Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
eru caluclations
Daily Usage (gpd/student) Annual Usage (gpd/student) Average Daily Usage (gpd/student) Existing Design Capacity (students) Design Capcity (students) Additional Daily Water Usage (gpd) Additional Water ERU Water Connection Fee Sewer Usage (gpd) Sewer ERU Pre-purchased Sewer ERU's Additional Sewer ERU Sewer Connection Fee 14.4704992435703 2604.68986384266 7.13613661326757 932 1325 2804.50168901416 11 16500 9455.38101257953 39 25 14 73766 Average from submitted by District Daily Usage * 180 school days Annual usage / 365 days Additional students * average daily usage Rounded down Design capacity *average daily usage Rounded down Gym and Building C Grandstand Auto Shop New Building Total 7.4805195 0.1336806 Total 2 years Total gallons Total gpd Total gpd/student 375 300 37 610 1322 240 962.50032 11520 12140 11370 13010 13570 0 19400 0 12280 0 33500 12790 8960 12680 10090 10380 9940 11880 3300 3010 11210 14400 16780 14910 267120 1998196.36884 5550.545469 6.74428368043742 16 10 10 16 14.4704992435703 224.415585 900 6000 3000 370 9760 19130 4.82349974785678 2000 1000 123.333333333333 3253.33333333333 6376.66666666667