Yelm Plaza Water and Sewer Comments for Review Letter No 2IPM.Note
Yelm Plaza Water and Sewer Comments for Review Letter No.2
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Yelm Plaza Water and Sewer Comments for Review Letter No.2
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
'Chris Merritt'
Yelm Plaza Water and Sewer Comments for Review Letter No.2
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
Chris: We had sent you the review letter No. 2 with out water, sewer and planning landscape comments. Please find a revised letter including these comments.
Thank you,
Steve Harrington
Civil Inspector
<DC90029353CCCD468AA2A2858FFCD8F528F75F@server1.ci.yelm.wa.us>
Yelm Plaza Water and Sewer Comments for Review Letter No.2.EML
Steve Harrington
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh
Engineering Review No. 2 Yelm Plaza
Engineering Review No. 2 Yelm Plaza
'Chris Merritt'
SMTP
chris@olyeng.com
'Chris Merritt'
Chris Merritt
chris@olyeng.com
Engineering Review No. 2 Yelm Plaza.doc
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
May 23, 2007
Olympic Engineering
300 Deschutes Way S.W. Suite 315
Tumwater, WA 98501
Re: Yelm Plaza – Site Construction Documents Review No.2, Planning, Water and Sewer Corrections and Comments
City of Yelm Project Number - SUB-05-0581-YL
Mr. Chris M. Merritt, P.E.
The following need to be corrected on the Yelm Plaza construction plans. Water and Sewer comments are as follows:
Construction Plans:
Sheet 7 of 9:
1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City
of Yelm has received the payment in full for the fire hydrant locks.
2. Water meter service manifold detail on page C3.2. This method is not acceptable by the city. Please follow City of Yelm Standards 6-1 for single meter service and 6-2 for dual meter
service. There will have to be 2 or 3 taps depending on the COY water meter details used.
3. The water meter off of Plaza Drive NE. should be moved to the existing water meter box that is closer to the private road.
4. All commercial buildings are required to have backflow assemblies on the domestic water meters.
5. Sheet C 3.1 shows two individual step sewer taps. Please look at COY standard detail step sewer detail.
6. Symplex (1 pump) system in the step tanks, the pump must be an OSI 20 GPM pump.
7. A hose bib is required to be installed within 50 feet of each step tank for servicing.
Landscaping:
8. Please provide a detailed plant and tree list by including sizes, quantities, and spacing of all the plants and trees. Landscape plans cannot be reviewed until the detailed list
is received.
Should you have any questions or comments, please contact me at (360) 458-8423 or e-mail me at steveh@ci.yelm.wa.us at your earliest convenience.
Respectfully,
Community Development Department
Steve Harrington
Civil Inspector
Copy: Jim Gibson, Development Review Engineer
May 23, 2007 Page 2 of 2