Loading...
20080017 Permit Pkg 020808~- ~- W Q ~~/ 'a1 LL v a O ~ ~ O z ~ ~ U_ M~ ~L W I"- ~ (,~ J J ~ a LL ~ O W H ~ V ~W~// LL C z c a W .n C fA Z (n }~ L Q ~~ a ~ z¢ ~ _ ~ ~ ~ ~ ~ ~ ~ C ~ CC C m Q ~ m 0 ° ~ C U ~- ~j O c ~ ~ ~ (6 ~ 'D ¢ ~ m ~~ ~~ aN =Q U__ ~ U C U °°o U cV (U ~ ~ ~ O ~, ~U~ ~~ ~ .__ ~~ ~m~ ~~ `° ~ a`~~U ~o~ ~ ~~ L ,C +~' O L N ~ ~' ~ .3~-v co U ~ ~ ~ ~ N .Q ~ ~ T of ~ ~ U Q ~ .~ .a N 'N ° U ~ ~ o ~~ i¢U N N ~ L ~ T ~~ ~:; T :_. ~~" ~•__ '; ~~~ 5 ~ ~ f '. I~~Yn.~v i r,[ bt~ ~ ~~ "~g~`' P £~~,~.~,:3 City of Yelm Community Development Department Building Division Phone: (360) 458-8407 Fax: (360) 458-3144 Applicant: Name: Sound Built Homes, Inc. Address: P.O. Box 73790 Property Information: Site Address: 9122 Paradise View St. SE Assessor Parcel No. 63540008600 COntraG#Or InfOrm~~On: Name: Sound Built Homes, Inc. Address: P.O. Box 73790 Contractor License No: SUNRIH1005QH Project Information: Project: Mountain Sunrise, Division II Description of Work: Plan 2068 B-2 car, lot 86 Sq. Ft. per floor: (1st) 1142 (2nd) 1137 Heat Type (Electric, Gas, Other): GAS Fees: City: Puyallup Permit No: BLD-08-0017-YL Issue Date: 02/08/2008 (Work must be started within 180 days) Receipt No: 53013 Subdivision: Mountain Sunrise, Div. II Contact: Dye, Kelli City: Puyallup Expires: 09/27/06270 (3rd) 0 Garage 430 Phone: 253-848-0820 State: WA Zip 98373 Lot: 86 Phone: 253-848-0820 State: WA Zip: 98373 Business License: Basement 0 Item Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc Building Permit 100-500k 1,723.06 993.75 729.31 5.6000 130.2340 $1,000 Building Plan Review 728.00 0.00 0.00 0.0000 0.0000 Mechanical Permit 78.25 0.00 0.00 0.0000 0.0000 Plumbing Permit 118.00 20.00 98.00 7.0000 14.0000 Fixture Sewer Inspection 145.00 0.00 145.00 145.0000 1.0000 ERU Water ERU ~ 1,500.00 0.00 1,500.00 1,500.0000 1.0000 ERU Water Meter (SFD) 300.00 300.00 0.00 0.0000 0.0000 Consumer Dep 90.00 40.00 0.00 0.0000 0.0000 State Building Fee 4.50 4.50 0.00 0.0000 0.0000 Fire District Impact Fee 866.88 0.00 866.88 0.3200 2,709.0000 square foot Sewer ERU (LID) 3,009.00 0.00 3,009.00 3,009.0000 1.0000 ERU Traffic Facilities Charge 1,288.76 0.00 1,288.76 1,276.0000 1.0100 Peak PM Trip TOTAL FEES: 59,851.45 Applicant's Affadavit: I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easements and restrictions of record. If applying as a contractor, I futher certify that I am currently registered in the State of Washington. Signature Firm Date Z ~ ~ ~ ~ O i~j ~~~~ V~f Ivr/'1L 4JVG VIYL~ # Sets Of Prints: Final Inspection: !}ate: By: Applicant: City of Yelm Community Development Department Building Division Phone: (360) 458-8407 Fax: (360)458-3144 Permit Fees Schedule Permit No: BLD-08-0017-YL Name: Sound Built Homes, Inc. Phone: 253-848-0820 Address: P.O. Box 73790 City: Puyallup State: WA Zip 98373 Project Information:' Project: Mountain Sunrise, Division II Description of Work: Plan 2068 B-2 car, lot 86 Site Address: 9122 Paradise View St. SE Assessor Parcel No. 63540008600 Fees: Item Acct Code Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc ------------------------- Building Permit 100-500k ----------- 032 001-322-10-00 ---------- 1,723.06 --------- 993.75 ------- 729.31 5.6000 130.2340 $1,000 Building Plan Review 100 001-345-83-00 728.00 0.00 0.00 0.0000 0.0000 Mechanical Permit 032 001-322-10-00 78.25 0.00 0.00 0.0000 0.0000 Plumbing Permit 032 001-322-10-00 118.00 20.00 