Project Inspection Card With Water and Sewer Sign Off Yelm Plaza
Project Name Yelm Plaza
Project Type Commercial / Plat
Project Number SUB-05-0581-YL
Inspection Start Date: August 15, 2007 Project Completion ____________________
Roadway Construction
Inspection Type: Visual or mechanical as necessary
Inspection Frequency: 24 hour notice
Inspection Types
Subgrade ( ___________
Curb ( ___________
Ballast ( ___________
Top Coarse ( ___________
Asphalt ( ___________
Roadside Construction
Inspection Type: Visual
Inspection Frequency: 24 hour notice
Inspection Types
Dry Utility Ditch ( ___________
Sidewalk ( ___________
Planter Strips ( ___________
Street Trees ( ___________
Street Lights ( ___________
Street Signs ( ___________
Street Monuments ( ___________
Irrigation Systems ( ___________
Mail Boxes ( ___________
Storm Water Construction
Inspection Type: Visual
Inspection Frequency: 24 hour notice
Inspection Types
Structures ( ___________
Piping ( ___________
Treatment ( ___________
Infiltration ( ___________
Erosion and Sedimentation Control
Inspection Type: Visual
Inspection Frequency: Weekly or weather related
Final Inspection Request
Inspection Type: Visual
Inspection Frequency: 2 weeks before anticipated or certificate of occupancy
NOTE: The Water and Sewer System must be inspected and signed off (Box checked, initialed and dated) by the appropriate department before this card can be deemed as being complete and
signed off.
Water System: ( ___________: inspections will be completed by the Public Works Department. Phone (360) 458-8412 to schedule water inspections 24 hours in advance.
Sewer System: ( ___________: inspections will be completed by the Public Works Department. Call (360) 458-8411 to schedule sewer inspection 48 hours in advance.