CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 11/28/07
Day:Wednesday
Time: 10:15 a.m.
Project Name:
Creek Street Plaza
Project Number
BSP-05-081-YL
Project Description:
Commercial
Contractor's Name:
Dale Wood Construction / Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are Dry and rocky, Contractor is onsite today working.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is on
site working today. They are working on the roof drains running into the storm treatment and storm infiltration system.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on roof drains running to the Storm Treatment and Infilitration Gallery.
Sketch or Paste Pictures Below:
Date
11/28/07
Typed or Printed Name and Title
Steve Harrington
Signature