower birth rates, increased longevity of elderly persons, and a trend toward later marriage. It should eventually drop close to the rates for the larger metropolitan area (Olympia, Lacey, and Tumwater}. Since more housing is needed in general to support anticipated growth, the amount of actual housing will be even greater, since fewer people will live in each dwelling unit. c. Special Needs Population The goal of the community is to provide an opportunity to meet special needs population requirements within the incorporated growth area. Yelm's principal special needs population is the low income elderly. As the City grows the variety of special needs will increase. It is the policy of the City and Thurston County to provide, in all housing designations, provisions for housing for special populations, including group homes. The City will adopt standards and criteria which assure within the community, facilities which provide access, affordability, and choice, and which promote and protect residential neighborhood needs for quiet enjoyment and safety. The Housinq Authoritv of Thurston Countv and other public and private social service qroups, serve special needs households. Not surprisingv the need here also far exceeds the Countv, State and Federal abilitv to provide services or assistance. Table 4 Households Served and on Waitinq List for the Thurston Countv Housinq Authoritv % Countv Households Served and on Wait List in County Ci of Yelm Yelm Total ~ 2006 Households Currentlv Served 69 3.4% 2,003 ~ 2006 Households on Waitinq List 194 5% 3,820 ~ Source: Thurston Countv Housinq Authoritv IV - 5 The household income ranges in dollars for Yelm and unincorporated Thurston County {-~9~8~ 1( 999) and the number of households within each range are shown in ~-ig~-~Table 6 below. For purposes of this housing element, the federal poverty categories for income are used. These categories vary by community, depending on the median income within the particular community. This often requires converting census data into data that can be used within the federal poverty categories, and may mean the numbers are estimated. For I Thurston County, the median income in 1999 was $~9;9~~ 46 975 The federal poverty categories and income for Thurston County, in ~9~9-1999 dollars, are: Extremely low income households - making less than 30% of I county median income ($0 -$9;-~35 14 093) Very low income households - making between 30% and 50% of I county median income ( , , $14,094-$23,488) Low income households - making between 51 % and 80% of county I median income ( , , $23,489-$37,580) Moderate income households - making between 81 % and 95% of I county median income (,$~4,?~3' Q~~$24,782-$44,626) ~I~~-Se~ ~ ~e~ ~ #~+~e~ ~ess- , ~4 ~-4 ~-;4-~~ 4-8 , , ~9 ~ 4,~~ ~ , , 6~ ~-4-~ ~a-~A ~ , , 88 ~ -a-~~4 a-9-~ , , ~9 a~-3 a-~1-A6 -a-~:S , , ~9 ~-~4 a-~A6 ~ , ~9 ~ a-3;-7-'~-~ ~1- , Table 6 Household Income for Citv of Yelm and Thurston Countv (total) 2000 I Income in 1999 Yelm Thurston Countv I Number Percent Number Percent I Households 1,206 100.0 81,666 100.0 I Less than $10,000 122 10.1 5,422 6_6 I$10,000 -$14,999 100 8_3 4,251 5_2 ~ I$15,000 -$24,999 147 12.2 9,099 11.1 IV-7 Table 7 ~ Households Spendinq as a Percent of Income on Housinq (Owner-Occupied) Selected Monthlv Owner Costs Yelm Thurston Countv as a Percentaqe of Household Number Percent Number Percent Income in 1999 I Less than 15.0 percent 103 17.9 12,218 29.3 I 15.0 to 19.9 percent 89 15.5 7.424 17.8 I 20.0 to 24.9 percent 82 14.3 6,873 16.5 I 25.0 to 29.9 percent 104 18.1 5,125 12.3 I 30.0 to 34.9 percent 63 11.0 3,186 7_7 I 35.0 percent or more 133 23.2 6,615 15.9 I Not computed _ _ 190 .5 Source: Census 2000. Table 8 Households Spending as a Percent of Income on Housinq (Renter-Occupied) Gross Rent as a Percentaqe of Yelm Thurston Countv Household Income in 1999 Number Percent Number Percent I Less than 15.0 percent 105 21.9 4,009 14.8 I 15.0 to 19.9 percent 62 12.9 4,074 15.1 I 20.0 to 24.9 percent 71 14.8 3,999 14.8 I 25.0 to 29.9 percent 45 9_4 2,941 10.9 I 30.0 to 34.9 percent 24 5_0 2,504 9_3 I 35.0 percent or more 159 33.2 8,385 31.0 I Not computed 13 2.7 1,108 4_1 I Source: Census 2000. vTGTT * o ~uuni neirnTni *uuni nerTnTni ~$°~e 4~~ _ ~a , _ ~:5-°,~e z~---~4 a-~1-9~ = 9-4°,~e = ~-9-°,~ , ~-~--~-9~ _ ~~-A% _ ~-°~e , ~8---34-°,~ ~-9~~ _ , _ ~-4 °~e ~3~ ~4~5~ _ , _ ~9~°/$ ~ IV-9 ~ TABLE 9 CITY OF YELM AND THURSTON COUNTY ESTIMATE OF AFFORDABLE HOUSING STOCKS AND HOUSEHOLDS BY INCOME CATEGORY, 2000 . ~ . • - . . . . ~ . • . Yelm 0-30% of Median 102 40 142 204 >30 to 50% of Median 130 20 150 145 >50 to 80% of Median 220 196 416 217 >80 to 95% of Median 37 146 183 112 Remainder 14 374 388 528 . ~ Thurston County Total 0-30% of Median 1,777 3.004 4.781 8.901 >30 to 50% of Median 8.685 1.735 10,420 8.334 >50 to 80% of Median 13,659 6,761 20,420 14,408 >80 to 95% of Median 2,049 6.847 8.896 6,898 Remainder 1,760 36.842 38.602 43.124 ~ . ~ Note: This table is not intended to show a one-to-one relationship between the number of households within an income ran e and the number of units available within that same income ranQe• In realitv, a lar2e number of units in the mid-talower ranaes are rented or owned ~ those who are spending less than 30% of their income for these units. These households "buv-down" and effectivelv lower their housine costs while at the same time reducine the inventorv available for those with no other ontions. Explanation Rentals: Gross Rent _ SF3 H62 Universe: Specified renter-occupied housin~ units: Rent Asked - SF3 H59 Universe: Specified vacant-for-rent housing units. Owner: Value for all Owner-Occupied Housine Units SF3 H84 Universe: Owner-Occunied Housin Units: Price Asked _ SF3 H87 Universe: Specified vacant-for-sale-onlv housine units. Households: Household Income in 1999 - SF3 P52 Universe: Households. Source: 2000 Census, TRPC 3. Data on Housing a. Authorized Housing Units ~~Table 10~ below shows the total authorized housing units as of 2000 and estimated for 2005 , .~~~e-in~'~ ~°~g ~e#~}e~-sTa~ed-The data show y ti~~~~ ^~r^o„+~^o ^f that single-family homes in Yelm and in the county make up 75% of the housinq stock (78% if manufactured homes are included). ~ IV - 11 ~ Table 10 Total Small Area Dwellin~ Unit Estimates bv Tvue Yelm and Yelm UGAs, Thurston County Total 2000 and 2005 . . . . . • . Yelm C~ 865 330 130 1,160 475 135 UGA 270 15 140 295 15 150 Total 1,140 340 270 1.450 485 285 . . . . • ~ .i i•i ~ Sources: Thurston Reeional Plannin~ Council; Bucoda. Lacev. Olvmpia, Rainier. Tenino, Tumwater Yelm and Thurston Countv building deqartments: U.S. Bureau of the Census; Washington State Office of Financial Mana¢ement TABLE 11 CITY OF YELM AND THURSTON COUNTY TRENDS IN HOUSING COSTS. INCOME AND HOUSING TENURE. 1990 TO 2000 . . Selected Owner Occupied Home Values and Renter Occuaied Gross Rent 1990 Median Value 79.700 56.400 ~ 2000 Median Value 145.200 117,400 Percent Increase 82% 1~8% 1990 Median Gross Rent 460 379 2000 Median Gross Rent 655 625 Percent Increase 42% 65% Income Median Household Income in 1989 30,976 19.053 Median Household Income in 1999 46.975 39,453 Percent Increase 52% ~p7~~a Tenure 1990 Owner Occu~ied 40.226 277 1990 Renter Occuoied 21.924 190 1990 Percent Owner Occupied 65% 59% 1990 Percent Renter Occuoied 35% 41 % 2000 Owner Occuoied 54,364 736 2000 Renter Occu~ied 27,261 479 2000 Percent Owner Occuoied g7% g~o~a 2000 Percent Renter Occuoied 33% 39% Sources: 1990 Census and 2000 Census SF1 and SF3 files. ~ I Note: Housin4 costs have increased since 1999. Averaae sales orice between March and Mav 2006 was aoaroximatelv $232.000~ rents ranaed from $495 to $1475 Source• Multiole Listina Service IV - 13 C. Goals and Policies ~ I Housing Goals and Policies within the UGA GOAL 1:* Encourage a variety of housing types and densities and a range of affordable housing. Policy 1-1:* Monitor the need for special needs housing and work toward increasing opportunities for such housing. Policy 1-2: Review the zoning ordinance to ensure that a range of housing is available throughout the City. Policy 1-3:* Encourage opportunities for a range of housing costs to enable housing for all segments of the population. Policy 1-4:* Encourage the provision of adequate affordable building sites through appropriate zoning, infrastructure, and the overall regulatory climate. Policy 1-5:* Permit a variety of housing types within the residential and mixed use designations to promote the range of alternatives within the community, including but not limited to government assisted housing, housing for low-income families, manufactured housing, multi-family housing, group and foster homes. GOAL 2: Encourage housing with a pedestrian orientation in order to promote a sense of community and safety. Policy 2-1: Review the zoning ordinance and development standards to ensure residents can safely walk to points throughout the City. GOAL 3:* Meet County-wide planning policy requirements to ensure a fair share of affordable housing. Policy 3-1:* Yelm and Thurston County shall encourage a variety of housing types in the residential designations to assure choice, opportunity, and availability of a fair share of affordable housing throughout the community. Policy 3-2:* Yelm and Thurston County should participate with other jurisdictions within the County in a regional process to monitor achieving the Fair Share Affordable Housing targets throughout the County. GOAL 4:* Encourage housing that meets adequate safety standards. ~ IV - 15 ~ Table 13 Estimated Housing Need for Low and Moderate Income Housinq bv Income ~ Categorv and Forecast Period for Yelm and Yelm UGA~ fAll fiqures Sublect to Roundinql Year Need ex low Need very low Need low Need moderate TOTAL 91-92 22 17 18 6 63 93-95 18 14 15 5 52 96-2000 24 16 17 5 62 2001-05 16 12 13 4 45 2006-10 19 15 16 5 55 2011-15 22 17 17 6 62 TOTAL: 339 2. Population Estimates for Yelm and Yelm UGA These figures are ~al<<en ~~e~ a~eme °Do, „ , ~°~ge+x~e~~." ~the target population +s-for the "Medium Growth---~t~ n°~" scenario as agreed to bv all iurisdictions within Thurston Countv in 2006. i~a~~er~e- Initial population (~95~2000): 4,385 Target population (2030~5): 11,480999 The estimated need proiected in 1993 is approximately ~12% of the total new housing stock anticipated in the Yelm growth area over the next 25 vears. Table 13 above outlines the fair share proiections for Yelm and its UGA bv income level. The table could be updated if a reqional committee replicated the work completed in 1993. It is important to note, that this information does not mean that people in these income levels are not currentlv housed. Nor does it mean that this manv people in the future will be without housinq. It does mean that manv are and will be payinq far more than 30 percent of their income for housinq. This leaves them even less monev for transportation, medical care, clothinq, insurance, etc. And this further reduces the qualitv of their lives. 