TIA 001~~~ HEA'LH & ASSOCIATES, INC. Transportation and Civil Engineering
YELM PLA7.A
TRAFFIC IMPACT ANALYSIS
YELM, WA
~' B
~~~Cse~o£ wesyt~q~
R
~o~ zo~a~p ~w
etoeat ~
OS~I~Iob
Prepared for: Mike McKinnon Sr
Fourbest Partners, LLC
P.O. box 12540
Olympia, WA 98508
MAY 2006
~~~ ,,
c/
'ic. ,>~,
2214 Taromu Road • Puyallup, WA 98371 • (353) 770-1401 • Fax (253) 770-1473
YELM PLAZA
TRAFFIC IMPACT ANALYSIS
TABLE OF CONTENTS
1. Introduc[ion .................................................................... .............................................3
II. Project Description ......................................................... .............................................3
III. Existing Conditions ........................................................ .............................................3
IV. Future Traffic Demand ................................................... ...........................................10
V. Conclusions and Mitigation ........................................... ...........................................17
Appendix
LIST OF TABLES
1. Existing Leve] of Service ............................................................................................9
2. Trip Generation .........................................................................................................10
3. Future Level of Service .............................................................................................16
LIST OF FIGURES
1. Vicinity Map & Roadway Sys[em ............................................... ...............................4
2. Site Plan ....................................................................................... ...............................5
3. Existing PM Peak Hour Volumes ................................................. ..............................7
4. Trip Distribution &Assignment ................................................... .................
1 ]
5. Pipeline Volumes .......................................................................... ...........
............................12
6. 2008 PM Peak Hour Volumes Without Project ............................ ............................13
7. 2008 PM Peak Hour Volumes With Project ................................. ............................14
YELM PLAZA
TRAFFIC IMPACT ANALYSIS
/. INTRODUCT/ON
This study serves to investigate traffic impacts related to the proposed Yelm Plaza office-
retail project. The main goals of this study focus on the assessment of existing traffic
wnditions and intersection congestion, forecasts of newly generated project traffic, and
estimations of future intersection delay. The first [ask includes the collection of general
roadway informatioq road improvement information, entering sight distance data, and
peak hour traffic counts. Next, a detailed level of service analysis of the existing volumes
is made to determine [he present degree of intersection congestion. Forecasts of future
traffic and dispersion patterns on the street system are then determined using established
trip generation and distribution techniques. Following this forecast, the future service
levels for the key intersections are investigated. As a final step, appropriate conclusions
and possible off-site mitigation measures are defined.
!L PROJECT DESCRIPTION
The proposed project consists of 3 mixed use office-retail buildings. Each building is two
stories [all, with a 3,000 square foot first floor and a 1,000 square foot second floor, for a
total of 12,000 square feet of building area. The building usage is expected [o be half
retail and half office. The site is located on the east side of Plaza Drive and north of
Yelm Avenue in the City of Yelm, WA. Access to the site is to be provided by an
existing drive connecting to Plaza Drive to the west, and to Creek Street to the east. This
existing drive presently serves other commercial buildings to the south and east of the
site. Buildout of this project is estimated by 2008. The year 2008 was therefore
designated as the horizon year for traffic study purposes. Figure 1 shows the general site
location and surrounding roadway system, while the site plan showing the overall
building configurations and parking layout is shown in Figure 2.
I/L EXISTING CONDITIONS
A. Surrounding Roadway System
Roadways serving [he proposed site range from two lane major arterials to two-lane
collector roads which vary in width, terrain, and posted speeds. These roadways vary in
their overall function as part of the general network. The key streets near the site are
described on page 6.
N
YELM PLAZA
HEATH & ASSOCIA'PES, INC vlcwln MAF <rtor~wnY SSrem
Traoaporte Lion end Civil Engin e Ing
F16URE I
s'-0~ as -y;' ~s._°. io'-o' ~s._°. io'-o' 15._°. z ¢V
e' w rm[ z wmwvwc §
® _ 4
~ '
•~ ~
~~„ ~o ~o
eaa
~
„ b
/1
°
® ~ ~
~ ,
~ '
`1~1
~
~~
>e
~. ~
,z~
~
~ ®
::
~
~
YELM PIAZA
HEATH & ASSOCIATES, INC sre FUN
Transportation and Civil Engineering
F16URF 2
Plaza Drive NE is a two-lane roadway which lies to the west of the site. Lane widths are
up [0 17 feet, with curbed shoulders. The speed limit is not posted, but assumed at 25
mph. A sidewalk is provided on [he east side of the road.
Yelm Avenue, or SR-507, is a two-lane roadway which lies to the south of the property
and runs in anorthwesterly-southeasterly direction. A two-way left rum lane is provided
for most of the roadway section in Yelm. Right rum lanes are provided at major
intersections. The posted speed limit ranges from 25 mph to 35 mph in the vicinity.
Lanes aze 12 feet wide, while shoulders aze composed of curb and sidewalk. Bike lanes
aze provided on both sides of the road. Grades are flat.
SE Vanci/Road is a north-south two-lane roadway that lies ro the west of the project.
The posted speed limit is 25 mph. Lane widths aze roughly 13 feet, with shoulders
composed of curb and sidewalk.
!03rd Avenue SE is a two-lane roadway which lies to the north of the property. Lane
widths aze approximately 12 feet wide, while shoulders are composed of curb and
sidewalk. The speed limit is posted at 25 mph. Bike lanes are provided on both sides of
the road.
Clark Road SE is a north-south two-lane roadway [hat lies to the west of the project.
Lane widths aze 12 feet, with grass/gravel shoulders. The posted speed limit is 25 mph.
4tH Street SE/NE is a north-south local road that lies to the west of the project. Total
roadway width ranges from I S feet to 19 fee[, with grass/gravel shoulders. No speed
limit is posted.
B. Existing Peak Hour Volumes
Field data for this study was collected from May of 2005 to April of 2006. Counts were
taken during the evening peak period between the hours of 4 PM and 6 PM. This specific
peak period is tazge[ed for analysis purposes since it generally represents a worst case
scenazio for office developments with respect to traffic conditions. This is primazily due
to the common 8 AM to 5 PM work schedule and the greater number of recreation and
shopping trips associated with the eazly evening period. Drivers often travel home after
work at approximately [he same time of day, typically between 4 PM and 6 PM, which
translates to a natural peak in intersection and arterial traffic loads. Figure 3 on [he
following page shows the evening peak hour counts taken at the key intersections of
Yelm Ave/Plaza Dr, Yelm AveNancil Rd, Yelm Ave/103rd Ave, Yelm Ave/Clazk Rd,
Yelm Ave/4th St. Average daily traffic (ADT) volumes for State Routes aze available
from the Washington State Department of Transportation.
it
j a~
N ~~~_
s s,
/~ i~\
086 ~ X619
~~ ~ ~~
B 5 2]
YftM PIAZA
i , ba
e+ ~r
3~
~ ~o
n
o ~~
s
50 46 B8 \
54~ ~ ~55
638 +~ X549
\~ ~/
=9 3a =3
34 O I~~ \
45~ ~ `2~
~aey O the
~~, t ~~
i HEATH & ASSOCIATES, INC Exisrime PM Pe noun VOw Mes
I. Transportation end Clvil Engineering
FIGURE 3
C. Level of Service
Existing peak hour delays were determined through the use of the Highway Capacity
Manual Capacity analysis is used to determine level of service (LOS) which is an
established measure of congestion for transportation facilities. LOS is defined for a
variety of facilities including intersections, freeways, arterials, etc. A complete definition
of level of service and related criteria can be found in the HCM. The methodology for
determining [he LOS at signalized intersections strives to determine the volume to
capacity (v/c) ratios for the various intersection movements as well as the average control
delay for those movements. Delay is generally used [o measure the degree of driver
discomfort, frustration, fuel consumption, and lost time. Control delay, in pazticulaz,
includes movements at slower speeds and stops on intersection approaches as vehicles
move up in queue position or slow down upstream of an intersection. Aside from the
overall quantity of frafSo, three specific factors influence signalized intersection LOS.
These include the type of signal operation provided, the signal phasing pattern, and the
specific allocation of green time. The methodology for determining the LOS at
unsignalized intersections strives to determine the potential capacities for [he vazious
vehicle movements and ultimately determines the average total delay for each movement.
Potential Capacity represents the number of additional vehicles that could effectively
utilize a particulaz movement, which is essentially the equivalent of the difference
between the movement capacity and the existing movement volume. Total delay is
described as the elapsed time from when a vehicle stops at the end of a queue until the
vehicle departs from the stop line. Average total delay is simply the mean total delay
over the entire stream. A number of factors influence potential capacity and total delay
including the availability/usefulness of gaps.
The range for intersection level of service is LOS A to LOS F with the former indicating
the best operating conditions with low control delays and the latter indicating the worst
conditions with heary control delays. Existing LOS is shown in Table 1 found on page 9.
This analysis involved the Signal 2000 and HCS-1000 programs which aze based on
Chapter 16 and 17 procedures in the 2000 Highway Capacity Manual.
As shown in Table 1, the highest delays aze shown at the intersection of
Yelm Ave/Plaza Dr with southbound delays of LOS F. However, this intersection is
bracketed by signalized intersections on either side, which would make traffic arrivals
less random, and cause a platooning effect This should reduce delays somewhat from the
values calculated as shown. Other intersections aze currently operating with delays of
LOS A to LOS C.
TABLE 1
Existing Level of Service
Delays g(ven in seconds per vehicle
Intersection Con[ro( Approach LOS Delay
Yelm Ave/Plaza Dr Stop Northbound D 26.8
Southbound F 146.9
Eastbound LT A 9.3
Westbound LT B 10.7
Yelm AveNancil Rd Signal Southbound B 19.6
Westbound B 13.6
Northbound C 22.2
Eastbound B 15.7
Overall B 16.3
Yelm Ave/103rd Ave Stop Westbound C 22.0
Eastbound C 18.5
Northbound LT B 10.1
Southbound LT B 10.6
Yelm Ave/Clark Rd Signal Southbound C 26.8
Westbound A 2.4
Northbound C 26.7
Eastbound A 4.4
Overall A 5.0
Yelm Ave/4th St Stop Northbound C 20.6
Southbound C 20.0
Eastbound LT A 9.5
Westbound LT B 10.0
D. Pedestrian and Bicycle Traffic
Observations for pedestrian and bicycle activity were made during the vehicle count and
during other visits to gather field information. A mild to moderate amount of non-
motorist activiTy was noted. Bike lanes along with sidewalks are provided along Yelm
Avenue and 103rd Avenue. Non-motorist volumes may have a slight influence on
vehicle progression.
E. Transit
The aeazest transit service available is on Yelm Avenue and 103rd Avenue. Intercity
Route 94 runs from the Olympia Transit Center [o the Nisqually Plaza, with service in the
project vicinity between 6:00 AM and 7:30 PM. The neazes[ stop is located at the
intersection of 103rd Ave/Plaza St. A[ best, only minor transit usage would likely be
realized in the future with most project trips made via passenger car. No trip generation
reductions were made for transit in order to have a conservative analysis.
9
F. Sight Distance at Accesses
A preliminary examination of the existing shazed access locations onto Plaza Dave and
Creek Street was made to determine whether or not adequate entering sight distance can
be provided for inbound and outbound project traffic. According to the AASHTO Green
Book, a minimum entering sight distance of 335 feet would be required fora 30 mph
design speed. Based on field reviews, this minimum is met. No obstructions were noted
which would resVict sight distance. Horizontal and vertical curvature of the roadways is
negligible.
IV FUTURE TRAFFIC DEMAND
A. Trip Generation
Trip generation is used to determine the magnitude of project impacts on [he surrounding
street system. Data presented in this report was based on City of Yelm default trip
generation values provided in Table 15.40.030.B.1 of the Yelm Municipal Code. The
designated land uses for this project aze defined by Commercial-Administrative Office
(<9,999 sq ft) and Miscellaneous Retail Sales. The Yelm data only provides for [he 4 PM
to 6 PM peak hour. The table differentiates between total trips and net new trips to the
roadway network, with retail having a 50% net new trip rate, and offices having a 90%
net new trip mte. The average daily trips were obtained using ITE Trip Generation 5th
Edition and 7th Editions for offices (LUC 710) and specialty retail (LUC 814),
respectively. The ITE data was also used to determine the inbound/outboand splits.
Table 2 gives a summary of the estimated project [rip generation.
TABLE 2
Trip Generation Volumes -Total Volumes
6,000 s/Retail 6,000 sfOJfce Totals
Gross (Newt Gross (Newt Gross (New)
AWDT 266 (133) 167 (150) 433 (283)
PM Peak Enter 13 (6) 4 (4) 17 (10)
PM Peak Exit 16 (8) 21 (18) 37 (2~
PM Total 29 (l4) 25 (22) 54 (3~
B. Trip Distribution Pattern
Trip distribution describes the processby which project generated trips are dispersed onto
the street network surrounding the site. Site generated [rips aze expected to follow the
Vip pattern shown in Figure 4 on the following page. Note that the total project volumes
should have an effect only at [he entrance intersections and the Yelm Ave/Plaza Dr
intersection, while net new trips were applied to al] other intersections. Also note that
10
I -
o°~
~~ ~ -
N ~~
~o 0
1 ~' ~ ~ e
n
~ ~ e L ~ ~ _ a
s=~' i
e~ ~~ ~
~e
~ ~ ~~`° '~ \ ~'~i
5~
s~
aan ~,
N
O~ n~ ~O N.
9~ Q ~-IO ~
L~~~JJJ ~
2
O O O
<-. ~ Ala ~
o- /I o~ sroa Fo
TOTAL TRIPS - PM PEAK ~ ~ =~j \ ~ • ~o
INBOUND: 1~VPH \\ T
OUTBOUND: 37 VPH
NEW TRIPS - PM PFAK
INBOUND: IO VPH
oureourvD. zs vPn
SH
,on
n~ 1
0
~, t
YELM PLAZA Nore. rora~ rRIPS APPUeD To PRO~ecr ErvrRANCe AND YELM avE i Pv~zA DR
HEATH & ASSOCIA'PES, INC rwP OISTP~BUrIONrnssleNMeNr
Transportation and Civil Engineering
FIGURE 4
ly~O
N ~~ ~ ~=9j
~~
,0I 0 0
zas~ ~ ~eaa
~~ 1 ~~
oa>
YELM PIAZA
,o~ ~
~5 ,.,~a
oy
o~
~~°
o~
o~
~ ~,'\p6~
~~•' 1 ~~
260 ~ X255
~~1~~
ao
HEATH & ASSOCIATES, ]NC
Transport atlon end Civil Engineering
a a 3
O~ ~ ~3
269 O ~-2
~~1~~
PIPELINE VOLUMES
FIWRE 5
i _
6 ,/~.%
N i~~~_
*~~
26 4 35
2B~ ~ ~20
6B~ ~ EBB,
~~1~~
0 9 32
YELM PLAZA
~, 6\,~
6~ ^V p
3 ~ `
~° ' ~6
y ~~
6~
°~
/ (5~2 <B 92 \
56J ` ~5]
924 ~ X826
\~, t ~~
65 0 59
05 O 21
142 ~40P~ F949
~~,t~j
HEATH & ASSOCIATES, ]NC zoos PM PeAK noun vowMes wrtnour Pree~ecr
Transportation and Civil Engineering
FIGURE 6
i~ ~ ~
{~ ss ~~ 1 >
,~~ ~
2 66 69
N ~ -
O 3
~~~ ~ 3 ~~~3A ~~
O
•~O + L
~2 ~ B
O f O
q ~ ~96
6~1~~~ ~g2
~. ~ 3 32 43
Q N
> p
~~ ~ 328 ~~ U1 J1
i]2~ ~ 897 K
O
B~i f ~6n 5~2I 4B 92 ~
10 5 32 36J ~ ~3] 53 O 21
928 ~ FB3B 55~ ~ ~38
153 ~ ~36 in42~ SNP X949
42 35
163 40 60 ~~ ~ ~~
YELM PLAZA
HEATH & ASSOCIATES, ]NC zaoe Pm PEnK noun vowMes unrn PRaea
Transportation end Civil Engineering
FIGURE ~
easterly outbound project traffic is expected to use the backdoor entrance to make a
southbound left turn at the signalized intersection of Yelm Ave/Creek St, instead of the
difficult southbound lefr turn at the unsignalized intersection of Yelm Ave/Plaza Dr.
