05-0601 Sewer Review No. 4 050307City of Yelm Sewer Department
Re: Review – The Hutch
May 3, 2007
Please provide the latest details per City of Yelm spec.
Both “End of Line Clean outs” at both ends of “A” Rd. must be in the asphault.
Please add 1 in-line gate valve at sta. 40+00 on “B” Loop.
All ftgs. Used for this sewer main must be SL.X SL. Not MJ X MJ Only PVC can be used. The only exception being Gate Valves that are MJ X MJ (sheet 18 shows MJ X FL)
Sheet 20 shows the proposed Step Main to be connected to an existing Stu-out on killion Rd. we are not aware of any stub-out at this location.
Any sleaving (pipe encasement0 done must be done in PVC pipe with out any grouting.
The sleave must be 20’ long and centered over the pipe being crossed.