Loading...
8322 Infgallery 070703July 7, 2003 Mr. Fred Murry Easthaven Villa Assisted Care Facility Phase 2 311 Cullens Road NW Yelm, Washington 98597 RE: Revised Infiltration Gallery Section for Roadway Easthaven Villa Assisted Care Facility Addition City of Yelm Project No. CUP-02-8322-YL Dear Mr. Murry: I have reviewed your letter dated July 2, 2003 requesting to change the infiltration gallery design. The letter states, because of the free draining nature of the soils you would like to reduce the gallery size by reducing the cross section of washed rock used. The currently approved rock infiltration gallery size is 70’x15’x3’ with an 8” perforated pipe. This gallery design has 1,118 cubic feet of storage. By changing the design as requested, the storage of the gallery will be reduced significantly by eliminating the voids created by the washed rock. Without the voids the gallery cannot efficiently operate through multiple storms. Therefore the original approved design must be utilized and installed. If you have any further questions or comments, please call me at (360) 458-8438 or email me at jimgibson@ywave.com and I will be happy to further assist you. Respectfully City of Yelm Community Development Jim Gibson Development Review Engineer Cc: Mark Leingang PE Tim Peterson