Loading...
FW Updated Ridgeline Punch ListIPM.Note FW: Updated Ridgeline Punch List FW: Steve Harrington Jim Gibson Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON Updated Ridgeline Punch List EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON Steve Harrington Updated Ridgeline Punch List For your Ridgeline list. Jim Gibson P.E. City of Yelm, Development Review Engineer PO Box 479 Yelm,WA. 98597 Ph. 360.458.8438 Fx. 360.458.3144 <mailto:jimg@ci.yelm.wa.us> jimg@ci.yelm.wa.us _____ From: Jon Yanasak Sent: Wednesday, November 21, 2007 9:09 AM To: Jim Gibson Cc: Tim Peterson Subject: Updated Ridgeline Punch List Jim/Tim, This is our latest updated punch list for Ridgeline. Roland (Wood & Son) is stopping by my office today to pick up a copy to deliver to Jody Miller Const. However, it might be prudent if CDD also sent a copy to the School Dist. Thanks, Jon Yanasak City of Yelm Sewer Dept. Mgr Po Box 479 Yelm Wa 98597 Phone 360-458-8411 Fax 360-458-8166 jony@ci.yelm.wa.us <DC90029353CCCD468AA2A2858FFCD8F54F330D@server1.ci.yelm.wa.us> FW%3A Updated Ridgeline Punch List.EML Jim Gibson Jim Gibson 11.0 Ridgeline School updated Punchlist November 21, 2007 Ridgeline School updated Punchlist November 21, 2007 Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh 458-8423 Community Development Steve Harrington Steve Harrington steveh Ridgeline School updated Punchlist November 21, 2007.doc CITY OF YELM SEWER DEPARTMENT November 21, 2007 Re: Updated Punch list Ridgeline School The #1 pump was operating 7 days per week and 24 hours per day and now has 6975 hours of operation. This pump and motor must be replaced. All “2 wire” splices must be connected with ‘Heat shrink’ Butt Connectors. All multi-wire connections (more than 2 wires) must be connected with water proof wire nuts. Some of the existing ‘Heat Shrink’ butt connectors are punctured and must be replaced. There are currently 4 ‘on-off’ floats operating 3 pumps. This is not wired correctly and must be re-wired. .doc Ridgeline School updated Punchlist November 21, 2007.doc Ridgeline School updated Punchlist November 21, 2007.doc