3. Strategies for Housing to Meet Year 2026 and 2030 Need Provide Infrastructure to Support Housinq Needs The land use plan accommodates a variety of housing types to promote choice and opportunity in housing. In neighborhoods a variety of housing types and densities are encouraged to enable adequate sewer and water facilities at IV - 17 ,,r,,, XII. ENVIRONMENT Introduction The Environmental Chapter focuses on the City of Yelm's commitment to protect and enhance the quality of the natural and built environments. As increased residential and commercial development intensifies in Yelm, the protection of the natural environment becomes more of a challenge. The intent of this chapter, and the goals and policies it contains, is to guide the formation of regulations and future actions that will protect and enhance the natural environment. Growth Management Act and County-Wide Planning Policies The Environmental Chapter is intended to meet the objectives of the State Growth Management Act (GMA), Endangered Species Act (ESA), State Environmental Policy Act (SEPA), County-Wide Planning Policies and other federal and state policies and regulations. The GMA contains specific requirements for the designation and protection of "critical areas," defined by the GMA as wetlands, areas with recharging effect on aquifers used for potable water, fish and wildlife habitat conservation areas, frequently flooded areas, and geologically hazardous areas. In addition, the GMA requires the adoption of development regulations that protect critical areas (RCW 36.70A.060) and the inclusion of the best available science in developing policies and development regulations to protect the functions and values of critical areas (RCW 36.70A.172). Development of this chapter is based on the same premise adopted in the Thurston County County-Wide Planning Policies, Chapter IX, Environmental Quality. e'~°n-, Arc~ ic Inn~~ciJ in Cvhihi? Natural Environment Goals and Policies The City of Yelm recognizes that the natural environment is important for the following reasons: ? It provides habitat for wildlife and plant life; ? It creates a positive visual image and open space; ? It provides opportunities for recreation; ? It is part of the City's surface water management system and water supply; and ? It is cost effective public policy. ~ XII-1 Specific policies or programs shall be used to accomplish the necessary protection. ~ Aquifer Recharge Areas (Groundwater) The aquifer recharge area in Yelm covers the entire City. These areas are characterized by highly pervious glacial soils which drain rapidly into the underlying water table. These areas are classified primarily as Category 1, extremely sensitive with small pockets of Category 2, highly sensitive in the southwestern portion of the city. Typical activities associated with land development, such as clearing and grading and stormwater management, affect the natural hydrologic cycle. All of these activities decrease the land's ability to absorb and retain water and increases the possibility of contamination. Goals EG 3 Protect the quality, and manage the quantity of groundwater for all uses in the present and the future. EG 4 Encourage measures that improve surface water management. Policies EP 4 Where feasible, development within the urban area should be on sewers with a reuse/recycling discharge to reduce the potential for contamination of the aquifer and the abutting surface streams. EP 5 Stormwater policies should require treatment of stormwater on site using swales, ponds, and other detention and conveyance facilities, together with, or in combination with, biofiltration prior to discharge to either groundwater or surface water to minimize or eliminate contaminants from the stormwater. EP 6 Implementation of the policies and programs of the sewer and water comprehensive plans. EP 7 The City of Yelm shall seek to prevent groundwater contamination by protecting the entire resource as effectively as possible, but within the limits of what is acceptable and affordable to the community. EP 8 The City of Yelm shall strive to assure that preventive actions are taken to protect water quality from further degradation and that the City, in cooperation with the Department of Ecology, will promote corrective actions in areas where degradation has occurred so that the net effect is a gradual improvement of the ground and surface water quality. ~ XII-3 Goals ~ EG 6 Achieve no net loss of wetlands and increase the quality of Yelm's wetland resources through the application of best available science. EG 7 Protect, restore, and enhance the City's streams. Policies EP 12 Construction sites shall be required to demonstrate construction period stormwater protection to prevent turbidity and siltation for affecting surface waters in the area. EP 13 Wetlands, streams, and their associated buffers shall not be used for construction purposes, except where necessary for stormwater control and utility and transportation connections. Where such control or connections are permitted, regulations must identify steps to assure no degradation to ground or surface water. ~ EP 14 Update and utilize Yelm's wetland protection '°^~°~-requlations to ensure protection of Yelm's wetland resources through use of techniques considered to be best available science in accordance with adopted laws. CD ~G I 14' f Cnryinoerc~~ ni~inn ~f ~~~oy~,, r~i-! .+nr1 ~+I ~ ~rTd~r~ . . ~ ~r ~n-rc~~rnavrrvr-~rcttA ~ ~ r~°c-a2#FF~~~161-1 A# n~~T~f~c-«~T~S; ~••h ~••,,,~cf-~2~S~cr°carr''''T 6AF~A1'~: €~~o~~~~~o I I C C' L, nrl_1~,'~,Irllifo ~`n nc rlcf~' " ~I^~~~ fnr i c^v .~r~• i-F C~ncT vmc^ ~~vc-acr r"rvr e ~ • EP 15~ Wetlands, rivers, streams, ponds, and lakes should be viewed as systems and not as isolated units. ~ EP 16~ The valuable natural functions of wetlands and stream corridors, such as habitat and water quality, should be protected by maintaining an undisturbed or restored native vegetated buffer and by prohibiting filling, draining, and clearing within wetlands and adjacent fish bearing streams and their buffers. Physical alterations should be minimized except where restoring the natural functions. ~ EP 179 The City may regulate private development and public actions to protect water quality and to ensure adequate in-stream flow to protect fisheries, wildlife habitat, and recreation resources. ~ EP 18~9 Retain existing open surFace water systems in a natural state and rehabilitate degraded conditions. XII-5 Policies ~ EP 246 The City adopts the FEMA flood hazard maps for reference purposes and any development in a flood plain must be consistent with FEMA guidelines, and such additional regulations as adopted by the City. Filling floodplains is discouraged unless necessary to meet a public purpose. No development should be allowed in any floodway. ~ EP 2~5 Regulations of these lands should promote efficient use of the land and water resources by allocating frequently flooded areas to the uses for which they are best suited, and to discourage obstructions to flood-flows or uses which pollute or deteriorate natural waters and water courses. ( EP 26~ Life and property should be protected from flood hazards, and the flood storage and transmission capacity of rivers and streams should be retained. ~ EP 279 Protect natural flood storage and conveyance through the development and implementation of plans and regulations that reduce flood impacts. Geologic and Volcanic Hazard Zones Yelm has a few areas identified as steep slopes and volcanic hazards, which occur along portions of the Centralia Power Canal and Yelm Creek (see Critical Areas Map I#56). The City will need to develop guidelines for specific geologic issues. Goal EG 9 To designate and regulate development on lands having identified geologic hazards to protect the health and safety of persons and property, and to avoid other adverse impacts of erosion, landslide, and other geologic hazards. Policies ~ EP 2839 Develop implementing legislation, based upon best available science, with specific requirements for analysis of geologically sensitive areas and application of specific development standards to prevent erosion and landslide hazard. ~ EP 29~ The City will continue to gather and review seismic hazard data for the area to better assess specific seismic hazard areas (those areas more sensitive than others because of geological parameters). The City will consider development of additional requirements associated with Uniform Building Code review for buildings in Yelm's most sensitive earthquake hazard areas. XII-7 Air Quality ~ Air quality is an increasing problem in the Pacific Northwest. Numerous federal, state, and regional agencies enact and enforce legislation to protect air quality. Locally air pollution sources are from: motor vehicles, indoor and outdoor burning, industrial operations, and land clearing and grading. Goal EG 12 Protect air quality. Policies ~ EP 33a Support state and federal air quality standards and the regulation of activities that emit air pollutants. ~ EP 346 Encourage transportation demand management and commute trip reduction in order to reduce energy consumption and air pollution. Noise Noise pollution can be harmful to the general public's health and welfare. Noise is primarily generated by: industrial uses, vehicle traffic, and construction activities. ~ Goal EG 13 Control the level of noise pollution in a manner that promotes the use, value, and enjoyment of property in an urban environment. Policy ~ EP 35~ Use state standards to ensure that excessive noise does not impair the permitted land use activities in residential, commercial, and industrial land use districts. ~ XII-9 ten years. Any change to the long-term boundary must be consistent with the County- Wide Planning Policies. F. Growth Management Definitions and Concepts ~ 1. Conformance - The degree to which all plans within the UGA , including plans of other municipal corporations or state agencies comply with and/or promote the goals and policies of this Comprehensive Plan. Where inconsistent goals cannot be met by a single plan, consistency shall be measured by the degree to which the overall goals and objectives are met by the proposed action. 