MDNS
SEPA NO 8249
MODIFIED MITIGATED
DETERMINATION OF NONSIGNIFICANCE
Proponent.
Stanley Paulus, SSOE, Inc.
Description of Proposal
The proposal has been revised increasing the number of fueling stations
to be constructed from five to seven, resulting in a total of 14 fueling
positions (increase of four positions.)
Location of the Proposal
Safeway Site, 1109 Yelm Avenue East, Yelm, WA
Section/Township/Range
NE 1/4, Section 30, Township 17N Range 2E, Tax Parcel 22730110400
Threshold Determination
The City of Yelm as lead agency for this action has determined that this
proposal does not have a probable significant adverse impact on the
environment. Therefore, an environmental impact statement (EIS)will not
be required under RCW 43.21 C 030(2)(c) This decision was made after
review of a completed environmental checklist and other information on file
with the lead agency This information is available to the public on request.
Conditions/Mitigating Measures
SEE ATTACHED (no additional mitigation has occurred from the revised
proposal )
Lead agency'
Responsible Official
City of Yelm
Shelly Badger, City Administrator
Date of Original Issue
Date Of Re-Issue
Comment Deadline
April 20, 2000
June 6, 2000
No Comment Period
, City Administr
This Mitigated Determination of NonSignificance is issued pursuant to Washington Administrative Code 197-11-
340(2).
This MDNS is not a permit and does not by itself constitute project approval The applicant must comply with all
applicable requirements of the City of Yelm prior to receiving construction permits which may include but are not
limited to the City of Yelm Comprehensive Plan, Zoning Title (17), Critical Areas Ordinance (1408), Storm water
Drainage Design and Erosion Control Manual (DOE), Uniform Building Code, State Environmental Policy Act (SEPA)
Title (14), Road Design Standards, Platting and Subdivision Title (16), and the Shoreline Master Program.
DO NOT PUBLISH BELOW THIS LINE
Published Nisqually Valley News, Friday, June 9, 2000
Posted in public areas Tuesday, June 6,2000
Copies to Dept. of Ecology, agencies/citizens on SEPA mailing list and adjacent property owners, Thursday, June
6,2000
ATTACHMENT
SEPA CASE NO 8249
This Mitigated Determination of Non Significance is based on the project as proposed and impacts and
mitigation reflected in the following
. Environmental Checklist (dated March 6, 2000, prepared by SSOE, Inc )
. Traffic Impact Analysis (dated February 29, 2000, prepared by Heffron Transportation, Inc )
. Transportation Letter - reflecting amended site plan (dated May 3, 2000, prepared by Heffron
Transportation, Inc.)
And the following conditions
1 The applicant shall contribute $750 per new PM peak hour trip generated by the project. The
Transportation Facility Charge (TFC) shall be based on 33 new pm peak hour trips, the proponent
will be responsible for a TFC of $24,750 00 which is payable at time of building permit.
2 Underground fuel storage tanks must be approved and permitted by the Washington State
Department of Ecology
3 The applicant shall submit a Hazardous Waste Spill and Containment Plan to Thurston County
Public Health and Social Services Department for review and approval
- ffin:=T==j:=U.=~:=;=:-=-L==r:+:r~.=i=:fJ=::~:::tIT::::::::=:
___ __
~
~l~l=r=:!.+-l.r+:~j:=~.'~L~i t Il..j.~.!~j I!~
~ J--,... .r"'^;". ,.._.._-~. .....I'<-"T..:r1U - ~._.,~^'- --,.. ~--.,!>,---"-. '.'-i\ I
,/,"'-r; : ;", \ : : 1 V , !. _: ; 'v1 : : :Y t ;. f
(J I j : I (I: I j I r r ' I r I r l I I :
J \ ! ; : l ; . 1 ; 1 ! ~! J ! ! ill ill !~)
li.J... .- -.
-.--.-,tl
-
~ i ! 1 : () : j j 1 : I ! ! I : j i i 1 ; ! ; In! 1
I I l I I I I 1 : I I f 1 J I f..1l I I , I I I 1 'I I I r,
, !.f. I 1 ; i : : / : : ! ! I I I !:, I I ! ! Ii! ! 1 J ~
. ,-T<'rf-r-'1 r-Liv.:--;.-:utC}-i--ti--:'-+'Qr-r-t-Qj :'-',--: ! I
(. III I ' it: I : I 1 I l i 1 .'-1.-:"-I-"-'r""1-I.-t~-'-I-'-~I"'t":
\ I : ' I Ill) I \ I I I : ' I it--. "'-1-.1.."1-~ r-r..\--.,-t'l:1\i
....) . ! i---f 1 I I ~ ! I :! r., ~-+ '-,-T-!-'~'r., -b~--T--l-t..,.
(6!.
. . '
i ~~_J_.
. , '
. , I
tg; !
----~------ ----- I~ :
I I t 'B' 'I 'I ".
I I I : I: f! Ii" -
I I:: 1 I I 1: l: :.,. '":
J.l~.-+-+.A'~-'~'VJ')--~'l. .+-1 fl1;': --~-Htm-~:~'
I "1Hli',, " "I I .. I
I I I I I 'I I. I t I I ~. '-,
: J_l_l I_L~_ _J_l I! ,- !: : '.;
~._'1:::::.:=~:.
