Subject: Yelm Plaza 24 June 08 Water As-Built, Public Works report.doc
Yelm Plaza 24 June 08 Water As-Built from the water department.
City of Yelm Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection and As-Built Report
Date: 24 June 2008 Page 1
Location: Yelm Plaza Department: Water
Contractor: Rep:
1. The 5/8 X 3/4 water meters have NOT been paid for, or installed for building B & C.
2. The Reduced Pressure Backflow Assemblies are NOT installed or tested for building B &C.
Reviewed by: Edward Smith , John I.
Signed by: Edward Smith