Loading...
Punch list for Yelm High School and Ridgeline SchoolIPM.Note Punch list for Yelm High School and Ridgeline School Steve Harrington Jim Doty Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JIMD Punch list for Yelm High School and Ridgeline School EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jim Doty EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JIMD Jim Gibson; Jon Yanasak; Steve Harrington; Tim Peterson Punch list for Yelm High School and Ridgeline School 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=jimdMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=jimdMicrosoft Exchange Server Gentlemen: Please find attached the Punchlist created and updated by Randy Hatch for Ridgeline and Yelm High Schools. Jim Doty Operator City of Yelm Water Reclamation Facility 931 N.P. Road P.O. Box 479 Yelm, WA 98597 Ph. (360)458-8411 Fax. (360)458-8166 <DC90029353CCCD468AA2A2858FFCD8F5362F0B@server1.ci.yelm.wa.us> Punch list for Yelm High School and Ridgeline School.EML Jim Doty Jim Doty 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=jimd Yelm High School punch list Aug30-2007 Yelm High School punch list Aug30-2007 Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson jimg@ci.yelm.wa.us jimg 458-8438 Community Development Jim Gibson Jim Gibson Jon Yanasak EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Jony jony@ci.yelm.wa.us jony 458-8411 Public Works Jon Yanasak Jon Yanasak Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh 458-8423 Community Development Steve Harrington Steve Harrington Tim Peterson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim tim@ci.yelm.wa.us tim 458-8499 Public Works Tim Peterson Tim Peterson Yelm High School punch list Aug30-2007.doc City of Yelm Sewer Department 08/3/06 Re: Punch list Yelm High School and Ridgeline School Yelm High School These items apply to both Tank A and Tank B The wire connections within the J box in the vaults need to be made up with heat shrink connectors and melted completely The service disconnects need to have 1 additional fuse installed to separate the 3 circuits (2 pump and 1 control circuit) 1500 gal STEP tank for Auto Shop at High School A punctured butt connector needs to be replaced in the “J” box in the riser A wire nut was used to “make up” the connections in the “J” box in the riser. Only heat shrink butt connectors are allowed. The remote disconnect switch must be drilled to allow placement of a city padlock when the switch is in the “on” position. the explosion proof “J” box used for the pump wires within the the pump vault of the tank, has wire connections “made up”with wire nuts. These wire nuts need to be replaced with heat shrink butt connectors. Other High School issues: The Sewer department is still waiting to hear about the new tank for bldg 400. The 10,000 gallon tank serving bldg.s 300 and 500 had ecology blocks located around the tank lids to prevent vehicles from driving on the lids for the final inspection. These ecology blocks have since been removed and there is now a broken lid at that location. It is the position of the Yelm Sewer Department that a permanent, non-removable barrier (such as Bollards, Ecology blocks clearly did not work) must be placed around the tank and lids to prevent vehicles from driving on, or parking on the tank or lids. (non-traffic bearing tank and lids.) The broken lid must also be replaced and any other consequential damage repaired. Ridgeline: Need heat shrink butt connectors in all “J” boxes Floats are not functioning properly Electrical contractor has an issue with having more than 2 wires in a splice and there is not enough terminals in pump control panel for all of the wires needed to do separate splices. The bottom line of this issue is that if the electrical contractor cannot connect the electrical controls for the tank per the Yelm standards then the tank cannot be finalled. The Man Holes have not been vacuum tested. Ground water test wells have not been installed. As- Built drawings for all STEP installations need to be supplied to the Sewer Department. 2of 2 Yelm High School punch list Aug30-2007.doc .doc YELMHI~4.DOC Yelm High School punch list Aug30-2007.doc