Also note that the Plaza Dr/! 03rd Ave intersection identified by the City of Yelm is
expected to only receive 6 PM peak hour trips which is below the typical study threshold,
and was therefore not analyzed for LOS.
C. Peak Hour Volumes With and Without the Project
Completion of this subdivision is expected by the year 2008, therefore, future traffic
volumes for the 2008 horizon year were targeted and analyzed. Baseline 2008 peak hour
volumes without the project were derived by applying a 2 percent growth rate per year to
the existing volumes of Figure 3. The traffic from several pipeline projects were also
considered for fuwre volumes. These projects include Willow Glen 3, 'Cerra Valley,
Tahoma Terra, Wal-Mart, Green Village, Mt. Shadow, and Mt Sunrise. Pipeline
volumes are found in Figure 5. 2008 intersection volumes without the project
(background growth plus pipeline volumes) are given in Figure 6, while 2008 volumes
with the project aze shown in Figure 7. Note that future volumes at the Plaza Dr/Entrance
intersection aze based on an assumption of existing turning volumes for the entrance.
D. Level of Service
A level of service analysis was made of the future peak hour volumes with and without
project generated [rips added [o the primary intersections and entrance nodes. Results for
intersection delay conditions were determined again through the use of the Signal 2000
and HCM 2000 programs. A summary of the analysis results is shown in Table 3 on the
following page. Again, since Plaza Dr/103rd Ave would only receive 6 PM peak hour
project trips, the intersection was not analyzed for LOS.
The 2008 LOS analysis both with and without the project indicate 3 approaches with high
delays of LOS E or F. Northbound and southbound delays at the Yelm Ave/Plaza Dr
intersection are calculated at LOS F without or with project traffic added. With the
additional through volumes on Yelm Avenue from growth and pipeline, the minor street
left Lora movements ti'om Plaza would incur heavy delays. However, both of these
movements have routing options [hat would shift the Icft turn to a signalized location.
Southbound left turns have the option of using Algiers Drive or the internal access road to
shifr over to Creek Street which is signalized at Yelm Avenue. Northbound left toms
have the option of moving west internally through the Safeway lot to shifr over to Vancil
Road, which is signalized at Yelm Avenue. These shifrs may be expected to became
attractive as through volumes ou Yelm Avenue increase. An analysis of Yelm/Plaza Dr
with southbound left tom volumes shifted as described above results in southbound
delays reduced to LOS C at 20 seconds.
Other future intersection delays are generally in the LOS A to LOS D range
I5
TABLE 3
Future 2008 Level of Service
Delays given in seconds per vehicle
Without Proiec[ With Project
Intersection Control Geometry LOS Delay LOS Delay
Yelm/Plaza Dr Stop Northbound F 78.2 F 81.7
Southbound F >1000 F >1000
Eastbound LT B 10.7 B 10.8
Westbound LT B 13.2 B 13.2
Yelm/Vancil Rd Signal Southbound C 30.0 C 30.0
Westbound C 24.9 C 26.0
Northbound D 35.5 D 35.5
Eastbound C 34.7 D 35.4
Overall C 30.8 C 31.5
Yelm/103rd Ave Stop Westbound E 42.7 E 43.5
Eastbound D 26.6 D 26.7
Northbomd LT B 11.7 B 11.7
Southbound LT B 12.8 B 12.9
Yelm/Clazk Rd Signal Southbound C 26.9 C 26.9
Westbound A 4.1 A 4.2
Northbound C 27.0 C 27.0
Eastbound B 13.0 B 13.4
Overall B 10.1 B 10.3
Yelm/4th St Stop Northbound D 29.0 D 29.3
Southbound D 30.9 D 31.3
Eastbound B 10.8 B 10.8
Westbound B 11.5 B 11.5
Plaza/Entrance Stop Westbound - - A 9.3
Southbound - - A 7.4
E. Left Tum Lane Warrants
Lefr tam lanes are a means of providing a necessary storage azea for left taming vehicles
at intersections. Methods have been developed by vaziws agencies [o determine under
what circumstances a left [um lane would be needed. For this impact study, procedures
from the WSDOT Design Manual, Figure 910-9a would be used to ascertain storage
requirements on Plaza Drive a[ the project entrance. The analysis indicates that a left turn
lane is not warzanted based on the low volumes. Refer to the appendix for Figure 910-9a
and the applicable input values.
t6
V. CONCL USIONS AND MITIGATION
The Yelm Plaza project proposes to add 3office-retail buildings for a total of 12,000
square feet of building azea, split with 6,000 retail and 6,000 office. The site is located on
the east side of Plaza Drive and north of Yelm Avenue in the City of Yelm. Access to
Plaza Drive and Creek Street is through shazed existing driveways. This project is
expected to have an average of 433 total trip movements during a typical weekday, 283 of
which would be new to the street system. An estimated 54 total trips aze expected during
the PM peak hour, 36 of which would be new to the street system.
Several intersections were reviewed for LOS. Based on [his review, some slight increases
in delay may be expected due to [he addition of project traffic. As calculated, southbound
delays on Plaza Drive at Yelm Avenue may be heary, however, shifring of lefr turn
volumes to the signal at Creek SUYeIm Ave would reduce southbound delays at Plaza to
LOS C. Sight distance at the project entrances is adequate. A left tum lane is not
warranted on Plaza Drive. Based on this analysis the following mitigation is identified:
1. Provide the city of Yelm mitigation fee for 36 net new PM peak hour trips
No other mitigation is identified.
17
YELM PLAZA
TRAFFIC IMPACT ANALYSIS
APPENDIX
18
LEVEL OF SERVICE
The following are excerpts from the 2000 Highway Capacity Manual -Transportation
Research Baard Special Report 209.
Quality of service requires quantitative measures to chazacterize operational conditions
within a traffic stream. Level ofservice (LOS) is a quality measure describing
operational conditions within a traffic stream, generally in terms of such service measures
as speed and travel time, freedom to maneuver, traffic interruptions, and comfort and
convenience.
Six LOS aze defined for each type of facility that has analysis procedures available.
Letters designate each level, from A to F, with LOS A representing the best operating
conditions and LOS F [he worst. Each level ofservice represents a range of operating
conditions and the driver's perception of those conditions.
Level-of-Service definitions
The following deftnitions generally define the various levels ofservice for arterials.
Level of service A represents primarily free-flow operations a[ average travel speeds,
usually about 90 percent of the free-flow speed for the arterial classification. Vehicles are
seldom impeded in their ability to maneuver in the traffic stream. Delay a[ signalized
intersections is minimal.
Leve[ of service B represents reasonably unimpeded operations at average travel speeds,
usually about 70 percent of the free-flow speed for the arterial classification. The ability
to maneuver in the traffic stream is only slightly restricted and delays are not bothersome.
Leve! ofservice C represents stable operations; however, ability to maneuver and change
lanes in midblock locations may be more restricted than in LOS B, and longer queues,
adverse signal coordination, or both may contribute to lower average travel speeds of
about 50 percent of the average free-flow speed for the arterial classification.
Leve! ofservice D borders on a range in which small increases in flow may cause
substantial increases in approach delay and hence decreases in arterial speed. LOS D may
be due to adverse signal progression, inappropriate signal timing, high volumes, or some
combination of these. Average [ravel speeds are about 40 percent of free-flow speed.
Level ofservice E is chazacterized by significant delays and average travel speeds of one-
third the free-flow speed or less. Such operations are caused by some combination of
adverse progression, high signal density, high volumes, extensive delays at critical
intersections, and inappropriate signal timing.
19
Level oJservice F chazacterizes arterial flow at extremely low speeds, from less than one-
third to one-quarter of the free-flow speed. Intersection congestion is likely at critical
signalized locations, with long delays and extensive queuing.
These definitions are general and conceptual in nature, and they apply primarily to
uninterrupted flow. Levels of service for interrupted flow facilities vary widely in terms
of both the user s perception of service quality and the operational variables used to
describe them.
For each type of facility, levels of service are defined based on one or more operational
parameters that best describe operating quality for the subject facility type. While the
concept of level of service attempts [o address a wide range of operating conditions,
limitations on data collection and availability make i[ impractical to treat the full range of
operational pazameters for every type of facility. The parameters selected to define levels
of service for each facility type are called "measures of effectiveness" or "MOE's'", and
represent available measures that best describe [he quality of operation on the subject
facility type.
Each level of service represents a range of conditions, as defined by a range in the
parameters given. Thus, a level of service is not a discrete condition, but rather a range of
conditions for which boundaries are established.
The following tables describe levels of service for signalized and unsignalized
intersections. Level of service for signalized intersections is defined in terms of ayeraPe
control delav. Delay is a measure of driver discomfort, frustration, fuel consumption and
lost travel time, as well as time from movements at slower speeds and stops on
intersection approaches as vehicles move up in queue position or slow down upstream of
an intersection. Level of service for unsignalized intersections is determined by the
computed or measured control delay and is determined for each minor movement.
Signalized Intersections -Level of Service
Control Delay per
Level of Service Vehicle (sect
A <_ 10
B > 10 and <20
C > 20 and <_ 35
D > 35 and <55
E > 55 and <_ 80
F > 80
zo
Unsignalized Intersectrons - Lever of Service
Average Tota] Delay
Level of Service per Vehicle (sec)
A <_ 10
B >10 and <_15
C > 15 and <25
D > 25 and <35
E > 35 and 550
> 50
As described in the 2000 Highway Capacity Manual, level of service breakpoints for al]-
way stop controlled (AWSC) intersections are somewhat different than the criteria used
for signalized intersections. The primary reason for this difference is that drivers expect
different levels of performance from distinct kinds of transportation facilities. The
expectation is that a signalized intersection is designed to carry higher traffic volumes
than an AWSC intersection. Thus a higher level of control delay is acceptable a[ a
signalized intersection for the same level of service.
AWSC Intersections -Level of Service
Average Total Delay
Level of Service per Vehicle (sec)
A <_ 10
> l0 and <15
> 15 and 525
> 25 and <_ 35
> 35 and 5 50
> 50
21
609 d iaiol
TABLE 15.40,030.8.1. (Coat.)
771A° GENERATION RATE DEITAUTA' VALUES -
P.M. PEAR HOUR
ana uaea
0.48.999 c
60 000.99 999
t
ft Uait of
Measure
"
ftIGLA
R/GLA Baeic Rate
PM Peak
Tripa~CJait
.10.16
7.28 Nea
Tripe %
b5°h
58°h Naw
Trip gate
6.68
400
100 000 -198.988 ft R!GLA b.66 60% 8.40
200 000 • Z99 99 R ft/GLA 4.71 6b°.5 6.06
800 000.899 9 s R a R/G 416 70x 2.91
aver QOO.OOOa '$ a GLA. 8.68 76% 276
s ket R/GLA l9. 7sx ras
Coavesdeam 7laerkat
D' artmeat Stole
Retell Sales
Fnaaitme sane
Car bake • NeaRJeed A
RIGFA
s ttIGFA
RfG A
ftfGFA 65.98
7.78
4.80
.s9
2,82 45%
~ SD%
60%
s9x
8076 18
8.90
240
6.26
2.10
Conuaeriai- ..
AdmWs6vtim .
to 9.
10,000-49 999
60 000-99 999 R
ft
R e tt/GFA
SfGFA
e $fGFA 4.09
2.66
2.00 90x
9
90% 8.88
2.90
L80
100,000.189.899 s ft R!GF'A L67 0%
200000.298 9 ft R2§FA L4B 90% 1.31
aver 800,000 ft RKiFA 1.29 90% Ll6
MediOal Offics/C9aSa RN3FA 4.08 75x 8.06
Indastriai
lad R!(}FA ~ ~ 0.98 100% ~ .98
Tadostrfal Park s R/GFA 0.96 100% 0.98
WaxehoualnelStoraee eq R/GFA 0.74 _ .. 100% 0.74
"For uses with Vnit of Measure in "sq ftlGFA" or "s4 ft/GLA"~ tr+P rate is Riven es tripe per 1000 a4 ft of
g=oes floor aces (GFA) or eroas leseeale area (GLA).
(c\dsta\6064706.ta6)
Ciry of Yelm
ONinencc 62p
March 23. 1998
Pace s
600/600'd 618ad bbl£ 85b 09£ A330 WVmJ-Wl3A d0 A1ll SI~ZI IOOZ-LZ-]30
Summary of Trip Generation Calculation
For 6 T.G.L. A. of Specialty Retail Center
April 04, 2006
Average
Rate Standard
Deviation Adjustment
Factor Driveway
Volume
Avg. Weekday 2-Way Volume 44. 32 15 .52 1. 00 266
7-9 AM Peak Hour Enter 0. 00 0 .00 1. 00 0
7-9 AM Peak Hour Exit 0. 00 0 .00 1. 00 0
7-9 AM Peak Hour Total 0. 00 0 .00 1. 00 0
4-6 PM Peak Hour Enter 1. 19 0 .00 1. 00 7
4-6 PM Peak Hour Exit 1. 52 0 .00 1. 00 9
4-6 PM Peak Hour Total 2. 71 1 .83 1. 00 16
AM Pk Hr, Generator, Enter 3. 28 0 .00 1. 00 20
AM Pk Hr, Generat ox, Exit 3. 56 0 .00 1. 00 21
AM Pk Hr, Generator, Total 6. 89 3 .55 1. 00 91
PM Pk Hr, Generator, Enter 2. 81 0 .00 1. 00 17
PM Pk Hr, Generator, Exit 2. 21 0 .00 1. 00 13
PM Pk Hr, Generator, Total 5. 02 2 .31 1. 00 30
Saturday 2-Way Volume 92. 09 13 .97 1. 00 252
Saturday Peak Hour Enter 0. 00 0 .00 1. 00 0
Saturday Peak Hour Exit 0. 00 0 .00 1. 00 0
Saturday Peak Hour Total 0. 00 0 .00 1. 00 0
Sunday 2-Way Volume 20. 43 10 .27 1. 00 123
Sunday Peak Hour Enter 0. 00 0 .00 1. 00 0
Sunday Peak Hour Exit 0. 00 0. 00 1. 00 0
Sunday Peak Hour Total 0. 00 0. 00 1. 00 0
Note: A zero indicates no data available.
