Loading...
03-8362 Review Letter No 1 073007 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   July 30, 2007 Jerome Morrissette and Assoc. Inc. Bob Tauscher 1700 Cooper Pt. Road SW #B-2 Olympia, WA 98502 RE: Yelm High School Addition Step Tank Replacement - Review No. 1 City of Yelm Project No. SPR-03-8362-YL Dear Mr. Tauscher: The following comments are from the step tank replacement plans that you submitted on July 9, 2007. The following comments need to be addressed on the plans before the next submittal. The Pump Control Panel shall be mounted on “Uni-Strut” supports rather than a 4”X8” pressure treated post. A hose bib must be provided within 50 feet for maintenance of this tank. This installation is going to require new pumps and motors. The existing pumps have been running for over 1 year and should be replaced even though the hour meters show less then one hour. It appears that the hour meters have been bypassed. This system is required to have 4 floats instead of the 3 that are shown on the plans. Step tank note No 5 should indicate “Orenco PVU 84 18-19”, not “PVU 72 18-19” as shown and the “Biotube” shall be 84” long. If you have any questions or concerns please do not hesitate to call me at 360-458-8438 or contact me by email at jimg@ci.yelm.wa.us. Respectfully Community Development Department Jim Gibson Development Review Engineer Cc: Tim Peterson Jon Yanasak Grant Beck