05-0601 Water Review No. 1 111606 THE PROJECT’S NAME: The Hutch Date: 16 November, 2006 1. Sheet 18 Notes 1. The blow off assembly needs an eight inch gate valve at the end of the main for the future extension. 2. The water meter for lot 45 may need to be moved more North, so it will not be in a driveway. 3. All the water main needs to be eight inch pipe. 4. Sheet 18 Notes 5. The fire hydrant should be moved North too the water meters box’s side, and not in the center of the lot 50. 5. Can the water meter for lot 106 be moved to / with lot 107 to make it a double and too get it away from the sewer box? 6. Can the water meter for lot 105 be moved to / with lot 104 to make it a double and too get it away from the sewer box? 7. The water meter for lot 1 may need to be moved more North, so it will not be in a driveway. 8. Sheet 20 Notes 8. The blow off assembly needs an eight inch gate valve at the end of the main for the future extension. 9. Sheet 20 Notes 9 and 10. The water main is not stubbed out in this area. This needs to be hot tapped. 10. Why is the sewer and water at the same elevation on this project in a lot of the same area? 11. The storm drain ponds water meters have to have a Double Check Valve Assembly on these water meters. 12. The existing fire hydrant at Sprage Street looks like it will have to be moved. 13. The air/release need to exit thru the side or the back of the box. (Not the lid) 14. Sheet 27 of 29. Street Lighting (per Tim) see print. 15. Any Pocket Parks, street frontage on Killion Road and Mountain View Road with irrigation meters and Double Check Valve Assembly’s? 16. Change Signature block.