Behind DQ - Storm Inspection
I inspected the gallery behind Quizino’s and gave them the ok to cover the gallery. The rock, infiltrators and cover rock were all installed. They had not made the inlet connections
to storm tech chambers at the time of inspection.
Jim Gibson P.E.
City of Yelm, Development Review Engineer
PO Box 479 Yelm,WA. 98597
Ph. 360.458.8438 Fx. 360.458.3144
<mailto:jimg@ci.yelm.wa.us> jimg@ci.yelm.wa.us
<DC90029353CCCD468AA2A2858FFCD8F53BFC1A@server1.ci.yelm.wa.us>
Behind DQ - Storm Inspection.EML
Jim Gibson
Steve Harrington
11.0
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
steveh
Steve Harrington
SMTP
steveh@ci.yelm.wa.us
Steve Harrington
STEVEH