98.00 7.0000 14.0000 Fixture Sewer Inspection 805 412-343-80-00 145.00 0.00 145.00 145.0000 1.0000 ERU Water ERU 715 401-343-80-02 1,500.00 0.00 1,500.00 1,500.0000 1.0000 ERU Water Meter (SFD) 712 401-343-80-01 300.00 300.00 0.00 0.0000 0.0000 Consumer Dep 740 402-389-00-00 90.00 40.00 0.00 0.0000 0.0000 State Building Fee 160 001-386-00-00 4.50 4.50 0.00 0.0000 0.0000 Fire District Impact Fee 105 001-345-85-00 866.88 0.00 866.88 0.3200 2,709.0000 square foot Sewer ERU (LID) 802 412-343-50-01 3,009.00 0.00 3,009.00 3,009.0000 1.0000 ERU Traffic Facilities Charge 420 120-345-85-00 1,288.76 0.00 1,288.76 1,276.0000 1.0100 Peak PM Trip TOTAL FEES: $9,851.45 _~ _. ~..._. ~ ~_.__.__-_~- _.. r ~~~~ T~P~ CITY OF d ~ YELM P.o. Box 479 RECEIPT No.J ~ ~ ~ 3 - Yelm, WA 98597. L 360-458-3244 RECEIVEQ* ,. *NTNE THOUSAND EIGHT H[3NDRED FTFTY< ONE DOLLARS & 45 CENTS DATE REC.NO. AMOUNT REF. NO. RECEIVED FROM SOUNDBUTLT HOMES 02/@8/08 53@13 9,851.45 CHECK 5707.8 PO BOX 7379@ P[JYALLUF WA 98373 BtLDGETARY MICHELLE 86 Mountain Sunrise SUB-02-8329-YL Total Lots Fee Per Lot Total Fees 101 51,711.00 $172,811.00 Recorded at County Paid By Date Lot(s) Paid,,,, Amount Date Number First American Title 12/7/06 43, , 55-101 ~ $83,839.00 1/8/07 3893601 Soundbuilt Homes 4/13/06 31-36 $10,266.00 4/17/06 3823666 Sunrid a Homes 4/10/06 10-12, 21, 24-27 $13,688.00 4/11/06 3822492 Soundbuilt Homes 3/14/06 28-30, 38, 39 $8,555.00 3/20/06 3816165 Soundbuilt Homes 2/27/06 42 $1,711.00 3/3/06 3812510 Sunrid a Homes 1/31/06 7-8, 14-20, 22, 37 $20,532.00 2/1/06 3805373 Sunrid a Homes 1/3/06 6, 23 $3,422.00 2/1/06 3805374 Soundbuilt Homes 12/5/05 13 $1,711.00 12/8/05 3791623 Soundbuilt Homes 11/16/05 52, 54 $3,422.00 11/21/05 3786557 Soundbuilt Homes 11/4/05 53 $1,711.00 11/9/05 3783661 Soundbuilt Homes 10/28/05 1-5, 40, 41, 45-51 $22,243.00 11/9/05 3783659 Soundbuilt Homes 3/21/05 44 $1,711.00 3/31/05 3720450 Total Paid: $172,811.00 Mountain Shadow SUB-OS-011-YL Total Lots Fee Per Lot SUB-OS-012-YL 82 $2,140.00 Total Fees $175,480.00 Recorded at County Paid By Date Lot(s) Paid Amount Date Number Soundbuilt Homes 2/6/07 Lot 34 aid $2,140.00 (To be recorded) 6 Lots aid to be determined $12,840.00 To be recorded) Remainder toward 7th lot $848.00 U "Ca IaE~v~ ~:.~~ ~v~ i i~a i'~i ~J~ L. ,~G.~:n iJ Total Paid: $17,120.00 APPROVED /.~ C R ~ S"s l~.l Pk ~ ~ ~/~ T t~~ NF KELLI~ <253) Y~~8-°t1820 ~~~_~~. 1. M~^~;NTAIN 12' Fwr~r~~v L;TrucrurzEs ~r;'f ~?UNC1F~f TfJ BE T Il,~17L.lNED 'T CI DRYWELL_ 3. DF~IVEWAY ,aPPRpAC}-~ TCI Iii 17F'EJClM I'INISNED .2- c.. -- c~ ~' .~._._ ~' j" JOINT USE aRIVEWAY ti~ ~, ~ ~ A, ~~~~ e . ~ ~ ~ ,. ~, "/ / ..> '~ •~. .~ e' • • / a f N / ~~ --~~ If ,~`~ 4` a ~ • . 4> ` r ` ~ r` ~ ~ ti~ ~~. i ~ ~ `5J`• r ~ ~,~~ ~~ ,~' ~~. ~ ~ j~ 7~r ~ ~ ~~""" ~ e~ 6'x$-~' STEP TANK ~ ~ r, ~~' ~~Nr+~+vr~ ~~or~ ~~~, ~, ~ti ~" t 30' EXISTING OLYMPIC ~ GAS PIPELINE EASEMENT ~3~ ~ 10' UTILITIES EASEMENT b ~~~ ~~y~ ~.~~~ MOUNTAIN SUNRISE, LOT 86 SOUNDBUI~T CITY OF YELM ~ NOMES, INC. P.O. a©x 7390 9122 PARADISE VIEW ST SE PUYAL.~UP, LIA 98373 YELM, wA __..___ PHA 0253? 