CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 3/12/08
Day:Wednesday
Time: 3:15 p.m.
Project Name:
Yelm Plaza
Project Number
BSP-05-081-YL
Project Description:
Commercial
Contractor's Name:
Dale Wood Construction / Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are Dry and rocky, Contractor is onsite today working.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is working
on rocking parking area with ballast.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor is working on site working today.
Sketch or Paste Pictures Below:
Date
3/12/08
Typed or Printed Name and Title
Steve Harrington
Signature