City of Yelm Inspection Form 13 Yelm Plaza City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 4/15/08 Day:Tuesday Time: 3:35 p.m.  Project Name: Yelm Plaza Project Number BSP-05-081-YL  Project Description: Commercial Contractor's Name: Dale Wood Construction / Excavating  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are Dry and rocky, Contractor doing concrete work has set up forms for curbing between the two parking lot drivelanes.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is working on curbing between parking lot drive lane.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor is working on site working today.  Sketch or Paste Pictures Below:    Date 4/15/08 Typed or Printed Name and Title Steve Harrington Signature