I wanted to follow up with a few items that we need to get taken care of tomorrow.
1. Take a minute to explain to Grant what you and Nisha observed during the inspection at Ridgeline and what you reviewed for the parking stall issues.
2. Contact Creek Street Plaza to repair the temporary patching that is on Creek Street. This is a request from Public Works.
3. McCammant Review is on my desk signed. However I need you to verify that Irrigation comments No. 1 and 2 are correct. Review No 4 told them to submit 8 sets of irrigation plans
for review and approval. I did not get any comments on the irrigation and it does not look like Roberta scanned any irrigation plans. If we do not have any irrigation plans than the
comments stand and you can send out the letter. If we do have them, then did anyone review them and are there additional comments. Please explain to the owner why we are going through
another review due to his engineer’s incomplete submittal. In an effort to get this project done I will consider approving the civil plans separate from the irrigation plans. If they
want to do this then they could have the plans approved with the other comments addressed. Let them know that.
4. The inbox has 4 projects in it. Yelm Commercial, Applebee’s, Forrester Estates Booster Pump and Cullen’s Subdivision.
We need to get them checked and routed to Roberta for routing out to departments. This has been taking far too long. If they sit for days in the
box than I get questioned why the review is taking so long.
The booster station plans need to be routed to:
Mike Ollivant at Parametrix (1 set)
Water Department (1 set)
Jim Gibson (1 set)
Tim Peterson (1 set)
5. Please try to complete the project reviews and get comments to Roberta.
6. Inspect the projects if needed.
Please start at the top of the list and work down. I have listed them in order of importance.
Jim Gibson P.E.
City of Yelm, Development Review Engineer
PO Box 479 Yelm,WA. 98597
Ph. 360.458.8438 Fx. 360.458.3144
<mailto:jimg@ci.yelm.wa.us> jimg@ci.yelm.wa.us
<DC90029353CCCD468AA2A2858FFCD8F549002B@server1.ci.yelm.wa.us>
Item to follow up on Friday..EML
Jim Gibson
Jim Gibson
11.0
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
steveh
Steve Harrington
SMTP
steveh@ci.yelm.wa.us
Steve Harrington
Steveh