848-0820 _ FAxi C253> 539-0514 PARCEL # SCALE 1'=30' DATES of-o2-o8 Plan #2068B-8-2 CITY OF YELM RESIDENTIAL BUILDING PERMIT APPLICATION FORM Project Address: 9122 Paradise view Street SE Parcel $UbdIVISIOn: Mountain Sunrise LOt #: 86 63540008600 ZOning; Residential New Construction ~ Re-Model / Re-Roof /Addition i ~~ Home Occupation Sign Plumbing ~ Mechanical ~ Mobile /Manufactured Home Placement ~ Other Project Description/Scope of Work: New, wood framed, single family residence Project Value: $170, 925.00 Building Area (sq. ft) 15` Floor 114z 2"d Floor 1137 Garage 430 Deck o Basement o Carport o Patio 100 # Bedrooms 4 # Bathrooms? •• S Heating: GAS/OTHER or ELECTRIC (Circle One) Are there any environmentally sensitive areas located on the parcel? No If yes, a completed environmental checklist must accompany permit application. BUILDING OWNER NAME: soundbuilt xomes, Inc. ADDRESS Po Box 73790 EMAIL CITY Puya]?1D STATE wA ZIP 98373 TELEPHONE 253-848-0820 ARC4-#ITEGT/ENGINEER Gerry slick Designs LICENSE # ADDRESS 1944 Pacific Avenue suite 307 EMAIL CITY Tacoma STATE wA ZIP 98402 TELEPHONE 253-573-1562 GENERAL CONTRACTOR same as owner TELEPHONE ADDRESS EMAIL CITY STATE ZIP FAX CONTRACTOR'S LICENSE # SOUNDBH075BM EXP DATE9/oeCITY LICENSE # PLUMBING CONTRACTOR Rick the Plumber TELEPHONE 253-847-7239 ADDRESS Po Box 79z EMAIL CITY Graham STATE wz. ZIP 98338 FAX CONTRACTOR'S LICENSE # RrcxPC7o32RN EXP DATES/08CITY LICENSE # MECHANICAL CONTRACTOR sound xeating TELEPHONE 253-875-3350 ADDRESS 5526 1s4th street s, suite A EMAIL CITY Puyallup STATE wz~ Zlp 98375 FAX 253-a7s-o28s CONTRACTOR'S LICENSE #_souNDxAO66BM EXP DATEe/o7CITY LICENSE # Copy of mitigation agreement with Yelm Community Schools, if applicable. 1 hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above described property will be in accordance with the laws, rules and regulations of the State of Washington and the City q~Yelm. II 1 (J 1/2/08 Appli ant's Signature Date Owner /Contractor /Owner's Age ontractor's Agent (Please circle one.) All permits are non-transferable and will expire if work authorized by such permit is not begun within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days tva retm avenue west (360) 458-3835 PO Box 479 (360) 458-3144 FAX Yelm, WA 98597 www.ci.yelm.wa.us J.~i~1-I~-rij~~~~ T~~OPI 10.34 ANI FACII.ITIEa ~i36U 4~~~~ 64j4 r'. UU1/UU1 360.458,6116 FAX; 360.458.b~.3Q 401 COA7ES Ave. N W = PO Box b.76 A A ~A / ~ D~SIR~~ MCCONNELL Yf:LM, WA 98597-0476 ~~ / ~'! / V ~ TY C/'1 FACILITIES SECRETARY Desfree_mcconndl®ycs.wcdnct,cdu January 14, City of Xel~ Atm: John Fax; 360-458-3144 RE: Mitigation Fees Lots 86, 87, 88, 89 ~ f Mt. Sunrise Phase II, all mitigation fees have been paid, FROr~'1 :1~'E~.M SE~JER DEPT. FAX N0. :360-458-8166 Aug. 20 2008 12:2E~PM P1 ~~ tM~ p~~ ~~ ~,~,,.~ ~'~ANSMISSICJN CITY OF 'YELM ~~~ wQ" P.~. B~~C 479 - 93 X NP RDAD NE YELIVI, WA 9$597 360-45$-841 I . ~'A~ 360-45~-5166 TO: ~ ~~~ F,A.X# DATE: ~S ~, ~ ~ag PAGES: / ,including this Coyer sheet Fram: ~ANn`~' Subject: ~ a ~S ~ fit~A,~ YET. S uN~~S~ COMMENTS: t,o 1 ~'~ '~ ~ ~~R.At~IS~ ~ ~~~ sT, ,~.~ . ,~ ~3. 33~i a7 *"' lf'you do Il4t receive aii copies or any chpy is not legiblc~ please call (360) 45~3~~4 t ~ As soda as possible. ~. ~. OLYMPIC PIPE LINE COMPANY / BP PIPELINES NA INC GENERAL CONSTRUCTION & RIGHT OF WAY REQUIREMENTS Olympic Pipe Line Company ("OPEC"), which is operated by BP Pipelines (North America) Inc. ("BP"), is committed to environmental stewardship and maintaining the safety of its employees, contractors and the general public. The pipelines BP/OPEC operates transport various liquids at high pressure, and do so very safely each and every day. There are however, potential hazards associated with construction or excavation