05-0581 Water #1a 062508 From: Edward Smith
Sent: Wednesday, June 25, 2008 1:08 PM
To: Tim Peterson
Cc: Kevin Ray; Karen Bennett; John Ivey; Deonne Hardy; Steve Harrington
Subject: Yelm Commercial Building 25 June 08 Plan Review Public Works.doc
Yelm Commercial Building 25 June 08 Plan Review form the water department.
hine\Software\Classes\.htm\PersistentHandler City of Yelm Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date: 24 June 2008 Page 1
Location: Yelm Commercial Building Department: Water
Contractor: Rep:
1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final
until the City of Yelm has received the payment in full for the fire hydrant locks.
2. The fire hydrants in commercial projects are to cover 150 feet coverage. Is this project covered for fire hydrant protection?
3. Need to have a Reduced Pressure Backflow Assembly behind the Domestic water meter. And need to have a Double Check Valve Assembly behind the Irrigation meter.
Reviewed by: Edward Smith, John I
Signed by: Edward Smith