- -,,<I-_.~
..-----
F::":. -:. :=.===:= ;~~~::==::::..it-
-
..Iill
-!>o
.=._=_=~I~_=~Q__?~::= =Gi.0:::~ i'!>:=:::(i- ..=-.::=
o
llJlllil
----~
.m, -.(.) .-
~"J-'-
- .~-
--.- -,- -....... ._^'--~_.
~".-.__.-
.
J
t
I
~-,~~.
.;.,-r-ltf_.
--- -- - ~~: ..~~._- -=~.t-:'=:::""-:.~=.;-:=.":-;'~:==:;'~;ff~'.: =-:;:;:::;:'~:;:;"'=~-:;~=:'::'''~r;::-' ~~. ~. ',;.-- :.:.-:-:'~.:.,=:.'~. - :;,:.:~:-...;.:::::c:;:;:-.:..;__. ~J...
~ "I I" ; I I " ---:~l
, """ . SITE PLAN 0 30 60 120 i'.:i:;f
,.... '"=60'-0" ~ I i!
i
'\ '\
EXISl1NQ
SAFEW A Y *1619
56,263 SO FT APPROx.
b'
Et..
I,
i
I'I
:<..)r
Zu
:w.
;0::::
;~
;~I..t...
"::.J
lril'oo
UN
I''''".,
':t'~
I
'.
j.i
,
It
.~
"
=:.~:l
-':1,.
.,
"
"
I~
"
"'- -->~-~
;~.
. '
8.80 I sqft
. 11'1!"
j; :
:i .,...t
(\~
~\rtrW('If,
... ~ J . /
-: . :: I, ,<:''I(r(
....'/1\...... ~')I.... ~S'~i
n--------~" ,
......" ~ r
~.) I~\ !{(~
l O' ::?.,.lil~'''' II
I r' .,;
I ~ ~~'<_'!IT
~ ~.?
I ~ .!-~~, ","':,t"
l ~ r~:-t,~;;
\1 r ;!(...,.
,I "~ ~ {':'\ ("\ r\tl/} :~~ti J ~
'II,..;,""! ...'11\..... --'.,,:- 'Ill' It,..~'''''~i
-'-Q.;
I
~
'i-', ~
~.
.~
,~-
._l!.___.
..
-'~a.
.--t"'}--.,-
...--
VANciL
ROAD
SEPA NO 8249
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
Proponent:
Stanley Paulus, SSOE, Inc
Description of Proposal
Construction of a fueling facility consisting of five gas pumps (10 fueling
positions) and a small kiosk.
Location of the Proposal
1109 Yelm Avenue East
Section/T ownsh i p/Range
NE 1/4, Section 30, Township 17N Range 2E, Tax Parcel 22730110400
Threshold Determination
The City of Yelm as lead agency for this action has determined that this
proposal does not have a probable significant adverse impact on the
environment. Therefore, an environmental impact statement (EIS)will not
be required under RCW 43.21 C 030(2)(c). This decision was made after
review of a completed environmental checklist and other information on file
with the lead agency This information is available to the public on request.
Conditions/Mitigating Measures
SEE ATTACHED
Lead agency'
Responsible Official
City of Yelm
Shelly Badger, City Administrator
Date of Issue
Comment Deadline
April 20, 2000
500 pm, May 3,2000
This Mitigated Determination of NonSignificance is issued pursuant to Washington Administrative Code 197-11-
340(2) Comments must be submitted to Catherine Carlson, City Planner, at City of Yelm, 105 Yelm Ave W , P 0
Box 479, Yelm, WA 98597, by 5 00 pm, May 3, 2000 The City of Yelm will not act on this proposal prior to 5'00
pm, May 10, 2000
You may appeal this determination to the Yelm City Council, at above address, by submitting a written appeal no later
than 5.00 pm, May 10,2000 You should be prepared to make specific factual objections Contact Cathie Carlson,
City Planner, to learn more about the procedures for SEPAappeals This MDNS is not a permit and does not by itself
constitute project approval The applicant must comply with all applicable requirements of the City of Yelm prior to
receiving construction permits which may include but are not limited to the City ofYelm Comprehensive Plan, Zoning
Title (17), Critical Areas Ordinance (14 08), Storm water Drainage Design and Erosion Control Manual (DOE), Uniform
Building Code, State Environmental Policy Act (SEPA) Title (14), Road Design Standards, Platting and Subdivision
Title (16), and the Shoreline Master Program
DO NOT PUBLISH BELOW THIS LINE
Published Nisqually Valley News, Friday, April 28, 2000
Posted in public areas Thursday, April 20, 2000
Copies to All agencies/citizens on SEPA mailing list and adjacent property owners, Thursday, April 20, 2000
Dept. of Ecology w/checklist, Thursday, April 20, 2000
ATTACHMENT
SEPA CASE NO 8249
This Mitigated Determination of Non Significance is based on the project as proposed and impacts and
mitigation reflected in the following
. Environmental Checklist (dated March 6,2000, prepared by SSOE, Inc )
. Traffic Impact Analysis (dated February 29, 2000, prepared by Heffron Transportation, Inc )
And the following conditions
1 The applicant shall contribute $750 per new PM peak hour trip generated by the project. The
Transportation Facility Charge (TFC) shall be based on 33 new pm peak hour trips, the proponent
will be responsible for a TFC of $24,750 00 which is payable at time of building permit.
2 Underground fuel storage tanks must be approved and permitted by the Washington State
Department of Ecology
3 The applicant shall submit a Hazardous Waste Spill and Containment Plan to Thurston County
Public Health and Social Services Department for review and approval