05-0581 Water #1 062508 From: Edward Smith Sent: Wednesday, June 25, 2008 1:08 PM To: Tim Peterson Cc: Kevin Ray; Karen Bennett; John Ivey; Deonne Hardy; Steve Harrington Subject: Yelm Plaza 24 June 08 Water As-Built, Public Works report.doc Yelm Plaza 24 June 08 Water As-Built from the water department. City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406  Fax: (360) 458-8417   Public Works Inspection and As-Built Report   Date:  24 June 2008                                                 Page 1   Location: Yelm Plaza                                              Department:  Water   Contractor:                                                               Rep:   1. The 5/8 X 3/4 water meters have NOT been paid for, or installed for building B & C. 2. The Reduced Pressure Backflow Assemblies are NOT installed or tested for building B &C.           Reviewed by:  Edward Smith , John I. Signed by:    Edward Smith