City of Yelm Inspection Form 2 Yelm Plaza
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 8/29/07
Day: Wednesday
Time: 11:03 a.m.
Project Name:
Creek Street Plaza
Project Number
BSP-05-081-YL
Project Description:
Commercial
Contractor's Name:
Dale Wood Construction / Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are Dry and rocky, Contractor not onsite today working.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor not
on site working today.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working exxing Storm infilitration facility.
Sketch or Paste Pictures Below:
No Pics Today
Date
8/29/07
Typed or Printed Name and Title
Steve Harrington
Signature