FAX TRANSMISSION SHEET
TO: Mr. Erling Bvkland
Facilities Operations
Yelm Community Schools
PO Box 476
Yelm, WA 98597
FAX No.: 458-6434
JOB NO. 03143
DATE; April 14, 2004
Mr. John Erickson, Architect
Erickson McGovern
120131" Street S.
Tacoma, WA 98444-4804
253-531-9197
SUBJECT: Yelm Community Schools, Yehn High School
City of Yelm SEPA Mitigation Requirements Cost Estimate
We are transmitting a total of3 pages (including this page).
)f you do not receive allpf the pages, please contact us at (360) 352-9456.
Thank you.
p,
• (360) 352-9990
Attached is [he cost esthnate you requested for the mitigation items the City of Yelm is
requiring. The estimate is based on the information I have and the assumption I made with each
mitigated item. I have indicated the assumptions for each, if any, concenung roadway lengths,
storm requirement and unknowns. Should you have any questions or require additional
information, please contact me at (360) 352-9456.
Very truly yours;
Jerome W. Morrisaette & Associates I//n~~c., P.B.
SIGNED: ~ o Q,-E/o
Robert Tauscher, P.E.
Project Engineer
C;~Bob'ePilesWJ143 Yom High School Sia lmprovemenUGO,reapondence~A41404 Pox Yelm School aM.DOC
Civil + Municipal * Geotechnical Engineering and Planning
Mor.ia. ~u~4 ~:us,•vi
41r
h~c.isua N. t
CITY OF YFI.M SEPA MITIGATION REQQIRL~MENTS
HIGH SCHOOL ITEM QUANTITY UN)T COST TOTAL
COST
Hatf skeet improvements to fhe Urban Arterial Ballast - Tc¢ 38 0 530.0 0 511,400.00
Standard along doe High School SR 510 frontage CSTC -Ton 140 845.00 E6 700.00
(Using 600 LF of Roadway and matching storm with ACP -Ton
Li hdn •LS
east end of town and matching ACP depth, assuming Curb/OutMS - LP 400
I
600 595.00
55,000,00
525.00 538 000.00
55,000.0
$75 000.00
6 inOheS) Sidcwelk-SY 340 530.00 $10200.00
Stri in -LS 1 $5,000.00 $5,000.00
LaMSCa -LS I 510.000.00 $]0,000.00
Gradm -LS 1 510,000.00 5!0,000,00
$txdin -LS 1 54,000.00 §4,000.00
Stetm Drains-IS t 510,000.00 510000.00
Traffic Control -IS 1 $8,000.00 58 000.00
Mobilimoon-LS 1 510,000.00 $10000.00
Total 5142,900.00
A two way left turn on west bound SR 510 at 93rd Ballast • Ton 70 525.00 51,750.00
(Using 250 LF of Roadway and matching storm with
existing) CSTC -Ton
ACP-Ton zs
35 sas.oo
5120.00 Sl,lzs o0
54,200.00
Stri in • LS 1 $5,000.00 55,000.00
Oradin -LS 1 $10000.00 510,000.00
Secdin -LS 1 54,000.00 54000.00
Storm Drains-LS 1 $5,000.00 55000.00
Traffic Control -!.S 1 54000.00 54,000.00
Mobilization-LS 1 $3,500.00 53,500.00
Total 538 575.00
NEW dUNTOR HIGH SCHOOL ITEM QUANTITY UNIT COST TOTAL
COST
Tho connection of ]07th and Cattar Street as a Ballad • Tan
public street (Using 1200 LF of roadway, since it i& CSTC -Ton
a new roadway installing storm to meet current ACP -Ton 550
200
275 575.00
_ 540.00
$90.00 E 13 750.00
$8,000.00
524,750.00
Wds) Lt nn -LS
9CMd I $1p,000.00 55,000.00
t
Curti/QUtter - LP 2400 §22.00 552 800.00
Sidewalk-SY ]400 $25.00 535000.00
Sni in -L§ 1 510000.00 510000.00
Landm c-LS 1 515.000.00 $15,000.00
oradin - Ls I s2s 000.00 $zs 000.00
Secdin -LS 1 38000.00 58,000.00
Storm Drains-LS 1 $60,000.00 560,000.00
Mobilimtion-LS 1 S2E 000.00 $25000.00
T¢ta] $282300.00
A 250 foot dedicated left tum lane on southbound
SR 507 at Carter Street (the developer of Hawks Ballast • To¢
C57-C -Ton 70
25 $25.00
$45.00 St,7so.oo
51,125.00
Landing i6 required t0 cOrISUUCt a 1 OO foot dedicated
left ttun Zane at this locatio
th
di
l ACP - To, n _
S¢i:in -LS 70
I $120.00
55.000.00 $8 400.00
$5,000.00
n,
e
strict wou
d
d i O~ia - LS 1 $10,000.00 510 000.00
exten
t 150 additional feet) ([Hatching existing Sccdi¢ - LS 1 54,000.00 $4,000.00
storm and matching ACP depth, assuming b inch) Storm Drams - IS 1 55,000.00 55,000.00
Tmffc Control - LS 1 54,000.00 E4 000.00
Mobilization • LS I 53.500.00 E3 500.00
Total 542 775.00
Aj
U~~
a/
r~'
~~
dor~IC~ 20J4 3:U9PM JWNI&A
Na.~..yp~ ., ~
CITY OF YELM SEPA MITIGATION REQUIREMENTS
Half streetimprovements to the Neighborhood Ballast-Ton t60 $30.00 $a,80o.00
Collec[OY Standard along Mill Read (Using 6601-F LTG' Ton tS0 $45.00 S6 750.00
of roadway and matchin
storm with existin Ate' -Ton 2zo ass oo $20 900.00
g
g
d Li htin -LS 1 $5,000.00 55,000.00
roa
way) Curb/Gutkr-LF 600 E25,00 515,000.00
Sidewalk-SY 380 $30.0 $11,400.00
Stn mg • IS 1 85,000.00 $5,000.00
Isndsca • LS t SIO 000.00 410 000.00
Gr&lin -LS 1 410,000.00 $10000.00
Seedin •LS I 54000.00 54000.00
stone Dreina-L5 t $lo,oao.oa slo,ooo.oo
'l7effic Control - LS 1 SB 000.00 $8,000.00
Mo6ili¢atian-LS l $10000.00 $10000.00
Total $1[0,850.00
Raviow of the traffic at Mill Street with and without 'trehic sma I ss ooo.oo ss ooo.oo
the connection of Carter/107th to determine if the
realignment of the imasection is warranted (Will
requiro a scoping meeting tc understand what they
want)
atal
5,000.00
OFF SITE 1MPROVEM)rNT5 ITEM QUANTITY UNIT COST TOTAL
cosy
Restripe SRS ] 0 west of the intersection of SR Sari in - LS 7 55 000.00 S5 000.00
507/Sr510 (Yelm Avenue and First Street) es[end
the center turn lane to Fdwazds Street with a
dedicated left rum [o at least Railroad Avenue.
Total
55,000.00
Grand Total All Min anon uiremerts E627,40000