Source: Institute of Transportation Engineers
Trip Generation, 7th Edition, 2003.
TRIP GENERATION BY MICAOTRANS
SUMMARY OF TRIP GENERATION CALCULATION
FOR 6 TH.GR.SQ.FT. OF GENERAL OFFICE
DRIVE
AVE RAGE STANDARD ADJUSTMENT WAY
RATE DEVIATION FACTOR VOLUME
AVG WKDY 2-WAY VOL 27 .88 0. 00 1 .00 16
7-9 AM PK HR ENTER 3 .18 0. 00 1 .00 19
7-9 AM PK HR EXIT 0 .39 0. 00 1 .00 2
7-9 AM PK HR TOTAL 3 .58 0. 00 1 .00 21
4-6 PM PK HR ENTER 0 .66 0. 00 1 .00 4
4-6 PM PK HR EXIT 3 .23 0. 00 1 .00 19
4-6 PM PK HR TOTAL 3 .90 0. 00 1. 00 23
AM GEN PK HR ENTER 0 .00 0. 00 1. 00 0
AM GEN PK HR EXIT 0 .00 0. 00 1. 00 0
AM GEN PK HR TOTAL 0 .00 0. 00 1. 00 0
PM GEN PK HR ENTER 0 .00 0. 00 1. 00 0
PM GEN PK HR EXIT 0 .00 0. 00 1. 00 0
PM GEN PK HR TOTAL 0 .00 0. 00 1. 00 0
SATURDAY 2-WAY VOL 2 .37 0. 00 1. 00 14
PK HR ENTER 0 .22 0. 00 1. 00 1
PK HR EXIT 0. 19 0. 00 1. 00 1
PK HR TOTAL 0. 41 0. 00 1. 00 2
SUNDAY 2-WAY VOL 0. 98 0. 00 1. 00 6
PK HR ENTER 0. 08 0. 00 1. 00 0
PK HR EXIT 0. 06 0. 00 1. 00 0
PK HR TOTAL 0. 14 0. 00 1. 00 1
Note: A zero rate indicates no rate data available
The above rates were calculated fr om the following equations:
AWD 2-Way Vol.(=<800 TGSF): Ln (T)
AWD 2-Way Vol. (>800 TGSF):
7-9 AM Pk Hr Total (=<800 TGS F):
7-9 AM Pk Hr Total
4-6 PM Pk Hk Total
4-6 PM Pk Hr Total
Sat. 2-Way Vol.:
Sat. Pk Hr Total:
Sun. 2-Way Vol.:
Sun. Pk Hr Total:
(>800 TGS F):
(>800 TGSF):
T = 0.41 * A,
T = 0.14 * A,
= 0. 756Ln (A) + 3 .765, R"2 = 0.82
T = 8.46 * A
Ln (T) = 0. 777Ln (A) + 1 .674
R"2 = 0.61, 89°s Enter, 11$ Exit
T = 1.2 * A, 89& Enter, 11% Exit
Ln (T) = 0. 737Ln(A) + 1 .831
R"2 = 0.78, 17$ Enter, 83% Exit
T = 1 .08 * A, 17% Enter, 83% Exit
T = 2. 37 * A, S.D . = 2.06
S.D. = 0.68, 548 Enter, 46% Exit
T = 0. 98 * A, S.D . = 1.29
S.D. = 0.38, 58% Enter, 42% Exit
Source: Institute of Transportation Engineers
Trip Generation, 5th Edition, 1991.
TRIP GENERATION BY MICROTRANS
Heath & Associates Inc.
2214 Tacoma Road
Puyallup, WA 98371 File Name : 2586a
Site Code :00002586
Start Date :04/11/2006
Page No : 1
PLAZA DR NE __ _ _
~ _ _
~~ SR-507 PLAZA DR NE SR-507
Southbound wearooand Northbound Easibountl
SWrt Time Ri ht Thm Lek Ri ht _Thru
- Lek Ri ht Thru
- LeN Ri ht Thru Lek InL Total
Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 ~ 1.0
- 1.0 1.0 1.0 1.0
04:00 PM 9 0 2 7 154 25 28 ~~ i fi 10 178 9 429
04:15 PM 10 1 2 10 159 27 30 1 9 12 192 7 460
04;30 PM 11 0 0 3 164 28 27 1 3 8 165 10 420
04;45 PM 8 0 _ _ _ 7
~ _ 8 169 38 38 0 2 9 186 12 479
Total 38 1 11
~ 28 fi46 118 ' _
~ 123 3 20 ~ 39 723 38 7788
36
05:45 PM 15
~ 3 2 9 143 _ _ 30 4
Total
41
3
12
28
638
722
141 6 ~ 5 39 73 43 1832
Grand Total 79 4 23 56 1284 240 264 9 25 78 1457 81 3600
Apprch Yo 74.5 3.8 21.7 3.5 81.3 15 2 88.6 3.0 8 4 4.8 90.2 5.0
Total Yo
2.2
0.1
O 6
1.6
35.7
6 7
7.3
0.3
0.7
2.2
40.5
2.3 Gmu sprinted-Unshifletl
'. PIMA OR NE
ON In TNaI
tab tOfi -252
]9 d 13
RI M Thrv Lell
d-j' 1 4
%~ ms ~ ~o
Nodh
ac c~ l11/2006d 00;00 PM ~~v -u
¢ ~ It1/20a6565;00 PM ~ a~
p~ ¢ r go
N 5 m ~ ~ llnlvllal _.~ - # s
li I
~~ ~a T~rv Ri m
I 25 9 26d
222 288 620
oa m raa
Heath & Associateslnc.
2214 Tacoma Road
Puyallup, WA 98371
File Name : 2586a
Site Code :00002586
Start Date :04/11/2006
Page No : 2
PIAZA DR NE - SR-50] PIAZA DR NE SR-50]
Southbountl Westbound Notlhbountl Easibountl
Slart Time Right Thru Lek MP' Right Thru Lek APP' Right Thm Lek APP' Right Thru Lek APP'
Total Total Total Total
Inl
Total
Intersection V 04:45 PM ~~ ,V
Volume 34 0 1] 51 2] 664 130 821 148 2 5 155 40 ]48 45 8331 1860
Percent 66.7 0.0 33.3 3.3 80.9 15.8 95.5 7.3 3.2 4.8 89.8 54 j
05:00 8 0 3 11 6 1]6 27 209 36 1 2 39 8 207 18 233 492
Volume
Peak Factor 0.945
High Int. 04:45 PM 04:45 PM 04.45 PM 05:00 PM
Volume 8 0 7 75 8 169 38 215 38 0 2 40 8 207 18 233
Peak Factor 0.850 0.955 0.969 0.894
: -- PIMA OF NE
ON In TN&
74 51 125
~34 0 P
Ri M TMa Leh
1~ 1 ~,
_---- ~~-
s~ ~ T ~o
:~ ~p s
Notlh 3 v
~~ nF~ /11/20o5665WPM 1-~m u~
n /11200553(1 CO PM > >
"~ ~ tt~ UnsMflM
Ol ~' g
@@
I h
LM Thru RIM ~'
5 2 140
Ali 90 155 325
ON In Tdel
P
Heath & Associates Inc.
2214 Tacoma Road
Puyallup, WA 98371 File Name : untitled2
Site Code :00002586
Start Date :04/12/2006
Page No : 1
Groups Printed- Unshifted
VANCIL RD SE SR-507 VANCIL RD SE SR-507
Southbountl Westbountl Northbountl Easfbountl
Start Time Ri ht Thm Left Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Int. TOtal
Factor 1.0 1.0 1.0 1.0 1.0 7.0 1.0 1.0 1.0 1.0 1.0 1.0
04:00 PM 16 14 17 7 154 14 13 2 26 22 ifi4 17 460
04:15 PM 13 7 11 17 134 5 13 15 44 38 159 17 473
04:30 PM 9 16 19 13 125 7 1fi 9 42 47 167 12 482
04:45 PM 15 11 28 12 152 8 7 8 28 29 150 15 463
Total 53 48 75 49 565 34 49 34 140 136 640 55 1878
05:00 PM 13 12 30 13 138 11 1] 6 45 37 162 10 494
05:15 PM 7 9 20 14 128 5 13 4 32 35 170 12 449
05:30 PM 14 13 20 10 117 12 8 10 37 32 188 10 471
05:45 PM 15 13 14 10 131 13 14 2 38 36 150 9 445
Total 49 47 84 47 514 41 52 22 152 140 670 41 1859
G 19 3737
A
h 2 2 2 1
5 6 6 26
TOta
l°h 2.7 2.5 4.3 26 289 2.O 27 1 78 74 35
VANCIL RD SE
ON In TM9
P65 ]56 804 '.
102 95 159
Right Thru LiX
4f ~ Y
l
s~ s i p 0~
w ~ No4n ~ P
~`~ mF~ 1v2oosaoaaa PM ~~~ U=u
1v20W 545 W PM o
Non „~..1 UnaMXm ~~~ ~go
Lj ~ ~
•I
I
Leff Tllm Ri M I
' 292 56 101
® d49 095 I
ON In Tula'
VANCIL RO SE
Heath & Associates Inc.
2214 Tacoma Road
Puyallup, WA 98371 File Name : untitled2
Site Code :00002586
Start Date :04/12/2006
Page No : 2
VSOWhbomdE Wesbound VNOrthbouotl6 --~ Easbwntl
Start Time
Right Thru Left
T
Right
Thm
LeN
T
Right
Thru
Lek
T ~
Right
Thru
Lek
~P' l
l
t
otal otal ~ I T
t
l
Peak Nour From 04:00 PM to 05'45 PM -Pea k 1 of 1
Intersection 04:15 PM
Volume 50 46 88 184 55 549 31 635 53 38 159 250 151 638 54 843 1912
Percent 27.2 25.0 47.8 8.7 86.5 4.9 21.2 15.2 63.6 17.9 75.7 6.4
05:00 13 72 30 55 13 138 71 162 17 6 45 68 37 162 10 209 494
Volume
Peak Factor 0.968
High Int. 05:00 PM 04:45 PM 04:15 PM 0430 PM
Volume 13 12 30 55 12 152 8 172 13 15 44 72 47 167 12 226
Peak Factor 0.836 0.9231 0.868 0.933
VANQL RD ~E
Oul In Total
id] ,__1Bd J31
50 45 BB
Right Thrv LeX
Y'I
__ _
S~~ 1 ~p
LLII ~~~ N ~A 5
~~m mF~ 1220g6415'og PM 4-?m
1P2gga 500 Po PM u
o~ ^ ~ IlnaM1fte] ~ rma u ~m
_..___-I
I
d~
LeX Thm Ri M
159 3B 53
P28 250 d]9
I ON In Tolal
Heath & Associates Inc.
2214 Tacoma Road
Puyallup, WA 98371 File Name : 2382b
Site Code :00002382
Start Date :05/23/2005
Page No : 1
Greuos Printetl- Unshifletl
- HELM AVE 103RD AVE SE VELM AVE ENTRANCE
8outhbountl Wesibountl Northbountl Easibountl
Start Time Ri hl Thru Left R' ht Thru Lett Ri ht Thru Lefl Ri ht Thru Lefl Inl. TOtal
Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
04:00 PM 0 212 15 11 0 3 5 167 0 0 0 0 407
04:15 PM 1 245 20 9 0 7 ] 175 3 2 0 0 463
04:30 PM 0 209 14 19 0 5 5 194 0 2 0 0 448
04:45 PM 0 238 23 21 0 3 4 180 2 3 0 0 474
Total 1 904 72 60 0 12 21 710 5 7 0 0 1792
15 35 0
05:30 PM 0 200 19 0 2 3 2 1 1 0 O 468
05:45 PM 1 198 14 7 0 3 5 169 0 3 0 0 420
Total 4 837 55 57 0 10 16 817 1 8 1 0 1806
Grantl Total 5 1741 12] 117 0 22 37 1527 6 15 1 0 3598
Appmh % 0 3 93.0 6.8 84.2 0.0 15.8 2.4 97.3 0.4 93.8 fi.3 0 0
Total % 0.1 48.4 3.5 3.3 0.0 0.6 1.0 42.4 0.2 0.4 0.0 00
VELM NVE
ON In TN& I
1644 1B]3 J51]
5 1741 12] ~I
' 9M TM1~u leX I
J 1
50 ~s T 0~
NMh
~= J ~' _o
~- ~,?-~ 22naas 4.W:00 PM 4-~ ~'m
2 ~ 2]/2WSS4500 PM o ~n
&~m
W O~ ~ ~ VnsMM1M r~ ~ ~o
I 4, •I
I I
LeH TMU Ri M
i 6 152] 3]
I' 9)8 15]0 J34B
ON In Td 1
Heath & Associates Inc.
2214 Tacoma Road
Puyallup, WA 98371
File Name : 2382b
Site Code :00002382
Stag Date :05/23/2005
Page No :2
Slart Time Right Thru Lek Total Right Thru Lek Total Right Thru Lek Total Right Thru Lek Total Total
'eak Hcur From 04:00 PM to 05:45 PM -Pea k 1 of 1
Intersection 04:45 PM
Volume 3 877 64 944 71 0 10 81 15 808 3 826 8 1 0 9i 1860
Percent 0.3 92.9 6.8 87.7 0.0 12.3 1.8 97.8 04 88.9 11.1 0.0 'I
~ 0 23B 23 261 21 0 3 24 4 780 2 186 3 0 0 3i~ 474
Vo
me ~ ~
Peak Factor 0 981
High Int. 04:45 PM 04:45 PM 05:30 PM 04:45 PM
Volume 0 238 23 261 21 0 3 24 3 235 1 239 ~ 3 0 0 3
Peak FaMOr 0.904 0.844 I
0.8641 0.750
~, YELM AVE '~
OB]9 19LG 1823
3 0]] W
R!~qM Tlw Leff
1 1 4
NottM1 3,
U ll
4a-`m 'cam PY20]5d45'.,W PM f-~ mom
~ I'!Y1W55]eW PM
W 50~ m ~ llnalvfla] r~ ~'m a
I I
Leff TM1rv Ri M
' 9 BoB t5
i __895 ~~-836 1]31
ON In Total
Heath 8 Associates Inc.
