Follow up on Ridgeline punchlist comments for CDD walk thruIPM.Note
Follow up on Ridgeline punchlist comments for CDD walk thru
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Follow up on Ridgeline punchlist comments for CDD walk thru
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Jim Gibson
Grant Beck
Follow up on Ridgeline punchlist comments for CDD walk thru
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
Grant: Jim asked me to give you more detail on what I had discovered on the parking lot striping for Ridgeline Middle School. When out in the field with Nisha, we measured the compact
stalls (they are correct) along with adjacent stalls and found some odd ball sizes (see attachment). The compact stalls were put in correctly, per plans. There are 20 parking stalls
not put in correctly per plans. They are the wrong size. I scaled these and compared them to field measurements. If you have any further questions I will explain it to you or show
you on the plans.
Thank you,
Steve Harrington
Engineering / Civil Inspector
City of Yelm
Office (360) 458-8423 / Field (360) 561-4264
<DC90029353CCCD468AA2A2858FFCD8F528FA26@server1.ci.yelm.wa.us>
Follow up on Ridgeline punchlist comments for CDD walk thru.EML
Steve Harrington
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh
Ridgeline Middle School Walk Thru November 1
Ridgeline Middle School Walk Thru November 1
Grant Beck
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Grant
grantb@ci.yelm.wa.us
Grant Beck
458-8408
Community Development
Grant Beck
Grant Beck
Grant
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
458-8438
Community Development
Jim Gibson
Jim Gibson
Gibson
Ridgeline Middle School Walk Thru November 1.doc
Ridgeline Middle School Walk Thru November 1, 2007
Grant: Nisha and I went out to Ridgeline Middle School to check the 2 items from our department on the punchlist. They have not completed these two punchlist items per plans. There
are callouts on these items that appear to refer to the wrong drawing sheets for details. These two items that remain to be completed are as follows:
Maintenance Driveway Entrance to South Ball Fields from Parking Lot is not complete.
Explanation: Maintenance Road Plan is on sheet C 1.5 not sheet C 2.14
Parking Lot Striping is not per plans, they are not per scale and do not match.
Explanation: Drawing Plan Sheet C 4.0 calls for a quantity of 20 parking stalls measuring 9’ wide x 20’ long. These 20 stalls have been striped correctly. They measure 9’ wide x 18’
long (not per plan). There is a note referring to striping detail (C 2.10) there is no detail (C 2.10) however there is a striping detail (4-24) on sheet C 1.5
Sheet C 1.2 gives the layout for the parking lot striping. Parking lot stalls are not sized per plan.
.doc