work around pipelines. As a result of these potential hazards, and in compliance with the requirements imposed upon BP/OPEC as an industry regulated by the U.S. Department of Transportation and Office of Pipeline Safety, the following list of general requirements for working on the Pipeline rights-of-way has been compiled. r~~~r~ General Safety Requirements Washington One-Call at 1-800-424-5555 or Oregon One-Call at 1-800-332-2344 must be contacted at least 48 hours (2 working days) before any construction and or excavation activities are initiated within the pipeline right of way so that OPEC may have a representative present to ensure that there are no conflicts with the pipeline. (There is no cost to the third party contractor to use the One-Call Notification service. However, failure to utilize the One-Call service can be quite costly in terms of unnecessary risk for the contractor/excavator, their employees, innocent bystanders, personal property of other and the environment; as well as potential civil penalties and/or fines.) • To have the pipeline physically located and depth verified, please call OPEC's Field Project Office at {425)235-7767 or the Damage Prevention Office at (425)981-2517. • OPEC requires arepresentative/inspector on site when any work is being performed within ten feet (10') of the pipeline(s) or if the reach of mechanized equipment is capable of extending within ten feet (10') of the pipeline(s). Forty-eight (48) hours prior notice to OPEC is highly recommended for any work. Notice to OPEC does not relieve the contractor of any notification responsibility to the appropriate state One-Call System. • OPEC requires detailed construction plans and or drawings for any work within the pipeline easement. OPEC requests at least 10 working days for review and comments/approval of plans. Plans and drawings should be submitted to Olympic Pipeline Company, Field Project Office, 2319 Lind Ave, SW, Renton WA 98055 • The contractor is responsible for having the pipeline location added to the construction drawings. The contractor is also responsible for taking all the necessary safety precautions and will be held responsible for any damages caused to the pipeline or property as a result of their work... Print Date: 2/4/2008 Page 1 of 3 Revision Date: 1/18/2006 Excavation Specific Requirements • No excavation or construction activity will be permitted in the vicinity of the pipeline(s) until all appropriate communications have been made with OPLC's field projects and engineering personnel. There shall be no excavation or backfilling within the pipeline right of way for any reason without a representative from OPLC on site stating permission. • In some instances, excavation and other construction activities around certain pipelines can be conducted safely only when the pipeline operating pressure has been reduced. • Contractors are therefore cautioned that excavation which exposes or significantly reduces the cover over a pipeline may have to be delayed until the reduced pressure is achieved. General Construction Activities • The contractor shall not be permitted to transport construction materials or equipment longitudinally over the pipeline. • Any required relocation or encasement of the pipeline(s) will be at the developer's expense. • Development grading should not remove any of the existing ground cover from; or add excessive fill over the