Loading...
05-0581 Water #1a 062508 From: Edward Smith Sent: Wednesday, June 25, 2008 1:08 PM To: Tim Peterson Cc: Kevin Ray; Karen Bennett; John Ivey; Deonne Hardy; Steve Harrington Subject: Yelm Commercial Building 25 June 08 Plan Review Public Works.doc Yelm Commercial Building 25 June 08 Plan Review form the water department. hine\Software\Classes\.htm\PersistentHandler City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406  Fax: (360) 458-8417   Public Works Inspection Report   Date: 24 June 2008                                    Page 1   Location:  Yelm Commercial Building    Department:  Water   Contractor:                                                  Rep: 1.         The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. 2.         The fire hydrants in commercial projects are to cover 150 feet coverage. Is this project covered for fire hydrant protection? 3.         Need to have a Reduced Pressure Backflow Assembly behind the Domestic water meter. And need to have a Double Check Valve Assembly behind the Irrigation meter.   Reviewed by:  Edward Smith, John I Signed by:    Edward Smith