Loading...
05-0601 Water Review No. 2 012607.docTransmittal Letter ???????????????????? From: Edward Smith Sent: Friday, January 26, 2007 11:04 AM To: Tim Peterson Cc: Deonne Hardy; Kevin Ray; Jim Gibson; Steve Harrington Subject: The Hutch Plan Review, number 2 .doc City of Yelm Public Works Department 901 Rhoton Road / P.O. Box 479 Yelm, WA 98597 (360) 458-8406  Fax: (360) 458-8417   Transmittal Letter   To:       Date:                 Company:       Re:               City, St Zip           Name:         Items transmitted for:   Review and comment   For your records   As Requested   Other Public Works Inspection Report   Date:  ____________ 26/Jan/2006                                                                       Page 1 ___ of of 1___   Location: The Hutch                                                                  _________________________________             Department:  Water_________   Contractor:                                                                  ________________________________            Rep: 1.         Can the water meter for lot 106 be moved to /with lot 107 to make it a double and to get away from the sewer box? 2.         Can the water meter for lot 105 be moved to /with lot 104 to make it a double and to get away from the sewer box? 3.         Sheet 20 Notes 9 and 10. The water main is not stubbed out in this area. This needs to be hot tapped. 4.         The air/release need to exit thru the side or back of the box. (Not the lid) 5.         Sheet 27 of 29. Street Lighting (per Tim) see print. 6.         Any Pocket Parks, street frontage on Killion Road and Mountain View Road with irrigation meters and double check valve assemblies 7.         Change signature block. 8.         All the fire hydrant need to have a six inch gate valve for the fire hydrants at the main.   _______________   __________________________________________________ _______________________________________________________________________________________________________________________________________________________________________________________________________ _______________________________________________________________________________________________________________________________________________________________________________________________________ _______________________________________________________________________________________________________________________________________________________________________________________________________ _______________________________________________________________________________________________________________________________________________________________________________________________________                                       Reviewed by: John I and Edward Smith             Signed :Edward Smith                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Signed:  ______________________   Remarks:               Signed: Jim Gibson Development Services Engineer     cc: