Loading...
8336 kardas letter 041305 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597  April 13, 2005 RB Engineering Mike Kardas PO Box 932 Chehalis, Washington 98532 RE: Yelm Senior Center Additional Requested Information Mr. Kardas: The City of Yelm attended a meeting on April 8, 2005. Those who attended the meeting were Fran Sherrill and Bill Dean of the Senior Center, Dale Wood of W E and B, Gary Carlson, of the City of Yelm and myself. During this meeting we discussed the changes that have been mandated by the addition of a sprinkler system. The City needs to have the following information submitted for review and approval: A site plan showing the addition of the 8” waterline serving the required fire hydrant. The fire hydrant located not more that 50’ from the FDC. Fire Flow calculations showing that this hydrant will produce the required amount of water for the sprinkler. The grease interceptor is going to be field located and sized. You do not need to address the grease interceptor. Also an air vacuum needs to be added to the high point in the line at the bridge crossing. During the design please locate the airvac so as to not discharge into the creek. Please review and revise the plans to address the above referenced comments. You may fax in the changes to expedite the review process. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, Jim Gibson Development Review Engineer cc. enc.