Loading...
SPR Approval ff ... ..I July 28, 1997 City of Yelm ~ '" 105 Yelm Avenue West PO Box 479 Yelm, Washington 98597 (360) 458-3244 Mr Mike Edwards POBox 3800 Lacey; W A 98509 Re Approval ofBmdmg Site Plan SPR-8145 Dear Mr Edwards The Yelm Planmng CommisSion has approved the bmdmg site plan apphcatlOn for a 54,000 square foot commercial complex on Tax Parcels 21724130600 and 21724130500 The site plan (attached) is approved based on the findmgs presented at the Planmng COmmlSSlOn Pubhc Heanng held on July 21, 1997, and subject to the followmg conditions' 1 The appliCant shall contribute financially to the Five-Corners intersection improvement and/or the Y-2 Alternate Route as specified in the 1992 Yelm Comprehensive Transportation Plan Contribution is based on the number of automobile trips generated by this site during the PM peak hour The commercial complex, at build-out, will generate 42 new p m peak hour trips to the Five-Corners intersection Lot 1, to be developed as a 4,950 sf specialty retail will contribute $1137 50 Lot 2, to be developed as a 4,950 sf specialty retail will contribute $113750 Lot 3, to be developed as a 4,750 sf specialty retail will contribute $1092 50 Lot 4, to be developed as a 12,750 sf specialty retail will contribute $2,932 50 Lot 5, to be developed as a 12,750 sf specialty retail will contribute $2,932 50 Lot 6, to be developed as a 4,750 sf specialty retail will contribute $1092 50 Lot 7, to be developed as a 4,950 sf specialty retail will contribute $1137 50 Lot 8, to be developed as a 4,950 sf specialty retail will contribute $1137 50 Total financial contribution for the entire site will be 42 trips at $300:00 per trip = $12,60000 The mitigation fee is due and payable prior to the issuance of building permit for each lot. 2 The Yelm Retail development will contribute to the future signalization of Yelm Avenue and Killion Road The contribution will be based ofl the developments share of traffic at the time the signalization occurs. The developer shall sign a waiver of protest for future contributions towards the signal improvement at the Killion RoadlYelm Avenue intersection 3 The TIA identified the following improvements be constructed by the applicant: a An eastbound right-turn lane on Yelm Avenue at the westernmost site driveway b An eastbound right-turn pocket at the new intersection of Killion Road ExtensionlYelm Avenue c A two-way center left-turn lane on Yelm Avenue from the west property line extending approximately 200' east of the existing Killion Road intersection 4 The applicant shall construct a bus pull-out, shelter and pad located between the site drive * Recyckd paper ~ .... , , Mr Mike Edwards July 28, 1997 Page 2 on Yelm Avenue and Killion Road extension The location of the bus pull-out is temporary and will be re-Iocated to the east of the re-alignedintersection of Killion RdlYelm Avenue The relocated bus pull out will occur as commercial property to the east of the new intersection develops 5 The applicant shall be responsible for frontage improvements along the property frontage of Yelm Avenue West including the necessary right-of-way dedication for improvements The improvements shall be from centerline of Yelm Avenue West and consistent with current development guidelines 6 The applicant shall be responsible for frontage improvements and necessary dedication of right-of-way 'for Killion Road Extension along the property frontage The design of Killion Road !=xtension shall be provided by the City (options attached) and shall be mutually agreed upon by the applicant and the adjacent property owner; John Huddleston 7 Extension and cormectionto the current water line located at Yelm Avenue West and on the southeastern corner of the site'is the responsibility of the applicant and will be constructed per standaras in the Water Comprehensive Plan and City of Yelm Development (3uidelines The applicant shall submitted final utility plans for approval by the City Public Works Department. 8 All onsite wells shall be abandoned in ,compliance with the Department of Ecology standards The applicant shall submit a completed Water Rights Agreement with the civil engineering drawings 9 Connection to the current sewer line on Yelm Avenue is the responsibility of the applicant and will be constructed per standards in the Sewer Comprehensive Plan and City of Yelm Development Guidelines. The applicant shall submitted final utility plans for approval by the City Public Works Department. 10 The applicant shall submit a final stormwater plan for approval by the City Public Works Department. Stormwater facilities shall be designed and constructed in accordance with Thurston County Stormwater Manual and shall include all wells within 200 feet of the site Best Management Practices are required during construction. 11 The applicant shall submit a grading plan for approval by the City Public Works Department. 12 The applicant shall submit a final landscape and irrigation plan to the City Planning Department for approval. An element of the landscape plan shall include a solid wood fence - along the western property line 13 The on-site septic systems shall ,be abandoned in compliance with Thurston County Environmental Health Department. 14 The parking plan shall be modified to prevent cut-through traffic and provide designated pedestrian walkways linking the parking areas and the sidewalks in the public right-of-way to all buildings O' ,.. Mr Mike Edwards July 28, 1997 Page 3 15 All building setbacks shall be from the new right-of-way established after required dedication for frontage improvements 16 The applicant shall submit a structural and aesthetic plan for the proposed retaining wall on the southern end of the site 17 No lots shall be sold or transferred unless the binding site plan and a record of survey map is approved by the City and filed for record in the county auditor's office 18 The applicant shall submit a Businessowners Agreement for approval by the City The Agreement, at a minimum shall contain provisions for the businessowners joint ownership of the on.,.site stormwater facilities and authorize the association toqssess and collect fees for the maintenance and repair of the stormwater facility The Businessowners Agreement shall be recorded in the county auditor's office and referenced on the face of the survey and the binding site plan 19 The applicant ~hallprovide fire hydrant's on.,.site .construction Drawings shall be in compliance with City of Yelm Development.Standards and approved by the City of Yelm Public Works Department. Binding Site Plan Approval is valid for five (5) years from the date of approval (July 21, 1997) The next phase of project development is to ensure all the above conditions of approval are met. Most conditions are subject to the PUblic Works Department review and approval Please contact Ken - Garmann, Public Works Director, at (360) 458-8408 for questions regarding engineered drawings/standards and the department's review and approval process For those conditions that do not involve Public Works review and approval,~the Planning Department will be responsible for verifying the applicants compliance If I can be of further assistance or you have any questions please feel free to contact me at (360) 458-8408 Sincerely, ~C4~ Catherine Carlson City Planner cc: Steve Chamberlain Shelly Badg~r Ken Garmann Jerry Prock