2214 Tacoma Road
Puyallup, WA 98371 File Name : untitled2
Site Code :00002586
Start Date :04/13/2006
Page No : 1
Grou s Printetl- Unshifietl
PRAIRIE PARK ST SR-507 CLARK RD SE SR-507
Southbound Westbound NoMbountl Eastbound
Start Time Ri ht Thru Leff Ri ht Thru Lefi Ri ht Thru Lefi Ri ht Thru left Int. Total
Factor 1.0 1.0 10 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
04:00 PM 6 0 10 4 _
157 ~ 10 8 2 2 2 249 7 457
04:75 PM 6 1 7 7 143 11 4 t 3 2 239 6 430
04.30 PM 6 2 9 7 156 20 6 2 2 1 202 7 420
04:45 PM 7 1 8 9 163 12 9 0 1 3 19fi 7 416
Total 25 4 34 27 fii9 53 27 5 8 8 886 27 7723
05:00 PM 6 4 9 11 167 14 9 0 4 2 215 5 446
05:15 PM 6 0 8 4 151 27 13 2 5 1 202 8 427
05:30 PM 4 0 6 2 130 8 5 2 3 1 179 4 344
0545 PM 3 2 3 7 187 15 16 0 6 4 195 2 440
_
Total _
79 6 26 24 635 64 43 4 18 8 791 19 1657
Grantl TOtal 44 10 60 51 1254 111 70 9 26 i6 1677 46 3380
Apprch % 38.6 8.8 52.6 3.6 88.2 1
8.2 66 7 8.6 24 8 0.9 96.4 26
Total% 1.3 0.3 1.8 t5 3z1 35 2.1 0.3 O.Bi 0.5 49.6 1.4
PMIRIE PARK ST
ON In ToW
1as 1u ao
14 10 60
RIgM Tllrv Leff
Y'I 1 IY
s0 .~s ? ~ 0~
NonM1 3 U
~ ~c-/' NL20W OOOWPM /--2o a5
~ NL30C6505 W PM ~+
N~0 ~~ . ~~R6~ r~_ ~go
I
1~I
LeX TM1,u9 Ri M
26
1<3 105 P<B
ON In Tola~ I
R
Heath & Associates Inc.
2214 Tacoma Road
Puyallup, WA 98371
File Name : untitled2
Site Code :00002586
Start Date :04/13/2006
Page No : 2
Stall Time Right Thru Left Total Right Thm Leff Total Right Thru Left 1o ai Right Thm Left Total Total
Peak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1
Intersection 04:00 PM
Volume 25 4
Percent 39.7 6.3 54.
04'.00 6 0 1
Volume
Peak Factor
High Int. 04'.30 PM
Volume 6 2
Peak Factor
PRAIRIE DARK ST
ON In Taa
59 6] 122 I
25 0 3C
R'igM TM1iu Lel li
4f 1 Y
-_ ~___.
~0 ~ T ~ ~o
~~ M nh
` mt~ nBrzaofi4ao oa vm t-z~ asN
' n6rzaos 446 oo vm e
Ns~ m~ u~uMnea r~U
o ~~V
'1 T N
Leff TM1m RIM I
B 5 Z]
66 00 105
ON In TMaI
4 63 27 619 53 699 27 5 8 40 8 886 27 921 1723
0 3.9 88.fi 7.6 67.5 12.5 20.0 0.9 962 2.9
0 i6 4 157 10 171. B 2 2 12 2 249 7 258 457
~ 0.943
04.45 PM 04:00 PM 04:00 PM
9 17 9 763 12 1841 8 2 2 12 2 249 7 258
0.926 0.950 0.833 0.892 3
Heath & Associates Inc.
2214 Tacoma Road
Puyallup, WA 98371 File Name : untitled2
Site Code :00002586
Start Date :04/18/2006
Page No : 1
Groups Printed- Unshiketl
4TH ST NE SR-507 4TH ST SE SR-507 - ~
Southbound Westbound Nort hbound Easibcuntl
Start Time Ri ht Thru Lek R' hl Thru _ Lek Ri ht Thru Lek Ri hl Thru Lek InL Total
Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 7.0 1.0 1.0 1.0 1.0
04:00 PM 0 0 1 3 _
212 _
~ 0 0 0 0 2 213 2 433
04:15 PM 2 0 2 2 167 2 1 0 1 0 226 1 424
04:30 PM 3 0 0 3 207 0 1 0 0 1 247 2 456
_ 04:45 PM 0 0 3 3 181 0 2_ 0 0 0 230 3 422
Total 5 0 6 11 787 2 4 _
0 - 1 3 910 8 1737
05:00 PM 3 0 0 3 207 0 2 0 2 0 240 0 457
05:15 PM 2 0 t 4 177 2 0 0 0 0 233 4 423
05:30 PM 1 0 0 4 176 4 1 0 0 0 255 1 442
_ 05:45 PM 2 0 t 0 180 1 0 0 0 0 230 1 415
Total 8 0 2 11 740 7 3 0 2 0 958 6 1737
G 3474
A
h 6 3
1 7 3
1
Tot
l°h 04 00 0.2 0.6 440 0.3 0.2 0.0 0.1 0~1 538 Oq
dTH ST NE
ON In TNaI
® 21 3]
13 0 0
RIM Thrv 1.e0
4~ 1 4
j
s~ ~ T ~o
~ Noeh ~ N
~ ~OF~ 10I20W 40000 PM H-2 V u.~
/1020W 54500 PM m
p o~ " ~ ~°sMa~ ~ ~
m t: p
__ _ j
I
~i T N III
Loll TA fti M I
3 0 ]
f2 10 22'
ON In Tddl
4 T
Heath & Associates Inc.
2214 Tacoma Road
Puyallup, WA 98371
File Name : untitled2
Site Code :00002586
Start Date :04/18/2006
Page No : 2
Start Time Right Thru Lek Total Right Thru Lek Total Right Thm Lek I T a~ I Right Thru Lek Total Total
Peak Hour From 04:00 PM to OS 45 PM -Peak 1 of 1 L 1
Intersection 04:15 PM
Volume 8 0
Percent 6i.5 0.0 38.
04:30 3 0
Volume
Peak Factor
High Int. 04:15 PM
Volume 2 0
Peak Factor
0 H T NE
Oul In TWaI
1] 13 30
8 0 5
gM TNU lM
I Y'I ~ 4
I
S~ ,a~~ I * D ~S
NMh ` o
acm me-~ 16~3W841600 PM ~?~ _s
y It&]006500 00 PM u
5~ ~ UrttFifi 1 '. r~ U ~m
O
Lell TTrv RIM
] 0 6
~~ 9 12
ON In Talel
5 13 11 782 2 795 6 0 3 9 1 937 6 944 1761
5 1.4 98.4 0.3 66.7 0.0 33.3 0.1 99.3 0 6
0 3 3 207 0 210 1 0 0 1 1 241 2 244 458
0.961
04:30 PM 05:00 PM 04:30 PM
2 4 3 207 0 210 2 0 2 4 1 241 2 244
0.813 0.946 0.563 0.967
TWO-WAY STOP CONTROL SUMMARY
enersl Information ite Information
nal st Intersection Plaze Or B Yelm Ave
en ICO. urisdiction
Oate Pertormetl na sis Vear
nal sis Time Period
Howdy Flaw Rate (vehRi) 50 B40 44 135 691 28
Proportion of heavy vehicles,
PHv 1 1
Metlian type Undivided
RT Channelized? 0 0
Lanes 1 1 1 1 / 1
ontipuralion L T R L T R
Hourly Flow Rale (veh/h) 5 2 152 19 0 39
Proponion of heavy vehicles,
Rnv 0 0 0 1 1 1
Percent grade (h) 0 0
Flaretl approach N N
Storage 0 0
T Channelizetl? 0 0
ones / / 0 1 1 0
onfiguration L TR L TR
ontrol Dela Dueue Len th Level of Serv ice
pproach EB WB Northbound Southbound
Movement 1 4 ] 8 9 10 11 12
Lane Configuration L L L TR L TR
olume, v (vph) 50 135 5 154 19 39
opacity, cm (vph) 88] ]]9 38 341 21 446
/c ratio 0.06 018 013 0.45 0.90 0.09
ueue length (95%) 0.18 063 041 2.25 2.55 9.29
ontrol Delay (slveh) 9.3 f0.] 113.6 24.0 4201 13.8
LOS A B F C F B
pproach tlelay (sNeh) -- -- 26.8 146.9
pproach LOS -- -- D F
H( ]tWM+ CopyngM1l02W) Cnuanuy o(FlOnJa, AI 0.ig~u RaweY Vnmo
TWO-WAY STOP CONTROL SUMMARY
eneral Information ite Information
na sl Intersection Plaza Dr 8 Yelm Ave
en /Co. uristligion
ate Pedortnetl nal sis Vear
nal sis Time Periotl
Pro ed Descri lion 2008 PM PEAK HOUR VOLUMES WITHOUT P ROJECT
EastM/esl SVeeC Yelm AVe SR-507 Narth/South Street: Plaza Drive
Intersection Orientation Eesr-West Stutl Period hrs: 025
ehicle Volumes and Adustments
Ma or Stree[ Eastbound Weslbountl
Movement 1 2 3 4 5 6
L T R L T R
clume vehRi 4] 1042 02 135 949 31
Peak-hour factor, PHF 0.89 089 089 0.96 0.96 0.96
Hourly Flow Rate (vehRQ 52 11]0 4] 140 98B 32
Proportion of heary vehicles,
PHv 1 1 - -
Median type Undivided
RT Channelized? 0 0
Lanes 1 1 1 1 1 1
onfiguratian L T R L T R
U stream Si nal 0 0
inor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h 5 2 154 21 0 35
Peak-hcurtactor, PHF 0.9T 0.9] 0.9] 085 0.85 0.85
Hourly Flaw Rate (veh/h) 5 2 i5B 24 0 41
Proportion of heavy vehicles,
HV 0 0 0 1 1 1
ercenl grade (%) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 1 / 0 1 1 0
onfguration L TR L TR
ontrol Dela Dueue Len th Level of Serv ice
pproach EB WB Northbound Southbound
Movement 1 4 ] 8 9 10 11 12
Lane Configuration L L L TR L TR
olume, v (vph) 52 140 5 160 24 41
apacity, c,~(vph) 684 5T] 11 206 4 301
/c ratio OOH 0.24 0.45 078 6.00 0.14
ueue length (95%) 0.25 0.94 1.04 5.39 4.50 Oa]
ontrol Delay (slveh) f0.] 13.2 495.9 65.1 3952 1B.8
LOS B B F F F G
pproach delay (s/veh) -- - ]82 14]1
pproach LOS - -- F F
u<s_noo~~ rwmeni o xwr ~m.ersnr or m~~a. au a,eni, a~mm ~...~o~ <. u
TWO-WAY STOP CONTROL SUMMARY I
nal st Intersection laza Dr&Velm AVe
en /Co. urisdidicn
Date Performetl nal sis Year
nal sis Time Periotl
M'S]o00m p58 ~~~~~nivvxuy ol6lvnJa. AI 0 RawN Vemana l!