2. Consistency - The degree to which a project or development accomplishes the goals and objectives of this Comprehensive Plan. Some goals are mutually exclusive or incompatible as applied to a specific project. In the event of conflict, consistency is measured by the degree to which the overall goals and objectives of the Plan are met by the project. 3. Concurrency - The availability of adequate facilities to meet the public needs ~ imposed on the UGA by any proposal requiring a permit or approval by the City or County. All projects shall be reviewed to determine that parks, schools, fire, sewer, water, and transportation will be available or are to be planned and funded within six years of the date of the project approval. Development regulations shall identify levels of service and the plans of implementing the concurrency requirement. ~ XIV-2 MEMORANDUM TO: Thurston Reqional Planninq Council FROM: Veena Tabbutt, Senior Planner DATE: June 30, 2005 SUBJECT: Population Forecast Small Area Allocations PURPOSE Approve Population Forecast Small Area Allocations. Summarv: • Staff has prepared new Population Forecast Small Area Allocations • These allocations are based on the Reqional Population and Employment Forecast approved bv the Council in November 2004. • The allocations have been reviewed by the Forecast Advisorv Committee, which consists of staff members for all iurisdictions in Thurston Countv, members from various qlanning commissions, representatives from the Transportation Advisory Board and Technical Advisory Committee, and representatives from local orqanizations includina the commercial and residential buildinq communitv, and the environmental communitv. • These allocations will be used for transportation, sewer, water, land use, school, and other local qovernment planninq purposes. • The final phase in the Forecast Allocations will be the Emplovment Forecast Small Area Allocations ~ .M-~ B-2 Table 1: ~ Comparison of new TRPC Population Forecast Small Area Allocations with the previous allocation . • . ~ ~ ~ ~ ~ ~ ~ ~ Lacey & UGA New 64,600 73,900 82,900 92,200 99,900 106,700 OJd 67, 900 75, 500 83, 000 89, 600 94, 600 N/A fll~+m~ai~ ~~ICA ' Netn~ 54,50t~ ~0,90{3 S?,(~£~ 72,9(~C1, ~;90~ 82,2Q~1 ; , ~J1d v6,~?;'',, 6'~,~!? 6T,50'D . 73,fi~ff1', ~...:.~,~;`it~4 : NIA Tumwater&UGA New 21,600 24,400 27,100 32,200 37,100 41,600 Old 23, 000 24, 500 28, 500 32, 800 38,100 N/A _ k~50 B~,~da & ~?~A ~3l~ 62C? ~ ; 63fl £~$~Q; 7~~ ~ ~~Q 8t~t} ~ ,vi ~ ' Rainier & UGA New 1,530 1,760 1,990 2,260 2,510 2,740 Old 1, 785 9, 970 2, 095 2, 205 2, 315 N/A Teriini~ & U~~R N~~i !~,90{~ : ;,,2;t13Q 2,47fl 2;B9t~,~ . 3;2#~t~ . ~ `3,58~° : ~ ,.3.3', 3 : ' fl!d , ;1, 63~3 . . . &~iJ' ' 1, G7U i~?4~i 99~ lUl,4" ` ' Yelm & UGA New 5,490 6,590 7,690 9,100 10,330 11,480 Old 5, 625 6, 825 8, 325 9, 875 19, 375 N/A Ciartt~ NJbt~~nd ~1GA N~w ;~33U 8~t~ ~70 920 97d 1,C3Q0 ~ ; ~ , ~ ~ ~ , f~ld ; ?r.,325 ; 1152~'. ~~~~:I ~,~775 ~VIA . : _ Chehalis Reservation New 30 60 80 110 140 170 O!d N/A N/A N/A N/A N/A N/R Nisqualfy Reserv~tit~r~ ~lew ~58A~~~~ ~30 ~ ~7~iJ , ~~~7'~}D ~ ~,B7C? ~ ~ 9~t~ E:~ FOId N/A N!A NlA ~ IUl:4 , N,~}~ ;1VIA. Rural New 72,400 83,300 93,500 104,900 114,300 121,800 Old 78, 400 85, 400 91, 900 98, 500 104, 000 N/A . . . - ~~i • : • . . ~ ~ ~i ~i ~ 'Note - added for the Yelm 2006 Comprehensive Plan amendment process. TRPC traditionally updates population and emplovment forecasts everv 3-5 vears, and released the most recent small area (citv and rural) populations forecasts in Julv of 2005. The latest release was prior to the proposal of the Thurston Hiqhlands master planned communitv in Yelm, which mav include 5,000 to 6,000 new dwelling units. The buildout of this development mav exceed the time range of the 2030 forecast. TRPC will continue to monitor residential and commercial development activitv and anv proposed chanqes in Thurston Countv's rural zoninq or the size of the Urban Growth Areas, and anticipates updatinq the small area (citv and rural) populations forecasts in 2007. B-4 ;,:;s~~,~'J ~ I ~ Bucoda & UGA 2030 Rate of Trends: Po ulafion: Growth: 800 1.0% Bucoda is likelv to see onlv a modest amount of qrowth. Growth shares mav beqin to increase in the latter vears of the forecast if sewer service becomes available. ~ Rainier & UGA I 2030 Rafe of Trends: Po ulation: Growth: 2,740 2.4% Historicallv, Rainier has experienced moderate qrowth, more than Bucoda and Tenino. It is likelv that the qrowth share in Rainier will remain relativelv constant until sewer service becomes available to the cit and UGA. ~ Tenino & UGA I 2030 Rafe of Trends: Po ulatron: Growfh: 3,580 2.6% Historically, Tenino has experienced verv little qrowth. It is likely that the qrowth share in Tenino will increase when sewer service becomes available to the cit and UGA. ~ Yelm & UGA I 2030 Rate of Trends: Po ulafion: Growth: ~ 11,480 3.0% Historicallv. Yelm has been one of the fastest qrowinq communities in Thurston Countv. It is likelv that this trend will continue with growth in commutinq, increased accessibilitv to Yelm, and a larqe supplv of land for residential rowth. ~ Grand Mound UGA I 2030 Rate of Trends: Po ulation: Growth: I 1,000 0.7% Grand Mound is not likelv to see much residential growth. The area is mainl desi nated for commercial and industrial uses. ~ Confederafed Tribes of the Chehalis Reservation (Thursfon Countv uortion onlv) I 2030 Rate of Trends: Po ulation: Growth: 170 7.2% The reservation bisects two counties with most of the population residing in the Grav's Harbor Countv portion. The Tribe expects to see residential arowth in the Thurston Countv portion. This will likelv occur as utilities are available. ~ B-6 i ~ Tumwafer 8 UGA Old New Notes Forecasf Forecast 2025 2025 I 38,100 37,100 The forecasts are quite similar. ~ Bucoda & UGA Old New Nofes Forecast Forecasf 2025 2025 I 640 760 Bucoda now has an UGA so the new forecast includes a larqer phvsical area. ~ Rainier & UGA Old New Notes Forecast Forecast 2025 2025 I 2,315 2,510 Rainier mav see sliqhtly hiqher qrowth with the addition of a sewer s stem. ~ Tenino & UGA Old New Notes Forecast Forecast 2025 2025 ~ I 1,945 3,280 Tenino will likelv experience hiqher qrowth with the addition of a sewer s stem. The new forecast is more consistent with the 1996 forecast. ~ Yelm & UGA Old New Notes Forecast Forecast 2025 2025 11,375 10,330 Yelm will likelv still experience raqid qrowth, at a sliqhtly lower rate than was forecast previously. The qrowth rate in Yelm has abated somewhat after the initial pent up demand for qrowth was met after the sewer was ut into lace. ~ Grand Mound UGA Old New Notes Forecast Forecast 2025 2025 2.075 970 2000 population estimates for the Grand Mound UGA were revised, leadinq to a lower forecast. There does not appear to be much capacitv for residential growth in the UGA, but there is quite a lot of rowth oin into the Rochester rural sub-area. ~ B-8 EXHIBIT G ~ Consolidated List of Policies Applicable to the Unincorporated Yelm Urban Growth Area Note: Exhibit G is not repuired and is no lonqer deemed necessarv as qart of the plan. It is recommended that it be deleted in full. Refer to Chapter I, Paqe 1, A. Intent - which notes that "The Yelm Comprehensive Plan represents.... this plan also serves as the Joint Plan between Yelm and Thurston Countv for Yelm's Urban Growth Area." ~ B. Content - clarifv which sections are applicable to the UGA area as well as the Citv of Yelm. Yelm/ypc and tcpc public hearing info\9-26 Yelm Comp Plan and TC Joint Plan Application , G-1 ~ i ~ Confederated Tribes of the Chehalis Reservation Old New Notes Forecast Forecast 2025 2025 ~ NA NA TRPC did not rovide a forecast for the Tribes in 1998/99. ( Nis uall Reservafion Old New Notes Forecast Forecast 2025 2025 ~ NA NA TRPC did not rovide a forecast for the Tribes in 1998/99. ~ Rura! Count Old New Notes Forecast Forecast 2025 2025 104,000 114.300 Caqacitv in the rural countv mav have been understated in the 1998/99 forecast as the undersized but leqal lots were not included in the invento . ~ B-9 i ~ Nis uall Reservation Thurston Count ortion onl I 2030 Rate of Trends: Po ulafion: Growth: 940 2.0% The Tribe anticipates a need for 100 homes. The forecast assumes this need will be met bv around 2015, after which the rate of qrowth will continue to the end of the forecast eriod. ~ Rural counf 2030 Rate of Trends: Po ulation: Growth: 122,000 2.1 % Overall it is likelv that there will be a shift in qrowth shares from the rural countv to the urban areas, so that the split between urban and rural will be around 70 percent urban qrowth and 30 percent rural