pipeline(s). OPLC's prior approval to add fill is required. Where it is necessary for construction equipment (i.e. tractors, backhoes, dump trucks etc.) or equipment transporting construction materials to cross the pipeline to gain access to the job site, a crossing shall be constructed at a 90 degree angle to the pipeline. The contractor will be responsible for protecting the pipeline depending on depth, soil conditions and type of equipment for temporary or permanent crossings using either fill or steel sheeting. These methods must meet OPLC's requirements and have prior approval from our Engineering and Construction Departments. • No track type construction equipment shall be permitted to pivot or turn directly over the top of the pipeline. • A scraper or pan type tractor shall not be used for removal of soil within ten feet (10') of the centerline of the pipeline. Rubber tire or small track type equipment is an acceptable alternative. • A sheepsfoot roller shall not be used for compaction purposes within five feet (5') of the centerline of the pipeline. • No vibratory rollers shall be used within three feet (3') of the centerline of the pipeline until the compacted cover over the pipeline has reached a depth of three and one-half feet (3 %2). Parking Lots, Roads, Driveways, Fences and Structures • No permanent structures may be constructed on the pipeline right of way. No roads or fences shall run parallel to the pipeline within the pipeline right of way. Roads and fences shall cross the pipeline right of way at, or as near to, a 90 degree angle as is feasible. In no instance shall the angle of the crossing be less than 45 degrees. Fence posts must maintain a minimum three feet (3') clearance off the pipeline(s) when crossing the easement. There shall be a minimum vertical separation of two feet (2') between the pipeline and any underground structure. A minimum of five feet (5') of cover is required for all road crossings, and three feet (3) for driveways; however a stress factor calculation may be needed to determine the actual amount of cover required depending on soil conditions and other circumstances. Print Date: 2/4/2008 Page 2 of 3 Revision Date: 1/18/2006 Proposals for parking lot construction on the pipeline right of way are discouraged. Asphalt paving may be permitted as an exception under certain conditions with an agreement executed by the property owner and OPLC. The agreement grants OPLC the right to excavate within the pavement area for any pipeline maintenance that may be necessary in the future and acknowledges the property owner as the party responsible for the expense of pavement replacement. If a parking lot is permitted by OPLC a minimum of four feet (4') of cover will be required. However OPLC will evaluate each proposal on an individual basis, and may impose additional requirements. Concrete pavement is discouraged; and in most instances will not be allowed. A minimum of three feet (3') of cover is required for all drainage ditches. No structures such as manholes, catch basins, thrust blocks or fire hydrants shall be located over the pipeline. A minimum horizontal clearance of ten feet (10') is required between the structure and pipeline. Foreign Line or Utility Crossings • All foreign lines shall cross the pipeline right-of-way at, or as near to, a 90 degree angle as is feasible. • In no instance shall the angle of the crossing be