Loading...
Behind DQ - Storm InspectionIPM.Note Behind DQ - Storm Inspection Steve Harrington Jim Gibson Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON Behind DQ - Storm Inspection EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON Steve Harrington Behind DQ - Storm Inspection I inspected the gallery behind Quizino’s and gave them the ok to cover the gallery. The rock, infiltrators and cover rock were all installed. They had not made the inlet connections to storm tech chambers at the time of inspection. Jim Gibson P.E. City of Yelm, Development Review Engineer PO Box 479 Yelm,WA. 98597 Ph. 360.458.8438 Fx. 360.458.3144 <mailto:jimg@ci.yelm.wa.us> jimg@ci.yelm.wa.us <DC90029353CCCD468AA2A2858FFCD8F53BFC1A@server1.ci.yelm.wa.us> Behind DQ - Storm Inspection.EML Jim Gibson Steve Harrington 11.0 Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh Steve Harrington SMTP steveh@ci.yelm.wa.us Steve Harrington STEVEH