qrowth bv the end of the forecast period. This is mainlv due to an increasinq demand for multifamilv housinq, which predominatelv locates in urban areas. Usinq the buildout factor, the north countv rural areas have less available land than those to the south, so it is anticipated that there will be a steadv shift of rural ~rowth to the south countv until the available land supplv is fairlv even between the two areas. Rural areas will beqin to feel full (the buildout factor will be apqroached) bv 2015, with the exception of the south-central regions of the countv where some land will remain available. Overall the buildout factors in the rural countv do not indicate a shift in qrowth shares of single- familv homes to the urban areas. The rural countv will continue to receive the ma'orit of new manufactured homes. How does the New Forecast (2004-2005) compare to the Previous Forecast (1998- 19gg)? ~ Lacev & UGA Old New Notes Forecast Forecast 2025 2025 94,600 99,900 With the qrowth in commuters to Pierce Countv, Lacev is expected to experience raqid qrowth. In addition, residential densities in Lacev tend to be hiqher than comparable zoninq districts in Tumwater and Olympia, therefore the caqacities are sliqhtlv hiqher than modeled in the revFOUS forecast. ~ Olvmpia & UGA Old New Notes Forecast Forecast 2025 2025 ~ 79 100 77 900 The forecasts are uite similar. ~ ~ B-7 I SUMMARY OF THE NEW ALLOCATIONS ~ ~ Lacev & UGA I 2030 Rate of Trends: Po ulafion: Growth: 106,700 2.0% Within Lacev, initiallv some qrowth is likelv to shift to what are now the unincorporated urban arowth areas (UGAs) as the citv becomes developed. Then, as available land supplv decreases, Lacev will continue to qrow, but it will likelv see a decline in share of countv-wide qrowth. Usinq the buildouti~factor, the shift in qrowth is likelv to occur bv 2015. Toward the end of the forecast period the qrowth share in all urban areas, includinq Lacev, is likelv to increase as the demand for multifamilv homes increases. This mav result in redevelopment in the older nei hborhoods and mixed-use districts. ~ Olympia 8 UGA I 2030 Rate of Trends: Po ulation: Growth: 82,200 1.7% Trends in Olvmpia are verv similar to Lacev. Within Olvmpia initialfv some qrowth is likelv to shift to the unincorporated UGAs as the citv becomes developed. Then, as available land supplv decreases. Olvmpia will also see a decline in share of countv-wide qrowth. Usinq the buildout factor, the shift in qrowth is likelv to occur bv 2015. Toward the end of the forecast period the qrowth share in all urban areas is likelv to increase as the demand for multifamilv homes increases. This mav cause redevelopment in the older neiqhborhoods and mixed-use districts. ~ Tumwater & UGA I 2030 Rafe of Trends: Po ulation: Growth: 41,600 2.7% Tumwater is likelv to be the recipient of increased qrowth shares as the supply of available fand is reduced in Lacev and Olvmpia. This shift in growth will likelv beqin to occur around 2015, and continue to the end of the forecast period. Most of the increased qrowth share will be located in what are now the unincor orated urban rowth areas. ~ " A buildout factor of 25 percent is applied as an indicator of when to shift qrowth shares. This factor is calculated bv dividinq demand bv supplv It makes the assumption that in anv qiven forecast interval (5 vears) onlv 25 percent of the total capacitv will be available for sale and development. As the total inventorv of land or capacitv decreases and prices rise harder to develop lots partiallv developed lots and redevelopment oqportunities will be available. The buildout factor will be calibrated for housinq tvpe (bv zoninq district) at the beqinninq of each forecast qeriod so as to not artificiallv create a scarcitv of capacitv in one tvpe of dwellinq unit and a surplus in another. B-5 BACKGROUND ~ TRPC develoqs updated population and emplovment forecasts everv three to five years. These forecasts are used for transportation, sewer, water, land use, school, and other local povernmental planninq purposes. TheV are also used bV the private sector for business planninq. TRPC has been preparinq these forecasts periodicallv since the late 1960s. We are in the midst of another update. On November 5th the Thurston Regional Planninq Council adopted the Countv-Wide Population and Emplovment Forecast. Given the forecast of future population countv-wide, it must be decided where the growth will qo based on the adopted plans and policies of the local cities, towns, and the countv. Countv-wide fiqures are allocated to the planninq area level usinq a larqe database of developable lands, development trends, and zoninq densities. Onlv then can_planninq for streets, utilities, school sites, park sites, and other public services and facilities take place. ISSUES A kev assumption in the Population Forecast Small Area Allocations is that there will be no maior chanqe in land use policy for the Thurston Countv or the cities and towns within Thurston Countv, the Confederated Tribes of the Chehalis Reservation or the Nisgually Indian Tribe over the period of the forecast. Policies that are assumed to remain constant are found in the comprehensive plans and related documents from the fall of 2004, and include (but are not limited to): ~ • Zoninq districts and zoninq density calculations fdeductions and density ran es • Critical Areas Ordinances • Size and location of urban growth boundaries (annexations are an assumption of the model) • Adopted sewer and water plans In 2005 the nopulation forecast small area allocations could be considered BASELINE allocations if there are maior chan~es in any of the policies outlined above. The BASELINE allocations can then be used to evaluate the effects of anv major chan es in policy that have occurred in 2005, or may occur in the future. REQUESTED ACTION: After reviewinq the attachments, approve Population Forecast Small Area Allocations as BASELINE allocations. 70:Ib Attachments B-3 EXHIBIT B* ~ Population Projections Note: Existinq Exhibit B will be deleted and replaced with a new Exhibit B that reflects the currentlv adopted population projections. These projections are updated every 3- 5 vears. ~ B-1 XIV. MISCELLANEOUS PROVISIONS ~ A.* Property Rights ~ The right of citizens of the UGA to be secure in their property is a fundamental policy of this Comprehensive Plan. The need of the community to provide adequate public service and to protect the peace and quiet enjoyment of private property is a fundamental policy of this Comprehensive Plan. Private property shall not be taken for public purpose without due process and just compensation where required. B.* Permits The policy of the City of Yelm and Thurston County is to process permits in a timely and efficient manner in order to foster the goals of this Comprehensive Plan and Joint Plan. Development regulations will be integrated and coordinated to achieve this purpose. C.* Citizen Participation The City of Yelm and Thurston County support the Growth Management Act policies to ~ encourage and promote citizen participation within the UGA . Development regulations should provide for ample notice and opportunity to participate in key stages of the planning and development process. D. Growth Management Act Planning Yelm is a small community and without resources to fully articulate all GMA goals and objectives into this Plan. Small cities and towns are authorized to use an abbreviated process, which Yelm has elected to do. Yelm is committed to continued review and improvement of its Comprehensive Plan and development regulations, as resources are available. E.* Comprehensive Plan Amendment The Comprehensive Plan is to be amended no more than once any calendar year, except in emergencies. Development regulations will identify an annual calendar to facilitate the review and amendment process. The City plans for annual review will be consistent with the policies of Thurston County for amendment of the County's Comprehensive Plan. Yelm's ~}ea~s-~q° +°rm urban growth boundaries shall be reviewed not less than every ~ XIV - 1 Fish and Wildlife Habitat Areas ~ I Yelm does not have identified priority habitats and species within the UGA~a~#~ A~ea, but is on land near the Nisqually River which provides important habitat and wildlife areas, in addition to the scattered locations of oak habitat (see Critical Areas I Map #4~). Shoreline and development regulations, and project-level SEPA reviews shall be used ~ to assure that development within the UGA does not adversely affect abutting wildlife and fish habitat outside the urban area. Inside the urban area, development regulations should provide incentives for wetland and habitat enhancement. Yelm Creek and Thompson Creek provide opportunities for such enhancement within ~ the UGA . Wetland and wildlife enhancement should not extend beyond the specified wetland buffer, however, if to do so would reduce densities below those specified in the development regulations. It is important that Yelm obtain and promote urban densities in the urban areas to reduce development pressure outside the urban areas. Any development directly affecting the Nisqually River shall be reviewed for consistency with applicable State, County, and other habitat management programs. Urban landscapes are valuable supplements to natural areas in providing habitat for a wide variety of wildlife. The loss of natural wildlife habitat to urban development can be partially offset by landscaping that includes a variety of native plants that provide food and shelter for wildlife. Native plants are generally well adapted to the soils and climate of the area and many species can flourish without much watering or fertilization. Goals EG 10 Preserve, protect, and enhance fish and wildlife habitat. EG 11 Provide fish and wildlife habitat of sufficient diversity and abundance to sustain existing indigenous wildlife populations. Policies ~ EP 30~ The city should preserve and enhance native vegetation in riparian habitat, and wherever possible. ~ EP 31~ The City should manage aquatic and riparian (stream side) habitat in a way that minimizes its alteration in order to preserve and enhance its ability to sustain fish and wildlife. ~ EP 324 The City should encourage residents and businesses to use native plants in residential and commercial landscaping. ~ XII-8 ~ EP 19~ Restrict the runoff rate and quality to predevelopment levels for all ~ new development and redevelopment. Shorelines The City of Yelm adopted the Thurston County Shoreline Master Program to implement the state's Shoreline Management Act. While Yelm Creek is designated as a shoreline of the state, it is questionable if the creek sustains the minimum flow requirements of more than twenty cubic feet per second, RCW 90.58. Also, the Centralia Power Canal was not identified in the Shoreline Master Program as a shoreline of the state, but flows clearly exceed the minimum flow requirements and it should be designated as a shoreline of the state with the appropriate land use designation in the urban area consistent with urban densities. Policies ~ EP 20~ The Conservancy shoreline designation, as identified in the Shoreline Master Program for the Thurston Region, should be retained along the Nisqually River and its jurisdictional wetlands. ~ EP 21~ Yelm Creek should be monitored to determine minimum flow. If supported by the flow data, the Shoreline Master Program should be amended to delete Yelm Creek's mapped designation as it is not a regulated shoreline under State guidelines. ~ EP 224 The Centralia Power Canal should be added as an urban shoreline on the south side and a rural shoreline on the north side. ~ EP 23~ The Nisqually River Management Plan identifies policies and programs for the protection of the Nisqually Basin. The Management Plan policies are to be considered in adopting development regulations for the community. Frequently Flooded Areas Development in flood plains reduces the storage capacity and increases the amount of runoff. Increased runoff overtaxes both natural and man-made conveyance systems and leads to damage of public and private property. Over the last five years, the City of Yelm has collected substantial information on Yelm Creek and it's floodplain. The Federal Emergency Management Agency conducted a Yelm Creek Study and issued a new Flood Insurance Rate Map (FIRM) in June of 1999. A Yelm Creek Comprehensive Flood Hazard Management Plan was adopted in July of 2001. Both products incorporated the use of best available science. Goals EG 8 Prevent the loss of life and property in frequently flooded areas. XII-6 Wellhead Protection Areas ~ Because the City relies on groundwater for its drinking water, it must take preventative measures to avoid contamination in areas surrounding well sites. The City of Yelm Wellhead Protection Plan, developed by Robinson & Noble, Inc, 2001, focuses on three primary areas: A hydrologic evaluation of the aquifers used by the City, and the delineation of wellhead protection areas (WHPAs) for each of the City's production wells, An inventory of potentially hazardous materials inside the delineated WHPAs, and The development of management, spill response, and contingency plans. Goals EG 5 Implement a wellhead protection program to ensure a safe source of drinking water and to avoid the large financial impact of contaminated wells. Policies EP 9 The City shall utilize a wellhead protection program based upon best available science. ~ EP 10 Legislation shall be maintained, and updated as necessary, regulating land uses within wellhead protection zones 1- 3. EP 11 The City of Yelm shall strive to prevent contamination of drinking water supplies and to develop contingency plans to provide additional sources, should an existing source become unusable. Wetlands and Streams Wetlands are a valuable natural resource. They receive surface water from surrounding areas and filter pollutants entering the system. By storing floodwaters, wetlands reduce flooding and downstream erosion; trap and absorb sediments; and help protect water quality. Wetlands discharge water to aquifers and streams and help replenish groundwater. The City of Yelm is located within the Nisqually drainage basin. There are two streams that run through the city, Yelm Creek and Thompson Creek. Over the years, both Yelm Creek and Thompson Creek have experienced ecological degradation from the loss of shade trees, invasion of plant species like reed canary grass and nightshade, and . repetitive dredging. ~ XI I - 4 The merits and costs of environmental actions must be weighed and balanced against ~ other important demands, such as public safety and recreation, housing, public infrastructure, and economic development. Land use and development practices need to be compatible with the variety of environmental conditions. As a general rule, the City should protect the natural environment rather than try to overcome its limitations for development. Goal EG 1 Protect the natural environment and preserve environmentally sensitive areas. EG 2 Promote quality building and development that is compatible with the surrounding environment. Policies EP 1 The City should work with adjacent jurisdictions, state, federal, and regional agencies to protect sensitive areas and the City's natural environment. EP 2 Protect and restore environmental quality through land use plans, surface water management plans and programs, comprehensive park plans, and development review. EP 3 Develop regulations and programs that encourage well-designed land use patterns such as clustering, low impact development, and planned unit development. Use these types of land use patterns to concentrate higher urban land use densities and intensity of uses in areas with environmentally sensitive features. Water Resources Yelm has several shorelines and abutting floodplains in or adjacent to the urban area, including Yelm Creek, Thompson Creek, the Centralia Power Canal, and the Nisqually River. The Nisqually River is host to a number of fish species and runs, which are dependent upon the water quality of the River and its tributary and riparian (stream side) areas. Yelm also has several wetland areas (shown on the critical areas maps), which form the headwaters of the two Creeks, and are indicative of the groundwater levels and proximity to the surface. Additionally, Yelm has an unprotected aquifer which underlies most of the urban area. The City's wells, and many private wells, use the aquifer for water supply. The water quality in the urban area is important for both public and environmental health reasons, and it is the policy of the City to provide methods and incentives for ongoing protection and enhancement within the urban area. XII-2 reasonable prices. This is key to accommodating a variety of densities at ,.,,,w affordable prices. The City focus under this plan is to assure that such facilities are planned for and available to meet growth demands which reflect the changing population needs. Housing patterns will be monitored to assure that the City is continuing to meet its required housing needs. Adjustments will be ~ made throughout Yelm and the Yelm UGA during periodic revisions to the Plan where monitoring shows a Sub-Area need for change to assure that required housing needs continue to be met. Encouraqe Diversitv of Housinq Tvpes to Offer Choice and Affordabilitv Diversitv in housinq tvpes and location will help to increase housinq choices. This will help meet the chanqing housinq requirements associated with a chanqinq population. Households are qettinq smaller. More people live alone. People are livinq lonqer. Some prefer to live in condominiums or townhouses to be free of the maintenance requirements of a detached house. Provide Housinq Choice In Transportation Efficient Areas Meetinq housinq needs especially for low income and elderlv means expandinq housinq opportunities near essential services and accessible transportation. This allows households an opportunitv to choose to own fewer cars. Studies show that household vehicle costs consume 18 pereent of income and are the second largest household expenditure after housing. (Source: Livable Places and Victoria Transportation Policv Institute, 2002.) Low income households in low densitv suburban areas spend 25 percent of their income on transportation. (Source: Transportation Research Board, 2001.) Maintain Existinq Older Housinp Stock Keepinq and maintaininq the existinq affordable housinq (much of which is the existinq older housinq stock) is qenerallv a rnore effective strateqv than trving to create an equivalent quantitv of comparablv priced new housing. Community Development Block Grant lCDBG) funds are used to rehabilitate deterioratinq housinq units in the rural countv and south countv towns but the need exceeds the available federal fundinq. IV - 18 Policy 4-1:* Continue to adopt the most up-to-date and safest building, housing, mechanical and other codes. Policy 4-2: Require owners of unsafe dwelling units to correct significant problems. GOAL 5:* Promote energy efficient housing to reduce the overall costs of home ownership. Policy 5-1:* Support programs that improve existing structures to make them more energy efficient. Policy 5-2: Periodically review energy efficiency requirements adopted by the City to ensure that they are up-to-date. Policy 5-3:* Promote residential subdivision designs that maximize solar heating opportunities. Policy 5-4: Accessory dwelling units should be permitted in all residential zones, within the City, provided that development standards and design criteria are satisfied. GOAL 6:* Conserve and improve the existing housing stock and neighborhoods. Policy 6-1:* Support rehabilitation efforts for substandard housing. Policy 6-2:* Encourage and facilitate economic development as an important element of improving housing conditions by providing economic opportunity. D.