Loading...
Follow up on Ridgeline punchlist comments for CDD walk thruIPM.Note Follow up on Ridgeline punchlist comments for CDD walk thru Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Follow up on Ridgeline punchlist comments for CDD walk thru Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jim Gibson Grant Beck Follow up on Ridgeline punchlist comments for CDD walk thru 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server Grant: Jim asked me to give you more detail on what I had discovered on the parking lot striping for Ridgeline Middle School. When out in the field with Nisha, we measured the compact stalls (they are correct) along with adjacent stalls and found some odd ball sizes (see attachment). The compact stalls were put in correctly, per plans. There are 20 parking stalls not put in correctly per plans. They are the wrong size. I scaled these and compared them to field measurements. If you have any further questions I will explain it to you or show you on the plans. Thank you, Steve Harrington Engineering / Civil Inspector City of Yelm Office (360) 458-8423 / Field (360) 561-4264 <DC90029353CCCD468AA2A2858FFCD8F528FA26@server1.ci.yelm.wa.us> Follow up on Ridgeline punchlist comments for CDD walk thru.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh Ridgeline Middle School Walk Thru November 1 Ridgeline Middle School Walk Thru November 1 Grant Beck EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Grant grantb@ci.yelm.wa.us Grant Beck 458-8408 Community Development Grant Beck Grant Beck Grant Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson jimg@ci.yelm.wa.us jimg 458-8438 Community Development Jim Gibson Jim Gibson Gibson Ridgeline Middle School Walk Thru November 1.doc Ridgeline Middle School Walk Thru November 1, 2007 Grant:  Nisha and I went out to Ridgeline Middle School to check the 2 items from our department on the punchlist.  They have not completed these two punchlist items per plans.  There are callouts on these items that appear to refer to the wrong drawing sheets for details.  These two items that remain to be completed are as follows: Maintenance Driveway Entrance to South Ball Fields from Parking Lot is not complete. Explanation: Maintenance Road Plan is on sheet C 1.5 not sheet C 2.14 Parking Lot Striping is not per plans, they are not per scale and do not match. Explanation: Drawing Plan Sheet C 4.0 calls for a quantity of 20 parking stalls measuring 9’ wide x 20’ long. These 20 stalls have been striped correctly. They measure 9’ wide x 18’ long (not per plan). There is a note referring to striping detail (C 2.10) there is no detail (C 2.10) however there is a striping detail (4-24) on sheet C 1.5 Sheet C 1.2 gives the layout for the parking lot striping. Parking lot stalls are not sized per plan. .doc RIDGEL~1.DOC Ridgeline Middle School Walk Thru November 1.doc