less than 45 degrees. • In no instance shall the foreign line be placed parallel to the pipeline within the pipeline right-of-way. • The foreign line shall cross under the pipeline with at least two feet (2') of vertical separation unless the pipeline is at a prohibitive depth. In such cases, OPLC personnel will review and evaluate the proposed crossing location to determine if it will be allowable for the foreign line to cross above. • If the foreign line is a telecommunications cable, power cable or similar in nature, the foreign line shall be placed in Schedule 40 PVC conduit, or greater, for a linear distance extending ten feet (10') on either side of centerline of the pipeline. In the case of a power cable it shall be encased in red-dyed concrete for a linear distance of ten feet (10') on either side of centerline of pipeline. • A utility with a cathodically protected foreign line which crosses or is placed adjacent to OPLC's pipeline(s) must install a test point and perform interference testing between the utility and OPLC. Please contact OPLC's Corrosion Technician by calling our main office at (425) 226-8883. • Below ground warning tape shall be placed in the ditch line above the foreign line. The warning tape shall be placed approximately one foot (1') below the final surface grade/elevation. The warning tape shall extend for a linear distance of ten feet (10') on either side of the centerline of the pipeline. Landscape and Vegetation • No trees are allowed on the pipeline right of way. OPLC may permit the installation of limited landscaping and minor shrubbery plantings with a verbal communication. For major development, landscaping plans must first be submitted in writing to OPLC for review and approval. Any plantings that restrict efficient aerial inspection or limit access to the easement area will be considered an interference and must be addressed accordingly OPLC reserves the right to impose further stipulations or requirements consistent with each individual easement or situation. Should you anticipate any problems regarding these requirements please contact OPLC's Field Project Office at (425)235-7767. Print Date: 2/4/2008 Page 3 of 3 Revision Date: 1/18/2006 CITY OF YELM INSPECTION LOG PROJECT Lot 86 MSII 2068 B-2 Car PERMIT NUMBER 08-0017 ADDRESS 9122 Paradise View St. SE SET BACKS Date: 2-22-08 Corrections UNDER FLOOR ® Corrections 4-11-08 DRY WELL ®_ Corrections 3-6-08 FOOTING REBAR _ _®Date:_ 2-22-08 28-08 Footing ^ 12" ^ 16" Wall ^ 6" ^ 8" Required vents_ Corrections WALL REBAR ®Date:2- Other_ Other COMBINED FRAME/ EXTERIOR SHEAR WALL INSPECTION Hold downs ® 4-22-08 Shear Nailing ® 4-22-08 Frame ® 5-5-08 Gas/Propane _ ® 5-5-08 Plumbing ® 5-5-08 Mechanical _ ®_ 5-5-08 Corrections: INSULATION ®Gas ^Electric ^Other ®Foam and Seal ^Vapor barrier ^PVA Corrections: 5-7-08 SHEET ROCK/SHEAR WALL NAIL Corrections: 5-15-08 FINAL ®Sewer Final ®Electrical ^ Civil Final ®Address ®Insulation ^ Site Drainage ^Landscape Final ®C of O ^ Sidewalk Correections: 8-20-08 AUG-04-2008 15:17 City of Yelm Public Works 360 458 8417 P.Oli01 °~YN~A~ Cit o Yelm ~ ~ ~ ~______ 6 Public Works Department JOl Rhoton Road P.4. Box 47~J Y~..,.,M Te~ 1 elm, WA J85J r E3G0) -158•$40G Fax: (3G0) X58-8~f 17 NEW HOME FINAL DATE: ~-~- ~ b ~ _ DEVELOPMEI'1T: BUILDER'S N.~+MC: ~4T r~: CpMMENTS: ~~ INSPECTED t3'~: Date: ~O o Jahn (vcy o Edward :;:rnitt~ ~ Tim Rarick U« TOTAL P.01