* Future Needs and Alternatives 1. Introduction This section discusses the number of affordable housing units within each income category that will be needed from one forecast period to the next. These figures are based upon the population forecast approved by the Urban Growth Management Committee of Thurston Regional Planning Council (TRPC) in 1993. Since Yelm is required to plan for the growth anticipated within the UGA, the estimates are for the entire Yelm UGA~ rather than for the current City limits. The estimates are shown in ~i~1-~---Table 13 below: ~ IV - 16 4. Analysis Yelm's UGA is expected to grow substantially during the next 20 to 25 years, and household size to continue to decrease. +ho . . These two factors point to a continuing demand for affordable housing. Although housing costs are less expensive than in many other Thurston County jurisdictions, average income is also lower. As ~ €+~e-Table 76 and 8 illustrates, there is an existing need for affordable housing that is expected to increase proportionate to the population. Based on a review ~ of ~9982000 data, adequate single-family housing is likelv to be available. While multi-family units are being constructed, there is likely a need for more multi- family housing that will be occuqied bv an aqinq population, bv sinqle persons, and bv those who marrv later in life. The adopted Land Use Plan provides for a variety of additional housing types and ~~~r°~c°~ multi-family zoned property income is also lower. ~ ~e~ D°~* #~l~eF o°~* ~ ~ 9-~~ 4;4~~ ~4 ~ 3~ ~9 ~6 ~A---~9~4 a-a-a- ~A-6-~ ~9~ 4a-4 -~~9---a-9~ 9 ~ ~4 3~3~ a 96A-~9 ~ ~ a-4~1-9 -~~-4-9 ~ ~ 9:-94 ~94~8---a 949 4~a ~ ~ ~9 S9 ~6 a-~; 944 * o I TABLE 12 YELM AND COUNTY HOUSING STOCK AGE . . . . . . . . Built Before 1980 (1980 and older) 565 45,393 1980 to 2000 (598 of these built since 19901 752 41.259 Yelm Housinq Stock Aqe by Decade Built Before 1939 120 6,138 1940 - 1959 82 8,530 1960 - 1969 54 9.356 1970 - 1979 309 21.369 1980 - 1989 172 17.247 1990 - March 2000 580 24.012 Total 1,317 86,652 Source: Census 2000. IV - 14 ~ ~ :-------~Gd~~~~--~~ , ~ ~ , , ' ~ 0 AE~~ ~~-be~~ ' a-~-4 ~~e~~ ~ ~ .~8 ~ ' ~ e ~ , ~ ~ ~ q~e--~ ~ e-e~€-~ ~ ~A-~ , ~ ~-9A ~ ~ 4~ ~ ~ ~ sa~+ ~ I =Fe4~ ~!~~-e~ ~i~ ~ ~~e~ ~o~ ~e a-~ ~ ;844 I ~ ~ ~ IV-12 ....A. I * o ~ e .~~czr...~'^~" ~v~n~et}~- ~ ~ ~ o ,.~~+~tn~ ~9 , ~~~e: ~ , #e~~ e~ ~ ~4 ~#e~~~~e-b „ Th~~~ o ~~y~~8H8'S~ ~ lV-10 I$25,000 -$34,999 150 12.4 10,417 12.8 ~t I$35,000 -$49,999 253 21.0 14,501 17.8 I$50,000 -$74,999 300 24.9 19,489 23.9 I$75,000 -$99,999 82 6_8 9,655 11.8 I$100,000 -$149,999 40 3_3 6,430 7_9 I$150,000 -$199,999 9 0_7 1,160 1.4 I$200,000 or more 3 0_2 1,242 1_5 I Median Household Income (Dollars) 39,453 ~ 46,975 ~ Source: Census 2000. c. Housing Affordability Housing is generally considered to be affordable if the cost does not exceed 30% of family income. ~Table ~7a~~ below shows that for owner-occupied housing in YeIm,~34.0% (64-196 out of ~574) e# households pa~-paid 30% or more of their family income for housing. For owner-occupied housing in Thurston County (overall), (4,9-~9,801 out of ~441,441) of households aid 30% or more. Table 8 shows that f~or renter-occupied housing, 55~38% in Yelm pay 30% or more of their family income for housing, and ~-940% in Thurston County (overall) pay 30% or more. I ~-CYtii r1VCDAI I* ~fuLarll f1C/T(1T41 ~FL-JI-I(ll 1'1CT(ITAI v~-~-v-ic~ ti~Ftr~ ~ ziltL:C-i = Y-tT~-Y6 ~F~ytt'tdH - i-'+:~'B ~ra = ~ ~ ~n~~ - ~ , , - , , ~3 = ~8a-4~~~ _ ~e , , ~ _ ~:-9% ~~a = ~a9;~9~~ 9-9 ~96~5 = * I o ~ IV-8 4~~ ~A Cinnle Dere.~r~ Ll~~ ~e.eh~li-!e. '~C~ ~ ~d:-~-TB ~ dtl:'d-fb 'Y'6 ~'F-Y9 ''F'~''F'Cti 7.~ i!i't' d'Y.^ctY6 ~ V'1":lrY9 l ~r~rc C~mil~~ /t".1 r~onr~lo\ ~C ~ f ~dd 0 Table 5 Household Characteristics for Yelm (2000) Yelm Countv (Overall) Total Households 1,216 81,625 Familv Household 807 66.4% 54,981 67.3% Familv Household with 505 41.5% 26,896 33.0% Children Under 18 Female Head of Household 175 14.4% 8,429 10.3% Female Household with 130 10.7% 5,712 7.0% Children Under 18 Sinqle Person Households 330 27.1 % 20,473 25.1 % ~ Elderly Households (65+) 363 29.8% 16,546 20.3% Averaqe Household Size 2.67 2.50 I Note: Percent of total. Percentages total more than 100% because some households fit in more than one cateqorv. Source: Census 2000. 2. Income and Affordability a. Introduction A several-step process was used to determine the availability of affordable housing in this section. First, the household income for Yelm was determined and divided into federally-defined poverty categories. Second, information on households spending more than 30% of their income for housing, using standard census bureau income ranges, was determined for both renters and owners. Finally, the resulting information was converted into the federally-defined poverty categories. This resulted in information on Yelm households that spend more than 30% of their income on housing, in each of the federal poverty categories. b. Household Income ~ IV-6 Table 2 ~ Population Estimates, Yelm and Yelm UGA 1995, 2000-2005 Preliminarv Jurisdiction Estimate Estimate ~ Total 1995 2000 2001 2002 2003 2004 2005 Yelm C~ 2,295 3,289 3,420 3,485 3,830 4,150 4,455 UGA 1,085 1,095 1,110 1,105 1,105 1,115 1,135 Total 3,380 4,384 4,530 4,590 4,935 5,265 5,590 Source: 1930 to 2000 - U.S. Bureau of the Census. 2005 Washinqton State Office of Financial Manapement: UGAs - TRPC Small Area Population Estimates. Table 3 Population Proiections - Yelm and Yelm UGA 2005 to 2026 and 2030 Population Estimate (2005) 5,590 Master Planned Population Proiection (2026) 10,560 Dwelling Units Population Proiection (2030) 11,480 2005-2030+ Population Growth (2005 to 2026) 4,970 Vested or recentlv Population Growth l2005 to 2030) 5,890 approved 1,200 dwellinq units Proiected Dwellinq Units Needed to 2,719 Accommodate Growth (2005 to 2026) (2005 to 2030) 3,239 Approximate Number of Acres Needed for Presubmission Review Housinq bv 2026 9062 5,000 to 6,000 dwellinq B 2030 1080 units Source: TRPC Population and Emplovment Forecast 2006. Repional Benchmarks for Thurston Countv Julv 2003 TRPC traditionallv uqdates population and emplovment forecasts everv 3-5 vears and released the most recent small area (citv and ruraD populations forecasts in Julv of 2005 (these were formally apqroved in 2006) The latest release was prior to the proposal of the Thurston Hiqhlands master planned communitv in Yelm which mav include 5,000 to 6,000 new dwellinq units. The buildout of this development mav exceed the time ranqe of the 2030 forecast TRPC will continue to monitor residential and commercial develooment activitv and anv qroposed changes in Thurston Countv's rural zoninq or the size of the Urban Growth Areas and anticiqates uqdatinq the small area lcitv and rural) aopulations forecasts in 2007. At an averaqe densitv of 4 units/net develoqed acre (3 units/acre qross) 906 acres would be needed to accommodate 2,719 housinq units lestimated between 2005 and 2026). . , , ~c~--~rJ ~B ~~~~'~-F ~~J n° ir r~ill~~~er ryr~~~i~h Fr~ 1~-F IV-4 2. County-Wide Planning Policies The City and County will institute measures to encourage the availability of affordable housing for all incomes and needs and ensure that each community includes a fair share of housing for all economic segments of the population by: 7.1 Establishing a process to accomplish a fair share distribution of affordable housing among the jurisdictions. 7.2 Working with the private sector, Housing Authority, neighborhood groups, and other affected citizens to facilitate the development of attractive, quality low and moderate income housing that is compatible with the surrounding neighborhood and located with easy access to public transportation, commercial areas and employment centers. 7.3 Accommodating low and moderate income housing throughout each jurisdiction rather than isolated in certain areas. 7.4 Exploring ways to reduce the costs of housing. 7.5 Examining and modifying current policies that provide barriers to affordable housing. 7.6 Encouraging a range of housing types and costs commensurate with the employment base and income levels of their populations, particularly for low, moderate and fixed income families. 7.7 When possible, provide assistance in obtaining funding and/or technical assistance for the expansion or establishment of low cost affordable housing for low, moderate and fixed income individuals and families. This housing element was written to be consistent with the County-Wide Planning Policies. B.* Inventory and Analysis 1. Population and Demographics a. Population The population of Yelm has grown irregularly over the last ~ 75 years. As shown in ~~-Table 1 below, the largest increases occurred during the 1990's, ri~~more than doubling e#-the population. Population increased bv 35% between 2000 and 2005. It is anticipated this qrowth rate will continue over the next 20 to 25 vears. The 1970's increase is attributed to a program of the federal Farmers Home Administration (FmHA) to provide low-cost loans for low-income families relocating to rural communities. . , Growth since 1990 #~e °°„°r°' .,°^r~. has been hiqh, in part due to people searching for more IV-2 ~ ~ ~ 4~5:~ I I ~:S I ~ ~ ~ I ~;4•43.