05-0601 Water Review No 5 052407 From: Edward Smith
Sent: Thursday, May 24, 2007 1:51 PM
To: Tim Peterson
Cc: Deonne Hardy; Jim Gibson; Kevin Ray; Steve Harrington
Subject: The Hutch #5 Plan Review Public Works.doc
The Hutch plan #5
City of Yelm Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date: 24/May/2007 Page
1
of
1
Location: The Hutch plan #5 Department: Water
Contractor: Rep:
1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final
until the City of Yelm has received the payment in full for the fire hydrant locks.
2. Sheet 20 – Note 10 – This water main will/Shall be connected to the water main on Killion Road.
Reviewed by: Edward Smith
Signed by: Edward Smith