City of Yelm Inspection Form 1 Yelm Plaza City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 8/28/07 Day: Tuesday Time: 10:30 a.m.  Project Name: Creek Street Plaza Project Number BSP-05-081-YL  Project Description: Commercial Contractor's Name: Dale Wood Construction / Excavating  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are Dry and rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on placing Storm Infiltration Facility for the project site. Contractor not on site working today. Utility locate onsite doing locates.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working exxing Storm infilitration facility.  Sketch or Paste Pictures Below:    Date 8/28/07 Typed or Printed Name and Title Steve Harrington Signature