~ i nrlc fnr ~ei•~c4c~~~ ~or ro~ ~ o•~ r! rcccnto ~rga -tdd~t ( ~ ~ ~ ~ -69a~ I I ~ ~ ~-~eads I o -~9~ I , , , , 4~3`~ 4-~-~- 1 ~ Qo~~ ~ ~ iii-s I Table 1~ - Estimated Population and the Housinq Needed to Accommodate Growth - Master Planned ~ Proiected population at vear 2026 10,560 Dwellinq Units1 Pro'ected o ulation at ear 2Q30' 11,480 2005-2030+ I Amount of population growth 4,970 Vested or recentlv expected between 2005 and 2026 approved 1.200 dwellinq units Amount of population growth ex ected between 2005 and 2030 5.890 Approximate number of housinq units ~ needed to accommodate the 2,719 units proiected qrowth between 2005 and ~ 2026. Approximate number of housinq units ~ needed to accommodate the 3,239 units proiected growth between 2005 and 2030. I Approximate number of acres needed _2,026 906/acres Presubmission Review for housina, based on averaqe tarqet 2,030 1,080/acres 5,000 to 6,000 densitv of 4 dwellinq units per net dwellinq units ~ develo ed acre 3 units/acre ross Source: Thurston Regional Planning Council - Population and Employment Forecast - 2006;, Reqional Benchmarks for Thurston Countv. Julv 2003. ~ TRPC traditionallv updates qopulation and emplovment forecasts everv 3-5 vears, and released the most recent small area (citv and rural) populations forecasts in Julv of 2005. The latest release was prior to the ~r~osal of the Thurston Hiqhlands master planned communitv in Yelm, which mav include 5 000 to 6 000 new dwellinp units. The buildout of this develoument mav exceed the time ranqe of the 2030 forecast TRPC will continue to monitor residential and commercial development activitv and anv proposed chanqes in Thurston Countv's rural zoninq or the size of the UGA and anticipates updatinq the small area (citv and rural) populations forecasts in 2007. III - 6 C.* Changing the Land Use Map I 1. The purpose of the Joint Plan is to identify land uses within the UGA A~ea. The land use designations shown on the Future Land Use Map (Map #3) in the unincorporated area will not take effect until annexation and inclusion within a sewer discharge permit area. Those land uses within the City shall take effect upon approval for inclusion within a sewer discharge area. If the land use designations are to be changed from the map, such changes should take place in the context of the Comprehensive Plan review. 2. To promote coordinated development, any land use approved in this Joint Plan will not be unilaterally changed by either the City or the County for three years from the date of this plan without written approval from the other jurisdiction. ; ~-T~ie-G+#~a~s aa~e~ , ; ~ . u'1L~~8 ~ ~ n~-2X~~;a~fl--FS-~T2~F'~AF+S 2--~9f~S+SteR~-VW ^~^~~~-~}2 ~ . , t~ii~hin fon ~ic~rc ~n ~or~ic ~hc nc~~i ~+re~. D.* Interaovernmental Coordination The Citv of Yelm will cooperate with qovernmental iurisdictions includinq the Commander of the Fort Lewis militarv base and neiqhborinq iurisdictions. The citv will take into consideration the current land use and lonq-range qoals of iurisdictions The Citv will provide notification and opportunity to comment prior to final action on a Comprehensive Plan or development requlation amendment. At a minimum the Citv will provide notification to state aqencies as listed bv the Communitv Trade and Economic Development Department, and the Fort Lewis Base Commander III - 4 VI. Transportation - A. Adoption of Existing Documents ...............................................................VI - 1 B. Objective of Transportation Plan ...............................................................VI - 1 C. Levels of Service (LOS) ............................................................................VI - 2 D. Other Transportation Service ....................................................................VI - 2 E. Implementation of Transportation Plans ....................................................Vl - 3 VII. Parks/Open Space ........................................................................................VII - 1 A. Growth Management Objectives - B. County-Wide Policies ...............................................................................VII - 1 C. City of Yelm Policies and LOS .................................................................VII - 1 VIII. Economic Development ................................................................................Vlll - 1 IX. Siting Essential Public Facilities .....................................................................IX - 1 X. Capital Facilities Plan ......................................................................................X - 1 XI. Visioning - XII. Environment ..................................................................................................XII - 1 ....................................................................................XIII - 1 XIII. Historic Preservation ~ XIV. Miscellaneous Provisions XIV - 1 A. Property Rights XIV - 1 B. Permits XIV - 1 C. Citizen Participation XIV - 1 D. Growth Management Act Planning XIV - 1 E. Comprehensive Plan Amendment XIV - 1 F. Growth Management Definitions and Concepts XIV - 2 EXHIBITS Exhibit A County-Wide Planning Policies (August 1993) and as amended Exhibit B Population Projections and as amended Exhibit C Yelm Open Space Ordinance, amended 8/94 and as amended Exhibit D Interim Yelm Critical Areas Resources Land Ordinance, 9/92 and as amended Exhibit E Regional Transportation Improvement Program, 1995-1997 (September 1994) and as amended Exhibit F Essential Public Facilities Comprehensive Plan Provisions (January 1994) and as amended Exhibit G Consolidated List of Policies, Applicable to the Unincorporated Yelm Urban Growth Area (January, 1995} and as amended ii ~ will heip achieve overall density „_,s goals. Development standards will be established to permit integration of duplexes, townhouses, and accessory units within the City's residential areas, using appropriate controls to protect the safety and quiet enjoyment of the area. Such housing is intended to broaden and increase the variety of housing available in the community and aid in achieving the overall urban density. (i) UGA , unincorporated (County jurisdiction) - 1 unit per 5 acres_(qross densitv) ? Yelm will propose development regulations to assure coordination and steps to aid in accomplishing the goals of this plan within the unincorporated urban area. Pursuant to County- Wide Planning Policies, the County will adopt coordinated regulations. I (ii) Citv of Yelm , ~ ? 4 units per acre - no minimum density (3 units/acre is the expected rQ OSS density), (net densitv of 5.8 units/acre is currentlv beinq achieved) ? 6 units per acre (including mobile home parks and subdivisions) - 3 units per acre is minimum density (5 units/acre is the I expected rp OSS density) ? Non-Sewered Overlay (all City lands where sewer is not yet available) - 1 unit per 5 acres until sewer service is approved through an approved sewer facilities plan designating the long- ~ term disposal site, then underlying zoninge applies. Any development within the Non-Sewered Overlay shall be consistent with CWPP 2.1(e) as further defined through development regulations. (iii) Apartment ? Medium Density Apartment - 10 units per 1 acre ross densit ? High Density Apartment - 20 units per 1 acre (gross densitv), 15 acre minimum lot size (iv) Mixed Use (Planned Developments) in Residential Areas Mixed use developments are used for larger parcels to provide a variety of uses, more efficient use of open space, and public facilities. Mixed use proposals must accomplish not less than 75% of the underlying density for a property and not more than 125% of the planned maximum density for the property. Mixed use III - 2 I outside the urban growth boundary and will continue to be ~ served by on-site systems ' until road and sewer improvements are available for extension of urban services. c. Logical Boundaries Major roads such as 93rd and SR 510, and defining features such as the Canal and Fort Lewis provide logical boundaries for the Northwest Planning Area. E. Public Participation 1. Build on Existing Work Done ~ It is the policy of Yelm to build on work previousy done, to include and incorporate prior public programs, such as joint planning, the Economic Summit, parks planning and visioning processes. 2.* Provide Public Notice It is the policy of Yelm to provide public notice and opportunities for public participation throughout the Comprehensive Planning process. 3.* Provide Opportunity for Public Input It is the policy of Yelm to provide opportunity for public input at all phases of Plan development. II - 10 areas within the City which are closest to Pierce County and the growth occurring in the Roy-McKenna area. I 2. "South" Planning Area (see Map 8~-) The South Planning area is bounded by State Highway 510 on its north and west boundaries. The east boundary is the Centralia Power Canal and the south boundary is the base of a ridge which reflects a logical point of division between the urban and rural areas. a. Urban Growth The core of the South Planning Area is part of the urban center of the community. A new school site is located on the western boundary of the site and the northern boundary is the commercial development prevalent along State Highway 510. The area close to the existing city limits is substantially developed in suburban lots, which is the anticipated development pattern. The area near the City contains few limitations for development and is considered appropriate for urban levels of development. b. Municipal Utilities The South Planning Area is served or planned to be served by City sewer and water. City sewer is expected to be provided in the area. Due to the substantial recent development on septic tanks, the City anticipates using a septic maintenance program to monitor and assure adequate sewer service in this planning area until sewer lines are extended to facilitate urban growth. c. Logical Boundaries The state highways and the canal provide logical physical features for the urban boundary. The southern boundary is a physical feature and potential state highway corridor, which provides a logical area within which the City will provide urban services. ~ The ~Urban Growth Boundarv area includes an existing Agriculture/Environmentally-Sensitive Area which is included because ~ ~-development is expected over time and the area makes a logical service boundary. I 3. "Southwest" Planning Area (see Map 9~) The Southwest Planning Area is bounded by Fort Lewis on the west, 93 Ave SW and Highway 507 on the north, Highway 510 on the east, and the City Limits on the south. a. Urban Growth More than 90% of the Southwest Planning Area is included within the City of Yelm as part of the Southwest Yelm Annexation Area. The area is II-8 ~ ~ ~ Student Enrollment,1990-2005 Yelm Public School District . . • ~ . ~ ~ Yelm 3 301 4 172 4 172 4 525 4 671 4 737 4 936 2.4% 4.2% I Source: Washineton State Oftice of Suqerintendent of Public Instruction, www.kl2.wa.us. C.* Urban Growth Area Boundaries 1. Goals and Objectives of the Yelm UGA Boundary The UGA is a product of joint planning with the Board of Thurston County Commissioners after review and recommendation by the Urban ~ Growth Management Committee. The UGA is designed to permit growth to occur, at urban densities, during the next 20 years, while assuring adequate facilities and the preservation of sufficient land to assure adequate open space and preservation of critical areas. The area must also contain sufficient land area to assure reasonable choice and variety in meeting residential, commercial, and industrial needs and a reasonable allowance of reserve areas to provide ~competitive and affordable land on which new development should occur. n„ +h,~ ~,++or +ho r;+., ,~o+e~.„;,,e,~ +h„ , 0 ~e ~ee~-##~s~a~e~ ~aaas~e-gT ,•~*h ~ea-ar~~r~+°~~s k~~°~R .See Chapter III Table 1 and 2 for estimates of land needed to accommodate population qrowth and land supply vs. demand. 2. The Planning Subarea Characterization of the Yelm Growth Area The key elements used to identify the property in a~-a~e~the City of Yelm and its Urban Growth Area are as follows: a. Characterized by urban growth or adjacent to territory already characterized by urban growth. b. Served or planned to be served by municipal utilities. c. Near urban areas and characterized by the ability to support urban growth. d. Follows logical boundaries. e. Provides adequate room for growth. ~ f. Reflects citizen preference. II-6 B. Population and Demographics ~ 1.* Basis for Land Use Planning a. Forecasted Population: (see Exhibit B for details) I lfrnm TRD(' 1/A /~4 A#~nh.r,on+ Z nf Cvhihif R\ ~9~ ~ 81-a ~5 I D~~~ior !'`.~r,~l /TA7 7~'~\ , ~ _ , . I Total Estimated Population Between 2000 and 2030 Yelm and Yelm UGA from TRPC Exhibit B 2000 and Population 2 2005Po ulation Medium Growth Population Growth I 2000 4.385 2026 10.560 2005-2026 4,970 2005 5590 2030 11480 2005-2030 5 890 ~ Source: Thurston Countv Profile, 2005; TRPC Small Area Poqulation Estimates 2006 ? TRPC traditionallv updates population and emplovment forecasts everv 3-5 vears and released the most recent small area (citv and rural) populations forecasts in Julv of 2005. The latest release was qrior to the proposal of the Thurston Hiqhlands master planned communitv in Yelm, which mav include 5.000 to 6,000 new dwelling units. The buildout of this development mav exceed the time ranpe of the 2030 forecast. TRPC will continue to monitor residential and commercial development activitv and anv proposed chanQes in Thurston Countv's rural zoninq or the size of the Urban Growth Areas. and anticiqates updatinq the small area (citv and rurall populations forecasts in 2007. II-4 economic growth, all within the capacities of the state's natural resources, public services, and public facilities. (6) Property rights. Private property shall not be taken for public use without just compensation having been made. The property rights of landowners shall be protected from arbitrary and discriminatory actions. (7) Permits. Applications for both state and local government permits should be processed in a timely and fair manner to ensure predictability. (8) Natural resource industries. Maintain and enhance natural resource- based industries, including productive timber, agricultural, and fisheries industries. Encourage the conservation of productive forest lands and productive agricultural lands, and discourage incompatible uses. I (9) Open space and recreation. Retain open space, enhance ~r°^° +"o recreational opportunities, conserve fish and wildlife habitat, increase access to natural resource I lands and water, and develop parks and recreation facilities. (10) Environment. Protect the environment and enhance the state's high quality of life, including air and water quality, and the availability of water. (11) Citizen participation and coordination. Encourage the involvement of citizens in the planning process and ensure coordination between communities and jurisdictions to reconcile conflicts. (12) Public facilities and services. Ensure that those public facilities and services necessary to support development shall be adequate to serve the development at the time the development is available for occupancy and use without decreasing current service levels below locally established minimum standards. (13) Historic preservation. Identify and encourage the preservation of lands, sites, and structures that have historical or archaeological significance. RCW 36.70A.Q20 The purpose of this Comprehensive Plan is to identify how the statewide goals will be met in the City of Yelm and the UGA. Procedural guidelines for the adoption of this plan were provided by the Washington State Department of Community, Trade and Economic Development under WAC 365-195-300 which were followed in the preparation of this document. 2.* County-Wide Planning Policies (CWPP) Thurston County, with the advice of the Cities and Towns in Thurston County, adopted County-Wide Planning Policies (CWPP) to aid and focus the Growth Management planning activities in Thurston County. These County-Wide Planning Policies were specifically approved by the City of Yelm. The CWPP in effect at the time the City of Yelm adopted its Comprehensive Plan are as set forth at Exhibit A. The purpose of this Comprehensive Plan is to identify how the II-2 ~ ~ The City and the County se~e~~have an urban services agreement and cooperation through permit processing and development regulations to implement the intent of this Pla n. ni+ ' n.,f+he Volrr~ I Irh~r~ !'_`rn~~hh Arc~ ic Inn~+or! ir~ Cvhihif D. Consistency ( The Joint Comprehensive Plan for the UGA rh~r~ (~r~~~i4h e~o~ incorporates and consolidates much of the planning which has been going on in the UGA. Many plans, including transportation and water, were completed using assumptions or calculations somewhat different from the assumptions used in this Comprehensive Plan. Where a variation exists, the more recent shall control and nonconforming plans are to be modified accordingly. ~ I-5 C. Applicability ~ ( The Comprehensive Plan is intended to apply to the entire UGA . Jurisdictionally, the Plan will be implemented in the City by the City of Yelm within the I City limits and in the unincorporated UGA by Thurston County. Thurston County will adopt the following sections or portions of sections of the Yelm Comprehensive Plan and Joint Plan as applicable to the unincorporated UGA~ (also see these sections of the Plan marked with an Cha ter Section I. Introduction Whole Cha ter II. GMA Planning A.1. Growth Management Act Parameters A.2. Countywide Planning Policies B.1. Basis for Land Use Planning C. Urban Growth Area Boundaries D. The Planning Sub-Areas E.2. Provide Public Notice E.3. Provide O ortunit for Public In ut III. Land Use A. Policy Guide B.2. Proposed Land Use Designations (subsection a.(i) and e. only) C. Changing the Land Use Map Interqovernmental Coordination I ° E. Transfer of Development Rights Program F. Plannin Subareas-Potential Land Uses IV. Housing Whole Chapter, except Goal 2 and policies 1-2, 2-1, 5-2 and 5-4 V. Public Facilities and F. Overall Goals and Policies, except Goal 1 and Utilities Polic 1-1 VI. Transportation Whole Cha ter IX. Siting Essential Public Whole Chapter Facilities XIV. Miscellaneous A. Property Rights Provisions B. Permits C. Citizen Participation E. Com cehensive Plan Amendment Exhibit A, County-wide Whole Exhibit Plannin Policies Exhibit B, Population Whole Exhibit Pro'ections I-3 I. INTRODUCTION* _ A. Intent The Yelm Comprehensive Plan represents the vision of the City of Yelm for development of the community over the next 20 to 259 years. This Plan also serves as the Joint Plan between Yelm and Thurston County for Yelm's Urban Growth Area (UGA)._ Sections of the Plan adopted bv Thurston Countv are noted in each chapter (see the sections of the plan marked with an The Plan is written in the context of the State Growth Management Act, which mandates issues which must be dealt with in a comprehensive plan and County-Wide Planning Policies which identify how certain aspects of growth management planning are to be met in Thurston County. Relevant County-Wide Policies in place at the adoption of this plan are included at Tab 1. The narrative portions of the Plan identify specific goals and objectives of the City for ~ the UGA which shall be considered policies for purposes of consistency. The purpose of the Joint Comprehensive Plan (the "Plan") is to identify how development is to occur over the next 20 to 259 years for the City area and for the County area within the UGA which will eventually be served by City of Yelm public facilities and utilities. The Plan is to be revisited not less than each #+~e seven years to review population progress, the effectiveness of the existing plan, and the need for change. B. Content The Plan is designed to incorporate and coordinate many of the Yelm planning documents into a coordinated whole. For purposes of a complete picture, the "Yelm Comprehensive Plan" consists of the following documents: VOLUME 1 Comprehensive Plan Text Applicable to Entire ~ Ci and UGA? Chapter I Introduction yes Chapter II GMA Planning Parameters yes Chapter III Land Use yes Chapter IV Housing yes Chapter V Public Facilities & Utilities yes Chapter VI Transportation yes Chapter VII Parks/Open Space no Chapter VIII Economic Development no Chapter IX Siting Essential Public Facilities yes Chapter X Capital Facilities Plan no ~ I-1