Loading...
Response To Comments,w~w~A Jerome W. Morrissette & Associates Inc., P.S. 1700 Cooper Point Road SW, #B-2, Olympia, WA 98502-1110 (360)352-.9456 ! FAX (360)352-9990 July 31, 2007 Mr. Jim Gibson, PE Development Review Engineer City of Yelm P.O. Box 479 Yelm, WA 98597 Re: Yelm IIigh School Building 400 STEP Tank Replacement -Review No. 1, City of Yelm Project No. SPR-03=8362-YL Dear Mr. Gibson: R~CE~ ~~ A~tS ~-~ ?Op7 Thank you for your review letter dated July 30, 2007. Please find attached 4 copies of revised plans. We have revised the plans in accord with your letter as follows: 1. The detail for mounting the pump control panel now calls for "Uni-Strut" supports. 2. We have checked and found that an existing wall. mounted hose bib is located within 50 feet of the tank. The location of tliis hose bib is now noted on the plans. 3. The plans. now call for the installation of new pumps rather than reinstallation of the existing pumps. 4. The plans have been revised to now show 4-float switches. 5. STEP tank note no. 5 now lists an Orenco PVU 84 18 19 pump vault. Should you have any questions or comments, please do not hesitate to contact me (Doua(a?JWMorrissette.com) or Bob Tauseher (Bob ccJWNlorrissette.com) Very truly yours Jerome W. Morrissette & Associates Inc., P.S. Doug Eklund, P.E. Senior Project Engineer Cc: Mr. Erling Birkland; Yehn Community Schools: attachments