CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 2/19/07
Day:Tuesday
Time: 2:15 p.m.
Project Name:
Creek Street Plaza
Project Number
BSP-05-081-YL
Project Description:
Commercial
Contractor's Name:
Dale Wood Construction / Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are Dry and rocky, Contractor is onsite today working.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is not
working on site working today. No ground exxing, utility work being done today.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor is not working on site working today.
Sketch or Paste Pictures Below:
Date
2/19/07
Typed or Printed Name and Title
Steve Harrington
Signature