August 8, 2007
Mr. Grant Beck
Community Development Director
City of Yelm
PO Box 479
Yelm, WA 98597
RE: Ridgeline Middle and Yelm High Schools
Punch lists, dated May 31, 2007
Dear Mr. Beck:
Ridgeline Junior High School:
Water Systems:
1. The water valve cover at the Carter St. entrance has been replaced with the correct cover;
2. The valve box at 5+82.89 is to be cleaned this week;
3. The valve box at 7+17,05 has been cleaned;
4. The hydrant at 3.00 to be raised; The hydrant nearest the domestic water meter has been raised;
5. The bollards at 13+12.45 have been installed;
6. The bollards have been installed around the air release;
7. A retaining wall and pad is complete at Millpond. Fencing will be installed within the next two weeks;
8. The Reduced Pressure BackFlow Assembly has been installed at Mill Pond Elementary;
9. The electrical connection to the backtlow assembly hot box will be installed in conjunction with the
electrical connection to the adjacent portable classroom.
Sewer System:
1. The STEP sewer system electrical breaker has been labeled: (Waiting confrmation from contractor)
2. The gravity manhole has been vacuum tested; (waiting confirmation from contractor)
3. Ground Water wells (pyzometers) have not been installed. We are unable to fnd any correspondence
requiring these devices. We did however locate a letter, from the City of Yelm, dated December 16,
2005 rejecting the use of the pyzometers;
4. The electrical installation has been inspected and approved by the State Electrical inspector. The use of
common raceway for low voltage and line voltage is prohibited by NEC. I believe that the system was
installed with separate raceway and the issue of combined use of the raceway was at the electrical and
control panels only;
5. The pumps in the STEP tanks have been replaced; (Waiting confirmation from contractor)
6. The floats have been reconfigured to operate as specifed. (waiting confrmation from contractor)
7. The alternating pump control has keen wired correctly; (waiting confrmation from contactor)
8. Wiring in the junction boxes nett to the risers has been installed per NEC; (waiting confirmation from
contractor)
YHLN CO[NNLFITY SCHOOL- IS AN EQUAL 0['PORTJNI TY EMPLOYER P.ND FOLLC/AS TITSE I% REQOIREME9TS
Expanded features
/ppF Unlimited Pages
Complete
General Comments:
1. The storm pond and swales are under construction and will be cleaned with the completion of the
constmclion;
2. The storm pond is part of the football, baseball and track constmclion and will be completed with the
completion of construction;
3. The landscaping and fencing on the southeast property lines are part of the football, baseball and track
construction and will be completed with the completion of construction;
4. Neither a maintenance drive nor sidewalks are part of this contract. The work described was part of an
alternate bid which was rejected;
5. It is unclear as to what is required in the request for cleaning of the planter strip along the southeast
fencing and the homes on 10P";
6. See number 2 above;
7. The northeast property line is hydro-seeded;
8. The wooden fence at the entrance to the site from Carter St. has been replaced;
9. The fence along the Hawks Landing Subdivision is constructed on the district property and installed
horizontal to the earth. The fence is constructed as a visual buffer between the district property and the
homes in Hawks Landing. It does not appear as if the gaps below the fence affect the visual buffer
between the school and the homes. Specifcally which lots have construction debris remaining on their
property associated with the school construction?
10. The parking lot stripping will be corrected per the drawings, (waiting schedule from contractor)
11. The design for improvements to SR 507 has not been approved by WSDOT as of the date of this letter.
It is expected that an approval of the Improvements will 6e received by the end of August 2007.
Construction advertisements and bidding can not be expected to be completed prior to the end of
September 2007- There remains a possibility that construction of the Improvements will not be
completed this calendar year-
Documentation
Does the city have templates to use for the frontage improvement deferrals, the dedication of sewer and
water lines, the easements for sewer and water systems and the storm water maintenance agreements? If
they are available would you forward them to the district?
Construction as-builts are in review. Is the city requesting a copy of all or specifc as-bunts? Please indicate
which as-builts, by discipline, you are requesting.
Ezpantled Features
~PDF Unlimited Pages
Complete
Yelm High School:
Sewer System:
1. Inlet Baines have been installed in tanks A and B; (Waiting confirmation tram the contractor)
2 See#1:
3. Float positions have been corrected, (waiting conf rmation from contractor)
4. Wiring corrections have been completed, (waiting confirmation from contractor)
5. Service disconnects are lockable; (waiting confirmation from contractor)
6. Fusing for tanks A and B has been corrected; (waiting confirmation from contractor)
7. Main line gate valves have concrete pads and traffc bearing rings have been installed; (waiting
confirmation from contractor)
8. Clean-out cap Is marked in parking adjacent to Auto Shop; (waiting confirmation from contractor)
9. The tank at the 400 building is to tie replaced per city direction. The toning wire will be installed per the
new tank design;
10. See # 9; Waiting for review and approval from City of Yelm of resubmitted design
11. The lank serving buildings 300 and 500 is not in a traffic area. Gates have been installed to prevent
vehicles from entering this area.
General Comments.
Landscaping at 93"' ave. entrance and north boundary is under review. Resolution is expected within
the next two weeks;
Relocated portables were reconnected to the water and sewer. Connection diagrams will be submitted
within next two weeks;
The sidewalks have hvncated domes;
The old Yelm High School sign to be removed within next two weeks;
The storm Swale along SR 510 has been cleaned,
The ADA parking stall to be repainted.
Documentation:
Does the city have templates to use for the frontage improvement deferrals, the dedication of sewer and
water lines, the easements for sewer and water systems and the storm water maintenance agreement? If
they are available would you forward them to the district?
Regards,
Erling Birkland
Director of Facilities and Construction
Yelm Community Schools
Expanded Features
~PDF llnlimitedPages
Complete
Cc: Alan Burke, YCS, Superintendent
Shelly Badger, City of Yelm, Administrator
Stan Zelinski, Erickson McGovern, A&E
Bob Tauscher, JWM&A, Civil Engineers
Ray Mow, Erickson McGovern, A&E