Loading...
8331 MDNS SEPA NO: 8331 MITIGATED DETERMINATION OF NONSIGNIFICANCE Proponent: LASCO Bathware Description of Proposal: Modify the third polyester spray station at LASCO’s facility with equipment and storage capacity to enable spray application of polyurethane. Location of the Proposal: 801 NP Road, Yelm, WA 98597 Section/Township/Range: S 19, T 17N, R 2E. Threshold Determination: The City of Yelm as lead agency for this action has determined that this proposal does not have a probable significant adverse impact on the environment. Therefore, an environmental impact statement (EIS) will not be required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. Conditions/Mitigating Measures: SEE ATTACHED Lead agency: City of Yelm Responsible Official: Grant Beck, Community Development Director Date of Issue: Friday, February 21, 2003 Comment Deadline: 5:00 P.M. March 7, 2003 __________________________________ Grant Beck, Community Development Director This Mitigated Determination of NonSignificance is issued pursuant to Washington Administrative Code 197-11-340(2). The City of Yelm will not act on this proposal prior to 5:00 p.m., March 7, 2003. Comments must be submitted to Tami Merriman, Community Development Department at, City of Yelm, 105 Yelm Ave. W., P.O. Box 479, Yelm, WA 98597, by 5:00 p.m., March 7, 2003. You may appeal this determination to the City of Yelm Hearing Examiner, at above address, by submitting a written appeal no later than 5:00 p.m., March 14, 2003. You should be prepared to make specific factual objections. Contact Grant Beck, Community Development Director about the procedures for SEPA appeals. This MDNS is not a permit and does not by itself constitute project approval. The applicant must comply with all applicable requirements of the City of Yelm prior to receiving construction permits which may include but are not limited to the City of Yelm Comprehensive Plan, Zoning Title (17), Critical Areas Ordinance (14.08), Storm water Drainage Design and Erosion Control Manual (DOE), Uniform Building Code, State Environmental Policy Act (SEPA) Title (14), Road Design Standards, Platting and Subdivision Title (16), and the Shoreline Master Program. ----------------------------------------- DO NOT PUBLISH BELOW THIS LINE Published: Nisqually Valley News, Friday, February 21, 2003 Posted in public areas: Friday, February 21, 2003. Copies to: - Dept. of Ecology w/checklist February 19, 2003. All agencies/citizens on SEPA mailing list and adjacent property owners. ATTACHMENT SEPA CASE NO.: 8331 This Mitigated Determination of Non Significance is based on the project as proposed and impacts and mitigation reflected in the following: Environmental Checklist (dated 12/26/02) Draft determination from Olympic Region Clean Air Agency, dated January 27, 2003 And the following conditions: The applicant shall provide to the City of Yelm, verification from the Olympic Region Clean Air Agency, that emissions into the air from this project are acceptable. The applicant shall provide to the City of Yelm, a Hazardous Spill Containment Plan approved by Thurston County.