TWO-WAV STOP CONTROL SUMMARY
e.~i i..r,.....~ti,... Sites Information
nal st Intersection Plaze Dr&Yelm AVe
en ICo. uristligion
Date Performed nal sis Year
nal sis Time Period
eer_aoo~ v dr~~e zam w~re~.~ir orno~~ee. au re.es.. e.,...w i.~.~o. an
YELM COMMERCIAL
YELM AVE 6 VANCIL RD
EXISTING PM PEAK HOUR VOLUMES
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Input Worksheet
05/03/06
16:13:25
Intersection # 1 - Area Location Type: NONCBD
I I I I I I Key: VOLUMES -- >
I 50 I 46 I 88 II I WIDTHS
0.0 1 12.0 12.0 II v LANES
I 0 1 1 1 1 II __ _____ _____ _
I I I I \ 55 12.0 1
______________ / I \ _____ _____ _____ ____ /I\
__________
___ -- 599 12.0 1 I
59 12.0
________________
1 /
___
+
/ _____
31 _____
12.0 _____
1 ____ I
North
638 12.0
1 -- ____ ___ _____ __= I
________________ ___ \ I / _____ _____ ____
151 12.0 1 \ I I I I
---------------- ----- I I 159 I 38 I 53 I Phas ing: SEQUENCE 14
I I I 12.0 112 .0 1 12.0 I PERMEV N N N N
I I I 1 1 1 1 1 OVERLP N N N N
I I I I I LEADLAG LD LD
SB WB NB EB
RT TH LT RT TH LT RT TH LT RT TH LT
Heavy veh, 8HV 0 .0 0 .0 2.0 0 .0 .0 0 0 2.0 .0
Pk-hr fact, PHF .84 .84 .84 .92 .92 .92 .87 .67 .87 .93 .93 . 93
Pretimed or Act A A A A A A A A A A A A
Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2 .0
Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2 .0
Arrival typ, AT
_______________ 3
_____ 3
_____ 3 3
____ 3
_ 3
____ 3
_____ 3
__ 3 3 3 3
Ped vol, vped
0
0 __
0 _____ ____________
0 __
Bike vol, vbic 0 0 0 0
Parking locatna NO NO NO NO
Park mnvra, Nm 0 0 0 0
Bus atopa, NB 0 0 0 0
Grade, 6G .0 .0 .0 .0
__________
Sq 19 I Phase 1 ___________
Phase ___________
2 1 Phase _____
3 1 ___________
Phase 4 _______________________
Phase 5 1 Phase 6 __
1
I+++ I I I I I I
I+++ I I ++++I I I I
I I v I * ***I I I I I
I I I+++ + v I I I I I
North I <* + +>I I****> I I I I
I I •+ + I I++++ I I I I
I *+
---------- + Im
------
----- I v
------ I I I I
C= 60"I G= 13.8
" I G=
5. -----
0" I G= 29 -----
.2" -----
G= ------
0.0" ----
I G= -------------------
0.0" I G= 0.0" --
I
I Y+R= 9.0
__________ " I Y+R= 4.
___________ 0" I Y+R= 4
___________ .0" I
_____ Y+R=
_____ 0.0"
______ I Y+R= 0.0" I Y+R= 0.0"
_______________________ I
__
YELM COMMERCIAL
YELM AVE 6 VANCIL RD
EXISTING PM PEAK HOUR VOLUMES
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Volume Adjust 6 Satflow Worksheet
Volume
Adjustment
Volume, V
Pk-hr fact, PHF
Adj my flow, vp
Lane group, LG
Adj LG flow, v
Prop LT, PLT
Prop RT, PRT
Saturation
Blow Rate
Base satflo, so
Number lanes, N
Lane width, fW
Heavy veh, fHV
Grade, fg
Parking, fp
Bus block, fbb
Area type, fa
Lane util, fLU
Left-turn, fLT
Right-turn, fRT
PedBike LT,fLpb
PedBike RT,fRpb
Local adjustmnt
Adj satflow, s
05/03/06
16:13:25
SB WB NB EB
RT TH LT RT TH LT RT TH LT RT TH LT
~50 46 88 55 549 31 53 38 159 151 638 54
B9 .84 .84 .92 .92 .92 .87 .87 .87 .93 .93 .93
60 55 105 60 597 39 61 44 183 162 686 58
RT+TH LT AT TH LT RT TH LT RT TH LT
115 105 60 597 34 61 44 183 162 686 58
.000 1 .00 .000 .000 1 .00 .000 .000 1.00 .000 .000 1 .00
.522 . 000 1 .000 .000 . 000 1 .000 .000 .000 1 .000 .000 . 000
SB WB NB EB
RT TH LT RT TH LT RT TH LT RT TH LT
1900 1900 1900 1900 1 900 1900 1900 1900 1900 1900 1 900
1 1 1 1 1 1 1 1 1 1 1
1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1 .00 1.00 1 .000 1.00 1 .00
1 .000 1 .00 1 .000 .980 1 .00 1 .000 1 .00 1.00 1 .000 .980 1 .00
1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1 .00 1.00 1 .000 1.00 1 .00
1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1 .00 1.00 1 .000 1.00 1 .00
1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1 .00 1.00 1 .000 1.00 1 .00
1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1 .00 1.00 1 .000 1.00 1 .00
1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1 .00 1.00 1 .000 1.00 1 .00
1 .000 . 728 1 .000 1.00 . 950 1 .000 1 .00 .683 1 .000 1.00 . 950
.922 1 .00 .850 1.00 1 .00 .850 1 .00 1.00 .850 1.00 1 .00
1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1 .00 1.00 1 .000 1.00 1 .00
1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1 .00 1.00 1 .000 1.00 1 .00
1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1 .00 1.00 1 .000 1.00 1 .00
1751 1384 1615 1863 1805 1615 1900 1298 1615 1863 1805
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Capacity and LOS Worksheet
Capacity SB WB HH
Analysis AT TH LT RT TH LT RT TH LT
Lane group LG RT+TH LT RT TH LT RT TH LT
Adj Flow, v 115 105 60 597 34 61 44 183
Satflow, s 1751 1384 1615 1863 1805 1615 1900 1298
Lost time, tL 4.0 4.0 4.0 9.0 4.0 4.0 4.0 4.0
Effect green, g 13.8 13.8 29.2 29.2 5.0 13.8 13.8 13.8
Grn ratio, g/C .230 .230 .486 .986 .083 .230 .230 .230
LG capacity, c 409 319 785 906 150 372 438 299
v/c ratio, X .285 .329 .076 .659 .227 .164 .100 .612
Flow ratio, v/s .066 .076 .037 .320 .019 .038 .023 .191
Crit lane group
_______________
__________
____
_____
_____
____
____
_____
_____
Sum Grit v/s,Yc 0.541 Total lost, L 12.0
Crit v/c, Xc .677
EB
AT TH LT
RT TH LT
162 686 58
1615 1863 1605
4.0 4.0 4.0
29.2 29.2 5.0
.486 .486 .083
785 906 150
.206 .757 .387
.100 .368 .032
* *
______________
YELM COIMIGRCIAL
YELM AVE S VANCIL RD
EXISTING PM PEAK HOUR VOLUMES
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Capacity and LOS Worksheet
Delay
and LOS
SB
RT TH LT
05/03/06
16:13:25
WB NB EB
RT TH LT RT TH LT RT TH LT
Lane group, LG
Adj Flow, v
LG capacity, c
v/c ratio, X
Grn ratio, g/C
Unif delay, dl
Incr calib, k
Incr delay, d2
Queue Delay, d3
Unif delay, dl*
Proq factor, PF
Contrl delay, d
Lane group LOS
Final Queve,Qbi
_______________
Appr delay, dA
Approach LOS
Appr flow, vA
RT+TH LT
115 105
404 319
.285 .329
.230 .230
19.0 19.2
.11 .11
.4 .6
.0 .0
.0 .0
1.00 1.00
19.4 19.8
8 B
0
_____ 0
____
_____
19.6
B
220
RT TR LT
60 597 34
785 906 150
.076 .659 .227
.486 .486 .083
8.2 11.7 25.7
.11 .23 .11
.0 1.8 .8
.0 .0 .0
.0 .0 .0
1.00 1.00 1.00
8.3 13.4 26.5
A B+ C+
0 0 0
_____ ____
13.6 _____
B+
691
RT TH LT
61 44 183
372 438 299
.169 .100 .612
.230 .230 .230
18.5 18.2 20.7
.11 .11 .20
.2 .1 3.7
.0 .0 .0
.0 .0 .0
1.00 1.00 1.00
18.7 18.3 24.4
H B C+
0 0 0
22.2
C+
288
______________
RT TH LT
162 686 58
785 906 150
.206 .757 .387
.486 .486 .083
8.8 12.5 26.0
.11 .31 .11
.1 3.7 1.7
.0 .0 .0
.0 .0 .0
1.00 1.00 1.00
8.9 16.3 27.7
A 8 C
0 0 0
15.7
B
906
Intersection: Delay 16.3 LOS B
YELM COEAfERCIAL 05/03/06
YELM AVE S VANCIL RD 16:13:25
EXISTING PM PEAK HOUR VOLUMES
SIGNAL2000/TEAPAC[Ver 2.70.07] - Evaluation of Intersection Performance
Intersection # 1 -
________ _____________________
Sq 14 I Phase 1 1 Phase 2 1 Phase 3 1
I + + + I I ^ I
I + + + I I ++++I
I I v I +***I I
I I I++++ v I I
North I <* + +>I ****> I
I I *++ I I++++ I
I * + + Im I v I
_____________________________________
I G/C=0.230 I G/C=0.083 G/C=0.486 I
I G-- 13.8" I G= 5.0" I G= 29.2" I
I Y+R= 4.0" I Y+R= 9.0" I Y+R= 4.0" I
I Off= 0.08 I Off=29.76 I Off=94.78 I
___________________ ___
C= 60 sec G= 48.0 sec = 80.08 Y=12.0 sec = 20.08 Ped= 0.0 sec = 0.08
MVMT TOTALS SS Approach w8 Approach NB Appn
Param:Unita RT TH LT RT TH LT RT TH
AdjVOl vph 60 55 105 60 597 34 61 44
Wid/Ln:ft/# 0/0 12/1 12/1 12/1 12/1 12/1 12/1 12/1
g/C Rqd@C:8 0 10 12 6 35 9 7 4
g/C Used: 8 0 23 23 49 49 8 23 23
SV @E: vph 0 404 319 785 906 140 372 438
___________ ______________ ______________ _________
Svc Lv1:LO5 B B A B+ C+ 8 B
Deg Sat:v/c 0.00 0.28 0.33 0.08 0.66 0.23 0.16 0.10
HCM Delis/v 0.0 19.4 19.8 8.3 13.4 26.5 18.7 18.3
Tot Del:min 0 9 9 2 33 4 5 3
# Stopa:veh 0 24 22 8 113 8 12 9
Ebel: gal 0.0 0.4 0.4 0.1 1.9 0.1 0.2 0.2
CO Em: kg 0.0 0.4 0.4 0.1 1.9 0.2 0.2 0.2
___________ ______________ ______________ _________
Queue l:veh 0 3 3 1 14 1 2 1
Queue 1: ft 0 75 70 26 357 26 39 27
each EB Approach Int
LT RT TH LT Total
183 162 686 58 2105
12/1 12/1 12/1 12/1
19 14 40 6
23 49 49 8
299 785 906 140 5494
_____ ______________ _____
C+ A B C 8
0.61 0.21 0.76 0.39 0.56
24.4 8.9 16.3 27.7 16.3
19 6 46 7 143
41 23 139 14 413
0.7 0.4 2.3 0.2 6.9L
0.8 0.9 2.4 0.3 7.3L
_____ ______________ _____
5 3 18 2 16
137 74 446 46 446
YELM COIM7ERCIAL
YELM AVE 6 VANCIL RD
EXISTING PM PEAK HOUR VOLUMES
05/03/06
16:13:25
SIGNAL2000/TEAPAC[Ver 2.70.07] - Evaluation of Intersection Performance
APPR TOTALS
Param:Units
AdjVOl vph
Svc Lvl LOS
Deg Sat:v/c
HCM Delis/v
Tat Del:min
# Stops:veh
Fuel: gal
CO Em: kg
queue 1 veh
queue 1: ft
Int
SB Approach Y7B Approach NB Approach EB Approach Total
220
B
0.31
19.6
18
46
0.8
0.8
______________ ____
3
75
691 268
B+ C+
0.59 0.44
13.6 22.2
39 27
129 62
2.1 1.1
2.2
_________ 1.2
_________
19 5
357 137
906
_____________ 2105
_ _____
B B
0.63 0.56
15.7 16.3
59 193
176 913
2.9 6.9L
3.1
____ 7.3L
_ ___
_
_________
18 _
18
446 446
YELM COIMfl:RCIAL
YELM AVE 6 VANCIL RD
2008 PM PEAK HOUR VOLUMES WITHOUT PROJECT
05/03/06
16:22:41
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Input Worksheet
Intersection # 1 - Area Location Type: NONCBD
I I I I I I Hey: VOLUMES -- >
I 52 I 48 I 92 II I I WIDTHS
I 0.0 112.0 112.0 II I v LANES
I 0 1 1 1 1 II ____
I I I II \ 57 12.0 1
/ I \ _____________
-- 826 12 0 1
56
---------- 12.
---- 0
-- 1
--- /
929 12. 0 1 --
157
__________ 12.
____ 0
__ 1
___ \
__
I
I
-------------
+ / 35 12.0 1
\ I / -
I I I I
II 165 I 90 I 59 I
II 12.0 112.0 112.0 I
I I 1 1 1 1 1 1
I I I I I
/I\
I
North
I
Phasing: SEQUENCE 14
PERMSV N N N N
OVERLP N N N N
LEADLAG LD LD
SB WB NB EB
RT TH LT RT TH LT RT TH LT RT TH LT
Heavy veh 6HV 0 .0 .0 0 2.0 .0 .0 .0 .0 .0 2.0 .0
Pk-hr fact, PHF .84 .84 .84 .92 .92 .92 .87 .87 .87 .93 .93 .93
Pretimed or Act A A A A A A A A A A A A
Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival typ, AT 3
____ 3
____ 3
____ 3
_____ 3
_____ 3
____ 3
_____ 3
_____ 3
____ 3
______ 3
____ 3
____
__________
Ped vol, vped 0 0 0 0
Bike vol, vbic 0 0 0 0
Parking locatna NO NO NO NO
Park mnvrs, Nm 0 0 0 0
Bus stops, NB 0 0 0 0
Grade, 6G .0 .0 .0 .0
____________
Sq 14 I Phase 1 _____
1 Phase
2 1
Phase
3 1 ________
Phase 4 _____
1 Ph ______
ase 5 __________
1 Phase ____
6 1
I+++ I I I I I I
I+++ I I ++++I I 1 I
I I v I + +++I I I I I
I I I**** v I I I I I
North I <* + +>I I****> I I I I
I I *++ I I++++ I I I I
I *++ I I v I
---
- I I I
-
-----------
C= 90"I G= 20.0" ------
I G= ----
8. -----
1" I ------
G= 49 --
.9" I ----
G-- ------
0.0" -----
I G= ------
0.0" ------
I G-- ----
0. ---
0" I
I Y+R= 4.0"
