NEPA ChecklistENVIRONMENTAL ASSESSMENT CHECKLIST P. 1
Project Name and Identification No. Yelm Senior Multipurpose Center
1
2
3
4
5
6
7
Impact Categories
No Impact Anticipated
Potentially Beneficial
Potentially Adverse Requires Documentation Only
Potentially Adverse Requires More Study
Needs Mitigation
Requires Project Modification
Source or Documentation (Note date of contract or page reference) Additional material may be attached.
Land Development
Conformance with Comprehensive Plans and Zoning
X
A Senior Center is an allowed use as a Special Use Permit under Yelm Municipal Code 17.66.020
Compatibility and Urban
Impact
X
Restoration of Property and improvement to a modern facility with attractive landscaping will provide buffers to adjoining properties and building plan suits the urban environment.
Slope
X
0 – 3%Slopes on site
Erosion
X
0 – 3% slopes, Best Management Practices will be followed to prevent erosion on site.
Soil Suitability
X
Gravelly Sandy Loam, tested by Able Septic Design.
Hazards and Nuisances, including Site Safety
X
No hazard or nuisances anticipated.
Energy Consumption
X
New building built with energy efficient design.
Noise
Effect of Ambient Noise on Project and Contribution to Community Noise Level
X
Most use is during off peak hours. Senior Center hosts most activities indoors, with minimal traffic.
Air Quality
Effects of Ambient Air Quality on Project and Contribution to Community Pollution Levels
X
No unusual emissions to the air. Low vehicular traffic.
Environmental Design and Historic Values
Visual Quality--Coherence, Diversity, Compatible Use, and Scale
X
New building, similar to normal housing buildings. Site design to meet City of Yelm Development guidelines.
Historic, Cultural, and Archeological Resources
X
Old water tower on-site is not eligible to be on national historic register as per letter from Washington State Office of Community Development dated April 17, 2003
ENVIRONMENTAL ASSESSMENT CHECKLIST P. 2
Project Name and Identification No. Yelm Senior Multipurpose Center
1
2
3
4
5
6
7
Impact Categories
No Impact Anticipated
Potentially Beneficial
Potentially Adverse Requires Documentation Only
Potentially Adverse Requires More Study
Needs Mitigation
Requires Project Modification
Source or Documentation (Note date of contract or page reference) Additional material may be attached.
Socioeconomic
Demographic/Character
Changes
X
Site currently has an abandoned mobile home that will be removed, site improvements per City of Yelm development guidelines.
Displacement
X
Site has been abandoned for sometime. No one will be displaced.
Employment and Income Patterns
X
Senior Center will provide some employment opportunities, and provide opportunity and benefits for low and fixed income seniors.
Community Facilities and Services
Educational Facilities
X
Development will not detract from any existing educational facilities.
Commercial Facilities
X
Development will not detract from any existing commercial facilities.
Health Care
X
Senior center will provide nutritional services to seniors, as well as a place for social and mental stimulation.
Social Services
X
Provides activities for seniors and supplies food and nutritional services.
Solid Waste
X
Refuse pick up provided by Lemay Incorporated. Refuse container to be enclosed per City of Yelm Development Guidelines.
Waste Water
X
Development will connect to City of Yelm sewer service.
Storm Water
X
Stormwater retention and treatment to meet City of Yelm, county and state requirements.
Water Supply
X
Development will connect to City of Yelm water service.
ENVIRONMENTAL ASSESSMENT CHECKLIST P. 3
Project Name and Identification No. Yelm Senior Multipurpose Center
1
2
3
4
5
6
7
Impact Categories
No Impact Anticipated
Potentially Beneficial
Potentially Adverse Requires Documentation Only
Potentially Adverse Requires More Study
Needs Mitigation
Requires Project Modification
Source or Documentation (Note date of contract or page reference) Additional material may be attached.
Community Facilities and Services (Continued)
Public Safety: Police
X
No impact anticipated.
Public Safety: Fire Protection
X
No impact anticipated.
Public Safety: Emergency Medical
X
No impact anticipated.
Open Space
X
Site landscaping will enhance the site. The shoreline jurisdiction area will be left undisturbed to provide open space and protection of the shoreline.
Recreation
X
Senior center will provide recreation activities for seniors.
Cultural Facilities
X
Possible cultural opportunity at center.
Transportation
X
Senior center generates low traffic volumes, and the center provides bus/van service to seniors in the area.
Natural Features
Water Resources
X
The site is located adjacent to Yelm Creek. Development will occur outside the shoreline jurisdiction area. The creek will be left in its natural state.
Surface Water
X
The site is located adjacent to Yelm Creek. Development will occur outside the shoreline jurisdiction area. The creek will be left in its natural state.
Floodplains
X
All development will occur outside of the 100-year floodplain.
Wetlands
X
The site is located adjacent to Yelm Creek. Development will occur outside the shoreline jurisdiction area, and well outside any wetland buffer zones.
Coastal Zone
X
N/A
Unique Natural Features and Agricultural Lands
X
N/A
Vegetation and Wildlife
X
Development area will be landscaped per the City of Yelm Development guidelines. Natural vegetation and wildlife in the shoreline jurisdiction area will be left undisturbed.
Environmental Assessment Checklist P. 4
Project Name and Identification No. Yelm Senior Multipurpose Center
Summary of Findings and Conclusions:
A senior center is an allowed special use in the City of Yelm R-6 zone. The site will be enhanced by improvements and landscaping. Through the special use permit, the senior center
will meet all development guidelines for the City of Yelm.
Summary of Environmental Conditions:
The property is located along Yelm Creek. Construction and development will occur outside the Shoreline jurisdiction, wetland buffer, and 100-year floodplain areas.
Project Modifications and Alternatives Considered:
Project has been modified by reducing the size of driving lanes, and impervious surfaces.
Additional Studies Performed: (Attach study or summary)
No additional studies are required.
Mitigation Measures Needed:
Shoreline and wetland buffers to be left undisturbed during construction. Best management practices and regulations for development to be met during and after construction. Connection
to City water and sewer services required.
Environmental Assessment Checklist P. 5
Project Name and Identification No. Yelm Senior Multipurpose Center
Conclusions:
Is project in compliance with applicable laws and regulations?
(Yes ( No
Is an Environmental Impact Statement Required?
(Yes ( No
Can a Finding of No Significant Impact (FONSI) be made? (Project will not significantly affect the quality of the human environment.)
(Yes ( No
This Environmental Assessment was prepared by:
Name Title
Tami Merriman Assistant Planner
Grant Beck Community Development Director
Date: August 11, 2003
Additional Notes: