Loading...
04-0180 Punchlist School Response 080607~~ ~ ... Ezpanded Features 1io ppF Unlimited Pages Complete ~ ~ FEX: 360.958.6439 ~ Y~jt~I~~~~ 360.958.6128 O 901 CePass Fve. NW Exuxtrc Bxaraann PC Box. 475 FacILIIIes & CAeITAl Pnoaecros YElcy WP_ 98597-0c76 COMM ~~~ ~~ ~~ DIRECT00. eb1[klan l@ycs.wednen etlo August 8, 2007 Mr. Grant Beck Community Development Director City of Yelm PO Box 479 Yelm, WA 98597 RE: Ridgeline Middle and Yelm High Schools Punch lists, dated May 31, 2007 Dear Mr. Beck: Ridgeline Junior High School: Water Systems: 1. The water valve cover at the Carter St. entrance has been replaced with the correct cover; 2. The valve box at 5+82.89 is to be cleaned this week; 3. The valve box at 7+17,05 has been cleaned; 4. The hydrant at 3.00 to be raised; The hydrant nearest the domestic water meter has been raised; 5. The bollards at 13+12.45 have been installed; 6. The bollards have been installed around the air release; 7. A retaining wall and pad is complete at Millpond. Fencing will be installed within the next two weeks; 8. The Reduced Pressure BackFlow Assembly has been installed at Mill Pond Elementary; 9. The electrical connection to the backtlow assembly hot box will be installed in conjunction with the electrical connection to the adjacent portable classroom. Sewer System: 1. The STEP sewer system electrical breaker has been labeled: (Waiting confrmation from contractor) 2. The gravity manhole has been vacuum tested; (waiting confirmation from contractor) 3. Ground Water wells (pyzometers) have not been installed. We are unable to fnd any correspondence requiring these devices. We did however locate a letter, from the City of Yelm, dated December 16, 2005 rejecting the use of the pyzometers; 4. The electrical installation has been inspected and approved by the State Electrical inspector. The use of common raceway for low voltage and line voltage is prohibited by NEC. I believe that the system was installed with separate raceway and the issue of combined use of the raceway was at the electrical and control panels only; 5. The pumps in the STEP tanks have been replaced; (Waiting confirmation from contractor) 6. The floats have been reconfigured to operate as specifed. (waiting confrmation from contractor) 7. The alternating pump control has keen wired correctly; (waiting confrmation from contactor) 8. Wiring in the junction boxes nett to the risers has been installed per NEC; (waiting confirmation from contractor) YHLN CO[NNLFITY SCHOOL- IS AN EQUAL 0['PORTJNI TY EMPLOYER P.ND FOLLC/AS TITSE I% REQOIREME9TS Expanded features /ppF Unlimited Pages Complete General Comments: 1. The storm pond and swales are under construction and will be cleaned with the completion of the constmclion; 2. The storm pond is part of the football, baseball and track constmclion and will be completed with the completion of construction; 3. The landscaping and fencing on the southeast property lines are part of the football, baseball and track construction and will be completed with the completion of construction; 4. Neither a maintenance drive nor sidewalks are part of this contract. The work described was part of an alternate bid which was rejected; 5. It is unclear as to what is required in the request for cleaning of the planter strip along the southeast fencing and the homes on 10P"; 6. See number 2 above; 7. The northeast property line is hydro-seeded; 8. The wooden fence at the entrance to the site from Carter St. has been replaced; 9. The fence along the Hawks Landing Subdivision is constructed on the district property and installed horizontal to the earth. The fence is constructed as a visual buffer between the district property and the homes in Hawks Landing. It does not appear as if the gaps below the fence affect the visual buffer between the school and the homes. Specifcally which lots have construction debris remaining on their property associated with the school construction? 10. The parking lot stripping will be corrected per the drawings, (waiting schedule from contractor) 11. The design for improvements to SR 507 has not been approved by WSDOT as of the date of this letter. It is expected that an approval of the Improvements will 6e received by the end of August 2007. Construction advertisements and bidding can not be expected to be completed prior to the end of September 2007- There remains a possibility that construction of the Improvements will not be completed this calendar year- Documentation Does the city have templates to use for the frontage improvement deferrals, the dedication of sewer and water lines, the easements for sewer and water systems and the storm water maintenance agreements? If they are available would you forward them to the district? Construction as-builts are in review. Is the city requesting a copy of all or specifc as-bunts? Please indicate which as-builts, by discipline, you are requesting. Ezpantled Features ~PDF Unlimited Pages Complete Yelm High School: Sewer System: 1. Inlet Baines have been installed in tanks A and B; (Waiting confirmation tram the contractor) 2 See#1: 3. Float positions have been corrected, (waiting conf rmation from contractor) 4. Wiring corrections have been completed, (waiting confirmation from contractor) 5. Service disconnects are lockable; (waiting confirmation from contractor) 6. Fusing for tanks A and B has been corrected; (waiting confirmation from contractor) 7. Main line gate valves have concrete pads and traffc bearing rings have been installed; (waiting confirmation from contractor) 8. Clean-out cap Is marked in parking adjacent to Auto Shop; (waiting confirmation from contractor) 9. The tank at the 400 building is to tie replaced per city direction. The toning wire will be installed per the new tank design; 10. See # 9; Waiting for review and approval from City of Yelm of resubmitted design 11. The lank serving buildings 300 and 500 is not in a traffic area. Gates have been installed to prevent vehicles from entering this area. General Comments. Landscaping at 93"' ave. entrance and north boundary is under review. Resolution is expected within the next two weeks; Relocated portables were reconnected to the water and sewer. Connection diagrams will be submitted within next two weeks; The sidewalks have hvncated domes; The old Yelm High School sign to be removed within next two weeks; The storm Swale along SR 510 has been cleaned, The ADA parking stall to be repainted. Documentation: Does the city have templates to use for the frontage improvement deferrals, the dedication of sewer and water lines, the easements for sewer and water systems and the storm water maintenance agreement? If they are available would you forward them to the district? Regards, Erling Birkland Director of Facilities and Construction Yelm Community Schools Expanded Features ~PDF llnlimitedPages Complete Cc: Alan Burke, YCS, Superintendent Shelly Badger, City of Yelm, Administrator Stan Zelinski, Erickson McGovern, A&E Bob Tauscher, JWM&A, Civil Engineers Ray Mow, Erickson McGovern, A&E