___________ I Y+R= 4.
__________ 0" I
_____ Y+R= 4
______ .0" I
_____ Y+R=
_____ 0.0"
______ I Y+R= 0.0"
___________ I Y+R= 0.
__________ 0" I
____
YELM COMMERCIAL 05/03/06
YELM AVE 6 VANCIL RD 16:22:41
2008 PM PEAK HOUR VOLUMES WITHOUT PROJECT
SIGNAL2000/TEAPAC[Ver 2.70.077 - HCM Volume Adjust 6 Sat£low Worksheet
Volume SH WB NB EH
Adjustment RT TH LT RT TH LT RT TH LT RT TH LT
Volume, V 52 48 92 57 826 35 59 40 165 157 924 56
Pk-hr £act, PHF .84 .84 .84 .92 .92 .92 .87 . 87 .87 .93 .93 .93
Adj my flow, vp
_____ 62
_____ 57
_____
_ 110
___ 62
_____ 896
_____
_ 38
___ 68
_____
__ 46
__ 190 169 994
____
_ 60
___
Lane group, LG RT+TH LT RT TH LT RT TH LT RT TH LT
Adj LG flow, v 119 110 62 898 38 68 46 190 169 994 60
Prop LT, PLT .000 1 .00 .000 .000 1 .00 .000 .000 1.00 .000 .000 1 .00
Prop RT, PRT
_______________
_____ .521
_____ .
_ 000
___ 1 .000
_____ .000
_____ .
_ 000
___ 1 .000
_____ .000
_____ .000
____ 1 .000
____ .000
______ .
_ 000
___
Saturation SB WB NB EB
Flaw Rate RT TH LT RT TH LT RT TH LT RT TH LT
Base satflo, so 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Number lanes, N 1 1 1 1 1 1 1 1 1 1 1
Lane width, fW 1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1. 00 1.00 1 .000 1.00 1 .00
Heavy veh, fHV 1 .000 1 .00 1 .000 .980 1 .00 1 .000 1. 00 1.00 1 .000 .980 1 .00
Grade, fg 1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1. 00 1.00 1 .000 1.00 1 .00
Parking, fp 1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1. 00 1.00 1 .000 1.00 1 .00
Bus block, fbb 1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1. 00 1.00 1 .000 1.00 1 .00
Area type, fa 1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1. 00 1.00 1 .000 1.00 1 .00
Lane util, fLU 1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1. 00 1.00 1 .000 1.00 1 .00
Left-turn, fLT 1 .000 . 727 1 .000 1.00 . 950 1 .000 1. 00 .648 1 .000 1.00 . 950
Right-turn, fRT .922 1 .00 .850 1.00 1 .00 .850 1. 00 1.00 .850 1.00 1 .00
PedBike LT,fLpb 1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1. 00 1.00 1 .000 1.00 1 .00
PedBike RT,fRpb 1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1. 00 1.00 1 .000 1.00 1 .00
Local adjustmnt 1 .000 1 .00 1 .000 1.00 1 .00 1 .000 1. 00 1.00 1 .000 1.00 1 .00
Adj satflow, s 1752 1 361 1615 1863 1 805 1615 1900 1231 1615 1863 1 805
SIGNAL2000/TEAPAC [Ver 2.70.07] - HCM Capacity and LOS Worksheet
Capacity SB WB NB EB
Analysis RT TH LT RT TH LT RT TH LT AT TH LT
Lane group, LG AT+TH LT AT TH LT RT TH LT RT TH LT
Adj Flow, v 119 110 62 898 38 68 46 190 169 994 60
Satflow, s - 1752 1381 1615 1863 1805 1615 1900 1231 1615 1863 1805
Lost time, tL 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Effect green, g 20.0 20.0 99.9 49.9 8.1 20.0 20.0 20.0 99.9 99.9 8.1
Grn ratio, g/C .222 .222 .555 .555 .090 .222 .222 .222 .555 .555 .090
LG capacity, c 389 306 696 1033 163 358 422 273 896 1033 163
v/c ratio, X .306 .359 .069 .869 .233 .190 .109 .696 .189 .962 .368
Flow ratio, v/s .068 .080 .038 .482 .021 .042 .024 .154 .105 .534 .033
Crit lane group
_______________
__________
____
_____
_____
____
____
______ *
____
_____
_____
____
Sum crit v/s,YC 0.721 Total lost, L 12.0
Crit v/c, Xc .832
YELM COIMfl;RCIAL
YELM AVE 6 VANCIL RD
2008 PM PEAK HOUR VOLUMES WITHOUT PROJECT
SIGNAL2000/TEAPAC [Ver 2.70.07] - HCM Capacity and LOS Worksheet
Delay
and LOS
Lane group, LG
Adj Flow, v
LG capacity, c
v/c ratio, %
Grn ratio, g/C
Unif delay, dl
Incr calib, k
Incr delay, d2
Queue Delay, d3
Unif delay, dl*
Prog factor, PF
Contrl delay, d
Lane group LOS
Final Queue,Qbi
_______________
Appr delay, dA
Approach LOS
Appr flow, vA
SB
RT TH LT
RT+TH LT
119 110
389 306
.306 .359
.222 .222
29.2 29.6
.11 .11
.4 .7
.0 .0
.0 .0
1.00 1.00
29.7 30.3
C C
0 0
WB NB
RT TH LT RT TH LT
RT TH LT RT TH LT
62 898 38 68 96 190
896 1033 163 358 422 273
.069 .869 .233 .190 .109 .696
.555 .555 .090 .222 .222 .222
9.3 17.2 38.0 28.4 27.9 32.2
.11 .90 .11 .11 .11 .26
.0 8.1 .7 .3 .1 7.5
.0 .0 .0 .0 .0 .0
.0 .0 .0 .0 .0 .0
1.00 1.00 1.00 1.00 1.00 1.00
9.3 25.3 38.8 28.7 28.0 39.7
A C+ D+ C C D+
0 0 0 0 0 0
______________ ______________
24.9 35.5
C+ D+
998 304
05/03/06
16:22:41
EB
RT TH LT
Intersection
30.0
C
229
______________
Delay 30.8
RT TH LT
169 994 60
896 1033 163
.189 .962 .368
.555 .555 .090
10.0 19.1 38.5
.11 .47 .11
.1 19.5 1.4
.0 .0 .0
.0 .0 .0
1.00 1.00 1.00
10.1 38.6 39.9
B+ D+ D+
0 0 0
34.7
C
1223
______________ ______________ ______________
LOS C
YELM COMMERCIAL
YELM AVE 6 VANCIL RD
2008 PM PEAK HOUR VOLUMES WITHOUT PROJECT
05/03/06
16:22:41
SIGNAL2000/TEAPAC [Ver 2.70.07] - Evaluation of Intersection Performance
Intersection # 1 -
_____________________________________
Sq 14 I Phase 1 1 Phase 2 1 Phase 3 1
I + + + I I I
I + + + I I ++++I
I I v I ++++I I
I I I**** v I I
North I <* + +>I I****> I
I I *++ I I++++ I
I ++ I I v I
-------------------------------------
I G/C=0.222 1 G/C=0.090 I G/C=0.555 I
I G= 20.0" I G-- 8.1" I G= 99.9" I
I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I
1 Off= 0.08 I Off=26.6& I Off=40.1&
_____________________________________
C= 90 aec G= 76.0 sec = 86.78 Y=12.0 sec = 13.38 Ped= 0.0 sec = 0.08
MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int
Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total
AdjVOl: vph 62 57 110 62 898 38 66 46 190 169 994 60 2754
Wid/Ln:ft/# 0/0 12/1 12/1 12/1 12/1 12/1 12/1 12/1 12/1 12/1 12/1 12/1
g/C Rqd@C:8 0 16 17 14 52 13 15 13 24 19 56 19
g/C Used: 8 0 22 22 55 55 9 22 22 22 55 55 9
SV @E: vph 0 389 300 696 1033 145 355 422 265 896 1033 145 5879
___________ ______________ ______________ ______________ ______________ _____
Svc Lv1:LOS C C A C+ D+ C C D+ B+ D+ D+ C
Deg Sat:v/c 0.00 0.31 0.36 0.07 0.87 0.23 0.19 0.11 0.70 0.19 0.96 0.37 0.74
HCM Delis/v 0.0 29.7 30.3 9.3 25.3 38.8 28.7 28.0 39.7 10.1 38.6 39.9 30.8
Tot Del:min 0 15 14 2 95 6 8 5 31 7 160 10 353
# Stops:veh 0 25 23 7 193 9 14 9 44 21 237 14 596
Fuel: gal 0.0 0.5 0.4 0.1 3.4 0.2 0.3 0.2 0.8 0.4 4.5 0.3 11.1E
CO Em: kg 0.0 0.6 0.5 0.1 9.0 0.2 0.3 0.2 1.1 0.4 5.9 0.4 13.7E
___________ ______________ ______________ ______________ ______________ _____
¢ueue l:veh 0 5 4 1 35 2 3 2 9 4 46 3 46
¢ueue 1: ft 0 116 110 39 893 42 65 43 216 99 1163 68 1163
YELM COM[4ERCIAL
YELM AVE 6 VANCIL RD
2008 PM PEAK HOUR VOLUMES WITHOUT PROJECT
05/03/06
16:22:41
SLGNAL2000/TEAPAC [Ver 2.70.07] - Evaluation of Intersection Performance
APPR TOTALS
Param:Units SB Approach WB Approach NB Approach
AdjVOl: vph
229
998 304
Svc Lv1:LO5
Deg Sat:v/c
HCM Delis/v
Tot Del:min
# Stops:veh
EYiel: gal
CO Em: kg
Queue 1 veh
queue 1: ft
C
0.33
30.0
29
48
0.9
1.1
5
116
Int
EB Approach Total
-==-1223 2754
C+ D+ C C
0.80 0.49 0.83 0.74
24.9 35.5 34.7 30.8
103 44 177 353
209 67 272 596
3.7 1.3 5.2 11.1E
9.3
____ 1.6
______________ 6.7
____________ 13.7E
__ _____
_____
35 9 46 46
893 216 1163 1163
YELM COIMgRCIAL
YELM AVE 6 VANCIL RD
2008 PM PEAR HOUR VOLUMES WITH PROJECT
05/03/06
16:24:24
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Input Worksheet
Intersection N 1 - Area Location Type: NONCBD
I I I I I I Key: VOLUMES -- >
52 I 48 I 92 II I I WIDTHS
0.0 112.0 112.0 I I v LANES
I 0 1 1 1 1 II _____________________
I I I II \ 57 12.0 1
-------------- / I \ --------
-- 838 12 0 1
56 12 .0
__ 1
___ /
__________
928 ___
12 _
.0 1 --
----------
157
__________ ---
12
___ ---
.0
___ ---
1
___
\
__
I
I
-------------------
+ / 36 12.0 1
\ I /
II I I I
II 165 I 40 I 60 I
II 12.0 112.0 112.0 I
I I 1 1 1 1 1 1
II I I I
/I\
I
North
I
Phasing: SEQUENCE 14
PERMSV N N N N
OVERLP N N N N
LEADLAG LD LD
SB WB NB EB
RT TH LT AT TH LT RT TH LT RT TH LT
Heavy veh, 9HV 0 .0 .0 .0 2.0 .0 0 .0 0 .0 2.0 .0
Pk-hr fact, PHF .84 .84 .84 .92 .92 .92 . 87 .87 .87 .93 .93 .93
Pretimed or Act A A A A A A A A A A A A
Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2 .0 2.0 2.0 2.0 2.0 2.0
Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2 .0 2.0 2.0 2.0 2.0 2.0
Arrival typ, AT 3 3 3 3 3
____ 3
____ __ 3
___ 3
_____ 3
____ 3 3 3
____
_______________ _
Ped vol, vped _____ ___
0 ___ 0 0 0
Bike vol, vbic 0 0 0 0
Parking locatns NO NO NO NO
Park mnvra, Nm 0 0 0 0
Bus stops, NB 0 0 0 0
Grade, BG .0 .0 .0 .0
____________
Sq 14 I Phase 1 _____
1 Ph ___
ase ______
2 1 ______
Phase _____
3 1 ____
Phase
4
1 Ph
ase 5 _________
1 Phase ____
6 1
I+++ I I I I I I
I+++ I I ++++I I I I
I I v 1 ++++I I I I I
I I I**** v I I I I I
North I <* + +>I I****> I I I I
I I *++ I I+ +++ I I I I
1 *++ I I v I I I
-
---- I
----
-----------
C= 90"I G= 20.0" ------
I G= ---
8 ------
.1" ------
G= 49 -----
.9" I --------
G= 0. ---
0" -----
I G= ------
0.0" -----
I G= 0. 0" 1
I Y+R= 4.0"
___________ I Y+R= 4
_________ .0" I
______ Y+R= 4
______ .0" I
_____ Y+R= 0.
________ 0"
___ I Y+R= 0.0"
___________ I Y+R= 0.
__________ 0" I
____
YELM COMMERCIAL ~ 05/03/06
YELM AVE S VANCIL RD 16:24:24
2006 PM PEAR HOUA VOLUMES WITH PROJECT
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Volume Adjust S Satflow Worksheet
Volume SB WB NB EB
Adjustment RT TH LT RT TH LT RT TH LT RT TH LT
Volume, V 52 48 92 57 638 36 60 40 165 157 928 56
Pk-hr fact, PHF .84 .64 .84 .92 .92 .92 .87 .87 .87 .93 .93 .93
Adj my flow, vp
_______________ 62
_____ 57
_____ 110
____ 62
_____ 911
_____
_ 39
___ 69
____
__ 46
____
_ 190
___ 169
____ 998
______
_ 60
___
Lane group, LG RT+TH LT RT TH LT RT TH LT RT TH LT
Adj LG flow, v 119 110 62 911 39 69 46 190 169 998 60
Prop LT, PLT .000 1.00 .000 .000 1 .00 .000 . 000 1 .00 .000 .000 1 .00
Prop RT, PRT .521 .000 1 .000 .000 . 000 1 .000 . 000 . 000 1 .000 .000 . 000
Saturation SB WB NB EB
Flow Rate RT TH LT RT TH LT RT TH LT RT TH LT
Base satflo, eo 1900 1900 1900 1900 1 900 1900 1 900 1 900 1900 1900 1 900
Number lanes, N 1 1 1 1 1 1 1 1 1 1 1
Lane width, fW 1 .000 1.00 1 .000 1.00 1 .00 1 .000 1 .00 1 .00 1 .000 1.00 1 .00
Heavy veh, fHV 1 .000 1.00 1 .000 .980 1 .00 1 .000 1 .00 1 .00 1 .000 .980 1 .00
Grade, fg 1 .000 1.00 1 .000 1.00 1 .00 1 .000 1 .00 1 .00 1 .000 1.00 1 .00
Parking, fp 1 .000 1.00 1 .000 1.00 1 .00 1 .000 1 .00 1 .00 1 .000 1.00 1 .00
Bus block, fbb 1 .000 1.00 1 .000 1.00 1 .00 1 .000 1 .00 1 .00 1 .000 1.00 1 .00
Area type, fa 1 .000 1.00 1 .000 1.00 1 .00 1 .000 1 .00 1 .00 1 .000 1.00 1 .00
Lane util, fLU 1 .000 1.00 1 .000 1.00 1 .00 1 .000 1 .00 1 .00 1 .000 1.00 1 .00
Left-turn, fLT 1 .000 .727 1 .000 1.00 . 950 1 .000 1 .00 . 648 1 .000 1.00 . 950
Aight-turn, fRT .922 1.00 .850 1.00 1 .00 .850 1 .00 1 .00 .850 1.00 1 .00
PedBike LT,fLpb 1 .000 1.00 1 .000 1.00 1 .00 1 .000 1 .00 1 .00 1 .000 1.00 1 .00
PedBike RT,fRpb 1 .000 1.00 1 .000 1.00 1 .00 1 .000 1 .00 1 .00 1 .000 1.00 1 .00
Local adjustmnt 1 .000 1.00 1 .000 1.00 1 .00 1 .000 1 .00 1 .00 1 .000 1.00 1 .00
Adj Satflow, a 1752 1381 1615 1863 1 805 1615 1 900 1 231 1615 1863 1 805
SIGNAL2000/TEAPAC [Ver 2.70.07] - HCM Capacity and LOS Worksheet
Capacity SB WB NB EB
Analysis RT TH LT RT TH LT RT TH LT RT TH LT
Lane group, LG RT+TH LT RT TH LT RT TH LT RT TH LT
Adj Flow, v 119 110 62 911 39 69 46 190 169 998 60
Satflow, s 1752 1381 1615 1863 1805 1615 1900 1231 1615 1863 1805
Lost time, tL 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Effect green, g 20.0 20.0 49.9 49.9 8.1 20.0 20.0 20.0 49.9 49.9 8.1
Grn ratio, g/C .222 .222 .555 .555 .090 .222 .222 .222 .555 .555 .090
LG capacity, c 389 306 896 1033 163 358 422 273 896 1033 163
v/c ratio, X .306 .359 .069 .882 .239 .193 .109 .696 .189 .966 .368
Flow ratio, v/s .068 .080 .038 .489 .022 .043 .024 .159 .105 .536 .033
Crit lane group
_______________
__________
____
_____
____
_____
____
______ *
____
_____ *
_____ *
____
Sum crit v/s,YC 0.723 Total lost, L 12.0
Crit V/c, Xc .835
YELM COtM1ERCIAL
YELM AVE 5 VANCIL RD
2006 PM PEAK KOUR VOLUMES WITH PROJECT
SIGNAL2000/TEAPAC [Ver 2.70.07] - HCM Capacity and LOS Worksheet
Delay SB WB
and LOS RT TH LT RT TH LT
Lane group, LG RT+TH LT RT TH LT
Adj Flow, v 119 110 62 911 39
LG capacity, c 389 306 896 1033 163
v/c ratio, X .306 .359 .069 .882 .239
Grn ratio, g/C .222 .222 .555 .555 .090
Unif delay, dl 29.2 29.6 9.3 17.5 36.1
Incr calib, k .11 .11 .11 .41 .11
Incr delay, d2 .4 .7 .0 9.1 .8
Queue Delay, d3 .0 .0 .0 .0 .0
Unif delay, dl* .0 .0 .0 .0 .0
Prog factor, PF 1.00 1.00 1.00 1.00 1.00
Contrl delay, d 29.7 30.3 9.3 26.5 38.6
Lane group LOS C C A C+ D+
Final Queve,Qpi 0 0
___ 0
_____ 0
_____ 0
____
_______________
Appr delay, dA __________
30.0 _ 26.0
Approach LOS C C+
Appr flow, vA
_______ 229
__________
____
_____ 1012
_____
____
________
Intersection: Delay 31.5 LOS C
05/03/06
16:24:24
NB EB
RT TH LT RT TH LT
RT TH LT RT TH LT
69 46 190 169 998 60
358 422 273 696 1033 163
.193 .109 .696 .189 .966 .368
.222 .222 .222 .555 .555 .090
28.5 27.9 32.2 10.0 19.2 38.5
.11 .11 .26 .11 .47 .11
.3 .1 7.5 .1 20.2 1.4
.0 .0 .0 .0 .0 .0
.0 .0 .0 .0 .0 .0
1.00 1.00 1.00 1.00 1.00 1.00
28.7 28.0 39.7 10.1 39.5 39.9
C C D+ B+ D+ D+
0 0 0
_
__ 0
_____ 0
____ 0
_____
_____ _____
35.5 _ 35.9
D+ D+
_____ 305
____
_____
_____ 1227
____
_____
YELM COMMERCIAL
YELM AVE S VANCIL RD
2008 PM PEAK HOUR VOLUMES WITH PROJECT
05/03/06
16:29:24
SIGNAL2000/TEAPAC [Ver 2.70.07] - Evaluation of Intersection Performance
Intersection # 1 -
__________ ___________________
Sq 19 I Phase 1 1 Phase 2 1 Phase 3 1
I + + + I I I
I + + + I I ++++I
I I v I ++++I I
I I ^ I**** v I
North I <* + +> I****> I
I 1 *++ I I++++ 1
1 *++ I I v I
------- ----------------------
I G/C=0.222 G/C=0.090 I G/C=0.555 I
I G= 20.0" I G= 8.1" I G= 49.9" I
I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I
I Off= 0.08 I Off=26.68 I Off=90.18 I
_____________________________________
C= 90 sec G= 78.0 sec = 86.78 Y=12.0 sec = 13.38
MVMT TOTALS SB Appr~
Param:Units RT TH
AdjVOl: vph 62 57
Wid/Ln:ft/# 0/0 12/1
g/C Rqd@C:8 0 16
g/C Used: 8 0 22
SV @E: vph 0 389
___________ _________
Svc Lv1:L0S C
Deg Sat:v/c 0.00 0.31
HCM Delis/v 0.0 29.7
Tot Del:min 0 15
# Stopa:veh 0 25
Fuel: gal 0.0 0.5
CO Em: kg 0.0 0.6
___________ _________
queue l:veh 0 5
queue 1: ft 0 116
>ach WB
LT RT
110 62
12/1 12/1
17 14
22 55
300 896
C A
0.36 0.07
30.3 9.3
14 2
23 7
0.9 0.1
0.5 0.1
110 34
Approach NB Appr~
TH LT RT TH
911 39 69 46
12/1 12/1 12/1 12/1
52 13 15 13
55 9 22 22
1033 195 355 922
C+ D+ C C
0.08 0.24 0.19 0.11
26.5 38.8 28.7 28.0
101 6 8 5
199 9 14 9
3.6 0.2 0.3 0.2
4.2 0.2 0.3 0.2
36 2 3 2
923 44 66 43
Ped= 0.0 sec = 0.08
each EB Approach
LT RT T8 LT
190 169 998 60
12/1 12/1 12/1 12/1
24 19 57 14
22 55 55 9
265 896 1033 195
______________
D+ B+ D+ D+
0.70 0.19 0.97 0.37
39.7 10.1 39.5 39.9
31 7 164 10
44 21 239 19
0.8 0.4 4.5 0.3
1.1 0.4 6.0 0.9
______________
9 4 47 3
216 99 1177 68
Int
Total
2773
5679
C
0.74
31.5
363
604
11.31
14.OI
---47
1177
YELM COPII~RCIAL 05/03/06
YELM AVE 6 VANCIL RD 16:24:24
2008 PM PEAK HOUR VOLUMES WITH PROJECT
SIGNAL2000/TEAPAC[Ver 2.70.077 - Evaluation of Intersection Performance
APPR TOTALS Int
Param:Units SB Approach WB Approach NB Approach EB Approach Total
AdjVOl: vph
___________ 229
______________ 1012
______________ 305
______________ 1227
______________ 2773
_____
Svc Lv1:LOS C C+ D+ D+ C
Deg Sat:v/c 0.33 0.81 0.49 0.83 0.79
HCM Delis/v 30.0 26.0 35.5 35.4 31.5
Tot Del:min 29 109 44 181 363
# Stops:veh 48 215 67 274 604
Fuel: gal 0.9 3.9 1.3 5.2 11.3E
CO Em: kg
___________ 1.1
______________ 4.5
______________ 1.6
______________ 6.8
______________ 14.0E
_____
Queue l:veh 5 36 9 47 47
Queue 1: ft 116 923 216 1177 1177
TWO-WAY STOP CONTROL SUMMARY
eneral Information ite Information
nalyst
gency/Co.
Date Pedortnetl
nal sis Time Period Intersection
urisdidion
nalysis Vear Yelm AVe8103MAVe
Pro'ect Descri lion EXISTING PM PEAK HOUR VOLUMES
EasWJest Street: 103rd Avenue SE NonhlSOUth StreeC Yelm Avenue SR-507
Intersection Orientation: North-South tact Pedotl hrs : 0.25
ehicle Volumes antl Ad'usiments
a or Street Nonhbound Southbound
Movement 1 2 3 4 5 6
olume
Peak-Hour Factor, PHF L
3
0.86 T
808
086 R
15
086 L
64
0.90 T
877
090 R
3
0.90
Hourly Flow Rate, HFR 3 939 /7 71 974 3
Percent Heavy Vehicles 0 - - 3 - -
adian Type Two Way Leff Tum Lene
T Channelizetl 0 0
nes 1 1 0 1 1 0
onfiguration L 7R L TR
U stream Si nal 0 0
inor Street Westbountl Eastbound
pvement 7 8 9 10 11 12
L T R L T R
olume f0 0 71 0 1 8
Peak-Hour Fedor, PHF 0.84 0.84 084 0.75 0.75 0.75
Hourly Flow Rate, HFR 11 0 84 0 1 f0
Percent Heavy Vehicles f 1 1 0 0 0
Percent Grade (%) 0 0
Wretl Approach N N
torege 0 0
T Channel¢etl 0 0
nes 0 1 1 0 / 0
onfiguralion LT R LTR
Data Dueue Len th and Level of Service
pproach NB SB Westbountl Easlbountl
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LT R LTR
(vph) 3 71 11 84 if
(m)(vph) 714 715 131 318 277
/c 0.00 010 008 026 004
5%queue length 001 0.33 O.D 1.04 0.12
onfrol Delay 10.1 10.6 35.0 20.3 18.5
LOS B 8 D C C
pproach Delay - - 22.0 185
pproach LOS -- -- C C
Righ[s Reserved
!Doom iorr,~n ~ c.w. ~..~..~.~rv o~ no.~a.. Aii.~a~o na.rv.a .m,~,,.. ~~
v.n~o~ a u
TWO-WAY STOP CONTROL SUMMARY
nl Infnrmafinn Ite Infonnatlnn
oudy Flow Rate, HFR 3 1263 29 74 1291 3
ercent Heavy Vehicles 0 - - 3 - -
Median Type Twa Way LeR Tum Lene
RT Channelized 0 0
Lanes 1 1 0 f i 0
onfgurzlion L TR L TR
U stream Si nal 0 0
Inor Street WesWOUnd Eestbountl
Movement 7 8 9 10 11 12
L T R L T R
olume 20 0 ]4 0 1 8
Peak-Hour Factor, PHF 0.84 0.84 0.84 0.75 0.75 0.75
Hourly Flow Rate, HFR 23 0 88 0 1 f0
Percent Heavy Vehides i 1 1 0 0 0
proach NB
Movement 1
Lene Gon(iguration L
(vph) 3
(m)(vph) 542
/c 0.01
5%queue length 002
onirol Delay 11.7
LOS B
pproach Delay -
pproech LOS -
N
0
i
SB
4
L
]4
533
0.14
0.48
12.8
B
1 0
R
WesOOUntl
] 8 9
LT R
23 H8
]7 204
0.30 0.43
1.10 2.00
70.5 35.4
F E
42.7
E
1 0
LTR
Eastbound
10 11 12
LTR
11
1]8
0.06
0 20
26.6
D
26.6
D
N(5300fm+ CopyngM 03W3lln wersiry of klon4, Nl ttitl ~u ttesmaE ven Iona u
TWO-WAY STOP CONTROL SUMMARY
eneral Information ite Information
nalyst
gencylCa.
Date Pertormetl
nal sis Time Periotl Intersection
uristliction
natysis Vear Yelm AVe8103rd AVe
Pro ect Descn Lion 2008 PM PEAK HOUR VOLUMES WITH PROJECT
EastNyesl Street: 103rd Avenue SE Nonh/South Slreeb Yelm Avenue SR-507
InterseGion Orientation: North-South tact Periotl hrs : 0.25
ehicle Volumes and Ad'uslments
Ma'or Street Nonhbountl Southbountl
Movement 1 2 3 4 5 6
L T R L T R
olume 3 1099 25 67 1166 3
Peak-Hour Factor, PHF 086 086 0.66 0.90 090 090
Hourry Flow Rate, HFR 3 1277 29 74 1295 3
Percent Heavy Vehicles 0 - - 3 - -
Metlian Type Two Way LeR ium Lane
RT Channelizetl 0 0
Lanes / 1 0 1 / 0
onfgumtian L TR L TR
stream Si nal 0 0
Minor Street Westbountl Eastbountl
Movement 7 8 9 10 it 12
L T R L T R
olume 20 0 74 0 1 8
eak-Hour Facoq PHF 0.84 084 0.84 0.75 075 0.75
oudy Flow Rate, HFR 23 0 88 0 1 f0
ercent Heavy Vehices 1 / 1 0 0 0
ercent Grade (%) 0 0
laretl Approach N N
forage 0 0
T Channelizetl 0 0
nes 0 1 1 0 i 0
on6guration LT R LTR
Dela Oueue Len th and Level of Service
proach NB SB Westbountl Eastbountl
Movement 1 4 7 8 9 10 11 12
Lane Confguration L L LT R LTR
(vph) 3 74 23 88 11
(m) (vphl 590 SD 77 200 17]
Ic 0.01 014 0.30 0.44 0.06
5%queue length 0.02 049 1.10 2.06 0.20
ontrol Delay 11.7 12.9 70.5 36.4 26.7
OS B B F E D
proach Delay - - 43.5 26.7
pproach LOS - -- E D
Righ[s Reserved
NCQOOP`~ ~ oOY~~em o ewa umam,ry o~ nonce, nn n,pnu nemm vmmn ~.u
Version aJ!
YELM COM[~ACIAL 05/03/06
YELM AVE S CLARR RD/PRAIRIE PARK ST 16:47:31
EXISTING PM PEAR HOUR VOLUMES
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Input Worksheet
Intersection N 1 - Area Location Type: NONCBD
I I I I I I Key: VOLUMES -- >
I 25 I 9 34 II I WIDTHS
I 0.0 112.0 112.0 II I V LANES
I 0 1 1 1 1 II _____________________
I I I II \ 27 0.0 0
------ / I \ ------------------- /I\
-- 619 12.0 1 I
-_-_-__________ ___________________ I
27 12.0 1 / + / 53 12.0 1 North
___________________ __---___- I
886 12.0 1 --
_______ \ I / ______________
-__--_--s---o_o o \ II I I I
------ II e l 5 1 27 Phasing: SEQUENCE 11
II 12.0 112.0 I 0.0 PERMSV N N N N
I I I 1 1 1 1 0 OVERLP N N N N
I II I I I LEADLAG LD LD
SB WB NB EB
RT TH LT RT TH LT RT TH LT RT TH LT
Heavy veh, $HV 0 0 .0 0 2.0 .0 0 .0 .0 .0 2.0 0
Pk-hr fact, PHF .93 .93 .93 .95 .95 .95 .83 .83 .83 .89 .89 .89
Pretimed or Act A A A A A A A A A A A A
Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival typ, AT 3 3 3 3 3 3 3 3 3 3 3 3
_______________ ______________ ___________ _____________
Ped vol, vped 0 0 0 0
Bike vol, vbic 0 0 0 0
Parking locatna NO NO NO NO
Park mnvra, Nm 0 0 0 0
Bus stops, NB 0 0 0 0
Grade, 8G .0 .0 .0 .0
____________ ___________________________________________
Sq 11 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 9 1 Phase 5 1 Phase 6 1
I**+ I ^ I I I I I
I+++ I ++++I I I I I
I I v I ++++I I I I I
I I I++++ v I I I I I
North I <+ + +>I****> I I I I I
I I +++ I**** I I I I I
Im +++ I v I I I I I
-------------------------------------------------------------------------
C= 60"I G= 5.0" I G= 47.0" I G-- 0.0" I G= 0.0" I G= 0.0" I G= 0.0" I
I Y+R= 4.0" I Y+R= 4.0" I Y+R= 0.0" Y+R= 0.0" Y+R= 0.0" Y+R= 0.0" I
YELM COMMERCIAL
YELM AVE 6 CLARK RD/PRAIRIE PARK ST
EXISTING PM PEAR HOUR VOLUMES
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Volume Adjust 6 Satflow Worksheet
05/03/06
16:47:31
Volume SB WB NB EB
Adjustment RT TH LT RT TH LT RT TH LT RT TH LT
Volume, V 25 9 34 27 619 53 27 5 8 8 886 27
Pk-hr fact, PHF .93 .93 .93 .95 .95 .95 .83 .83 .83 .89 .89 .89
Adj my flow, vp 27 9 37 28 652 56 33 6 10 9 996 30
Lane group, LG RT+TH LT RT+TH LT RT+TH LT RT+TH LT
Adj LG flow, v 31 37 680 56 39 10 1005 30
Prop LT, PLT .000 1.00 .000 1 .00 .000 1 .00 .000 1.00
Prop AT, PRT .871 .000 .041 . 000 .846 . 000 .009 .000
Saturation
Flow Rate
Base satflo, so
Number lanes, N
Lane width, fW
Heavy veh, fHV
Grade, fg
Parking, fp
Bus block, fbb
Area type, fa
Lane util, fLU
Left-turn, fLT
Right-turn, fRT
PedBike LT,fLpb
PedBike RT,fRpb
Local adjuatmnt
Adj satflow, s
SB
RT TH LT
1900 1900
1 1
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 .800
.869 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1652 1520
WB
RT TH LT
1900 1900
1 1
1 .000 1 .00
.981 1 .00
1 .000 1 .00
1 .000 1 .00
1 .000 1 .00
1 .000 1 .00
1 .000 1 .00
1 .000 . 220
.994 1 .00
1 .000 1 .00
1 .000 1 .00
1 .000 1 .00
1853 419
NB
RT TH LT
1900 1900
1 1
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 .800
.873 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1659 1520
EB
RT TH LT
1900 1900
1 1
1.000 1.00
.981 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1.000 .373
.999 1.00
1.000 1.00
1.000 1.00
1.000 1.00
1861 706
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Capacity and LOS Worksheet
Capacity SB WB NB
Analysis RT TH LT RT TH LT RT TH LT
Lane group, LG RT+TH LT AT+TH LT RT+TH LT
Adj Flow, v 31 37 680 56 39 10
Satflow, s 1652 1520 1853 419 1659 1520
Lost time, tL 4.0 4.0 4.0 4.0 4.0 4.0
Effect green, g 5.0 5.0 47.0 4 7.0 5.0 5.0
Grn ratio, g/C .083 .083 .783 . 783 .083 .083
LG capacity, c 138 127 1451 328 138 127
v/c ratio, X .225 .291 .469 . 171 .283 .079
Flow ratio, v/s .019 .024 .367 . 134 .024 .007
Crit lane group
_______________
__________ +
____
___________
___
__
____
Sum crit v/s,YC 0.564 Total lost, L 8.0
Crit v/c, Xc .651
EB
RT TH LT
RT+TH LT
1005 30
1861 708
4.0 4.0
47.0 47.0
.783 .783
1457 555
.690 .054
.540 .042
YELM COMMERCIAL 05/03/06
YELM AVE fi CLARE RD/PRAIRIE PARE ST 16:97:31
EXISTING PM PEAE HOUR VOLUMES
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Capacity and LOS Worksheet
Delay SB WB NB EB
and LOS RT TH LT AT TH LT RT TH LT RT TH LT
Lane group, LG RT+TH LT RT+TH LT RT+TH LT RT+TH LT
Adj Flow, v 31 37 680 56 39 10 1005 30
LG capacity, c 138 127 1451 328 138 127 1457 555
v/c ratio, X .225 .291 .469 . 171 .283 .079 .690 .054
Grn ratio, g/C .083 .083 .783 . 783 .083 .063 .783 .783
Unif delay, dl 25.7 25.8 2.2 1.6 25.8 25.4 3.1 1.5
Incr calib, k .il .11 .11 .11 .11 .11 .26 .11
Incr delay, d2 .8 1.3 .2 .2 1.1 .3 1.9 .0
Queue Delay, d3 .0 .0 .0 .0 .0 .0 .0 .0
Unif delay, dl+ .0 .0 .0 .0 .0 .0 .0 .0
Prog factor, PF 1.00 1.00 1.00 1 .00 1.00 1.00 1.00 1.00
Contrl delay, d 26.5 27.1 2.5 1.9 26.9 25.6 4.5 1.5
Lane group LOS C+ C+ A A C+ C+ A A
Final Queue,Qbi 0
________ 0
____ 0
___________ 0
___ 0
__________ 0
____ 0
__________ 0
____
_______________
Appr delay, dA __
26.8 2.4 26.7 4.9
Approach LOS C+ A C+ A
Appr flour, vA
_______________ 68
__________
____ 736
___________
___ 49
__________
____ 1035
__________
____
intersection: Delay 5.0 LOS A
YELM COMMERCIAL 05/03/06
YELM AVE 6 CLARK RD/PRAIRIE PARK ST 16:47:31
EXISTING PM PEAK HOUR VOLUMES
SIGNAL2000/TEAPAC[Ver 2.70.07] - Evaluation of Interaection Performance
Intersection # 1 -
_________________________
Sq 11 I Phase 1 1 Phase 2 1
I * * + I I
I I I++++ v I
North <+ + +>I****> I
I I + + + I**** I
Im + + + I v I
I G/C=0.083 I G/C=0.783 I
I G-- 5.0" I G= 47.0" I
I Y+R= 4.0" I Y+R= 4.0" I
I Off= 0.06 Off=15.0& I
_________________________
C= 60 aec G= 52.0 sec = 86.79 Y= 8.0 sec = 13.38 Ped= 0.0 sec = 0.08
MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int
Param:Unita RT TH LT RT TH LT RT TH LT RT TH LT Total
AdjVOl: vph 27 9 37 28 652 56 33 6 10 9 996 30 1888
Wid/Ln:ft/# 0/0 12/1 12/1 0/0 12/1 12/1 0/0 12/1 12/1 0/0 12/1 12/1
g/C Rqd@C:8 0 4 0 0 40 0 0 4 0 0 55 0
g/C Used: 8 0 8 8 0 78 78 0 8 8 0 76 78
SV @E: vph 0 127 116 0 1451 328 0 127 116 0 1457 555 4277
___________ ______________ ______________ _____ _____________ _____
Svc Lv1:LOS C+ C+ A A C+ C+ A A A
Deg Sat:v/c 0.00 0.22 0.29 0.00 0.97 0.17 0.00 0.28 0.08 0.00 0.69 0.05 0.56
HCM Delis/v 0.0 26.5 27.1 0.0 2.5 1.9 0.0 26.9 25.6 0.0 4.5 1.5 5.0
Tot Del:min 0 3 4 0 7 0 0 4 1 0 19 0 38
# Stops:veh 0 7 9 0 58 4 0 9 2 0 118 2 209
Fuel: gal 0.0 0.1 0.2 0.0 1.0 0.1 0.0 0.2 0.0 0.0 2.0 0.0 3.6L
CO Em: kg 0.0 0.1 0.2 0.0 0.8 0.1 0.0 0.2 0.0 0.0 1.7 0.0 3.1L
___________ ______________ ______________ ______________ _________
Queue 1: veh 0 1 1 0 8 1 0 1 0 0 15 0 15
Queue 1: ft 0 24 29 0 195 13 0 30 8 0 391 6 391
YELM COIMIERCIAL
YELM AVE 6 CLARK RD/PRAIRIE PARK ST
EXISTING PM PEAK HOUR VOLUMES
05/03/06
16:47:31
SIGNAL2000/TEAPAC[Ver 2.70.07] - Evaluation of Intersection Performance
APPR TOTALS
Param:Units SB Approach WB Approach NS Approach EB Approach
AdjVOl: vph
___________ 68
______________ 736
______________ 49
______________ 1035
____________
Svc Lv1:LO5 C+ A C+ A
Deg Sat:v/c 0.26 0.45 0.24 0.67
HCM Delis/v 26.8 2.9 26.7 4.4
Tot Del:min 7 7 5 19
# Stops:veh 16 62 it 120
FVel: gal 0.3 1.1 0.2 2.0
CO Em: kg 0.3
_____________ 0.9
______________ 0.2
____ 1.7
_
Queue l:veh 1 8 1 15
Queue 1: ft 29 195 30 391
Int
Total
1888
A
0.56
5.0
38
209
3.6L
3.1L
15
391
YELM COIMfERCIAL
YELM AVE 6 CLARK RD/PRAIRIE PARE ST
2008 PM PEAK HOUR VOLUMES WITHOUT PROJECT
05/03/06
16:50:43
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Input Worksheet
Intersection # 1 - Area Location Type: NONCBD
I I I I I I Key: VOLUMES -- >
I 26 I 4 35 I I I WIDTHS
I 0.0 112.0 112.0 II I v LANES
I 0 1 1 1 1 II _____________________
-------------I I I II \ 28 0.0 0
/ I \ ___________________ /I\
-- 887 12.0 1 I
__________-____- ___________________ I
28 12.0 1 / + / se 12.0 1 North
___________________ ______________= I
1168 12.0 1 --
___________________ \ I / ______________
8 0.0 0\ II I I I
--- II 10 5 I 32 I Phasing: SEQUENCE 11
I II 12.0 12.0 I 0.0 I PERMSV N N N N
I II 1 1 1 1 0 1 GVERLP N N N N
I II I I I LEADLAG LD LD
SB WB NB EB
RT TH LT AT TH LT RT TH LT RT TH LT
Heavy veh, BHV 0 .0 .0 0 2.0 0 0 0 .0 0 2.0 .0
Pk-hr fact, PHP .93 .93 .93 .95 .95 .95 .83 .83 .83 .89 .89 .89
Pretimed or Act A A A A A A A A A A A A
Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival typ, AT 3 3 3 3 3 3 3 3 3 3 3 3
_______________ ______________ ______________ ______________ ______________
Ped vol, vped 0 0 0 0
Hike vol, vbic 0 0 0 0
Parking l0Catn9 NO NO NO NO
Park mnvra, Nm 0 0 0 0
Bus stops, NB 0 0 0 0
Grade, 8G .0 .0 .0 .0
_________________________________________________________________________
Sq 11 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 1
I**+ I I I I I I
I**+ I ++++I I I I I
I I v I ++++I I I I I
I I I++++ V I I I I I
North I <+ + +>I+++*> I I I I I
I I +++ I**** I I I I I
Im +++ I v I I I I I
-------------------------------------------------------------------------
C= 60"I G= 5.0" I G= 47.0" G= 0.0" I G= 0.0" I G= 0.0" I G= 0.0" I
I Y+R= 4.0" I Y+R= 9.0" I Y+R= 0.0" I Y+R= 0.0" I Y+R= 0.0" I Y+R= 0.0" I
_________________________________________________________________________
YELM COPIIgRCIAL
YELM AVE 6 CLARK RD/PRAIRIE PARK ST
2008 PM PEAK HOUR VOLUMES WITHOUT PROJECT
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Volume Adjust S Satflow Worksheet
05/03/06
16:50:43
Volume SB WB NB EB
Adjustment RT TH LT RT TH LT AT TH LT RT TH LT
Volume, V 26 4 35 28 887 58 32 5 10 8 1168 28
Pk-hr fact, PHF .93 .93 .93 .95 .95 .95 .83 .83 .83 .89 .89 .89
Adj my flow, vp 28
___ 4
_____
_ 38
___ 29
_____ 934
___ 61 39 6
___
_ 12
___ 9
_____ 1312
_____
_ 31
___
_______________
Lane group, LG __ RT+TH LT RT+TH LT RT+TH LT RT+TH LT
Adj LG flow, v 32 38 963 61 95 12 1321 31
Prop LT, PLT .000 1 .00 .000 1 .00 .000 1 .00 .000 1 .00
Prop AT, PRT .875 . 000 .030 . 000 .867 . 000 .007 . 000
Saturation SB WB NB EB
Flow Rate RT TH LT RT TH LT RT TH LT RT TH LT
Base satflo, so 1900 1900 1900 1 900 1900 1 900 1900 1 900
Number lanes, N 1 1 1 1 1 1 1 1
Lane width, fW 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00
Heavy veh, fHV 1 .000 1 .00 .981 1 .00 1 .000 1 .00 .981 1 .00
Grade, fg 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00
Parking, fp 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00
Bus block, fbb 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00
Area type, fa 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00
Lane util, fLU 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00
Left-turn, fLT 1 .000 . 600 1 .000 . 085 1 .000 . 800 1 .000 . 239
Aight-turn, fRT .869 1 .00 .995 1 .00 .870 1 .00 .999 1 .00
PedBike LT,fLpb 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00
PedBike RT,fApb 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00
Local adjustmnt 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00
Adj Satflow, a 1651 1520 1855 162 1653 1520 1861 454
SLGNAL2000/TEAPAC[Ver 2.70.07] - HCM Capacity and LOS Worksheet
Capacity SB WB NB EH
Analysi9 RT TH LT RT TH LT RT TH LT RT TH LT
Lane group, LG RT+TH LT RT+TH LT RT+TH LT AT+TH LT
Adj Flow, v 32 38 963 61 45 12 1321 31
Satflow, s 1651 1520 1855 162 1653 1520 1861 454
Lost time, tL 9.0 4.0 4.0 9.0 4.0 4.0 4.0 4.0
Effect green, g 5.0 5.0 47.0 4 7.0 5,0 5.0 47.0 47.0
Grn ratio, g/C .083 .083 .783 . 783 .083 .083 .783 .783
LG capacity, c 138 127 1453 127 138 127 1458 356
v/c ratio, X .232 .299 .663 . 480 .326 .094 .906 .087
Flow ratio, v/s .019 .025 .519 . 377 .027 .008 .710 .068
Crit lane group
_______________
__________
____
______
____
____
Sum crit v/9,YC 0.737 Total lost, L 8.0
Crit v/c, Xc .850
YELM COMMERCIAL
YELM AVE 6 CLARK RD/PRAIRIE PARK ST
2006 PM PEAK HOUR VOLUMES WITHOUT PROJECT
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Capacity and LOS Worksheet
Delay
and LOS
Lane group, LG
Adj Flow, v
LG capacity, c
v/c ratio, X
Grn ratio, g/C
Unif delay, dl
Incr calib, k
Incr delay, d2
Queue Delay, d3
Unif delay, dl*
Prog factor, PF
Contrl delay, d
Lane group LOS
Final Queue,Qbi
_______________
Appr delay, dA
Approach IRS
Appr flow, vA
Intersection
SB WB NB
RT TH LT RT TH LT RT TH LT
RT+TH LT RT+TH LT RT+TH LT
32 38 963 61 45 12
138 127 1453 127 138 127
.232 .299 .663 . 480 .326 .094
.083 .083 .783 . 783 .083 .083
25.7 25.9 2.9 2.3 25.9 25.4
.11 .11 .24 .11 .11 .il
.9 1.3 1.1 2.8 1.4 .3
.0 .0 .0 .0 .0 .0
.0 .0 .0 .0 .0 .0
1.00 1.00 1.00 1 .00 1.00 1.00
26.6 27.2 9.1 5.1 27.3 25.7
C+ C+ A A C+ C+
0 0 0 0 0
_
_
__ 0
__________
26.9 ____ ___________
4.1 ___ __
__
_
_
27.0 ____
C+ A C+
70
__________
____ 1024
___________
___ 57
__________
____
Delay 10.1 LOS B+
05/03/06
16:50:43
EB
RT TH LT
RT+TH LT
1321 31
1458 356
.906 .087
.783 .783
4.9 1.5
.43 .11
8.5 .1
.0 .0
.0 .0
1.00 1.00
13.3 1.6
B+ A
0 0
13.0
B+
1352
YELM COMMERCIAL 05/03/06
YELM AVE 6 CLARK RD/PRAIRIE PARK ST 16:50:43
2008 PM PEAK HOUR VOLUMES WITHOUT PROJECT
SIGNAL2000/TEAPAC [Ver 2.70.07] - Evaluation of Intersection Performance
Intersection # 1 -
_________________________
Sq 11 I Phase 1 1 Phase 2 1
I * * + I I
I I v I ++++I
I I I++++ v I
North I <+ + +>I****> I
I I + + + I**+* I
Im + + + I v I
_________________________
I G/C=0.083 I G/C=0.783 I
I G= 5.0" I G= 47.0" I
I Y+R= 9.0" I Y+R= 4.0" I
Off= 0.09 I Off=15.08 I
_________________________
C= 60 sec G-- 52.0 sec = 86.79 Y= 8.0 sec = 13.3 Ped= 0.0 sec = O.Ob
MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int
Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total
AdjVOl vph 28 4 38 29 934 61 39 6 12 9 1312 31 2503
Wid/Ln:ft/# 0/0 12/1 12/1 0/0 12/1 12/1 0/0 12/1 12/1 0/0 12/1 12/1
g/C Rqd@C:8 0 9 0 0 53 0 0 5 0 0 71 0
g/C Used: B 0 8 8 0 76 78 0 6 8 0 78 76
SV @E: vph 0 127 116 0 1453 125 0 127 116 0 1458 356 3878
___________ ______________ ______________ ______________ ______________ _____
SVC Lv1:LOS C+ C+ A A C+ C+ 8+ A B+
Deg Sat:v/c 0.00 0.23 0.30 0.00 0.66 0.48 0.00 0.33 0.09 0.00 0.91 0.09 0.76
HCM Delis/v 0.0 26.6 27.2 0.0 9.1 5.1 0.0 27.3 25.7 0.0 13.3 1.6 10.1
Tot Del:min 0 4 4 0 16 1 0 5 1 0 73 0 104
# Stopa:veh 0 7 9 0 108 5 0 11 3 0 247 2 392
Ebel: gal 0.0 0.1 0.2 0.0 1.6 0.1 0.0 0.2 0.1 0.0 4.1 0.0 6.6L
CO Em: kg 0.0 0.1 0.2 0.0 1.6 0.1 0.0 0.2 0.1 0.0 4.2 0.0 6.SL
___________ ______________ ______________ ______________ ______________ _____
Queue l:veh 0 1 1 0 14 1 0 1 0 0 33 0 33
Queue 1: ft 0 25 30 0 359 22 0 35 9 0 835 7 835
YELM COMMERCIAL
YELM AVE fi CLARE RD/PRAIRIE PARK ST
2008 PM PEAK HOUR VOLUMES WITHOUT PROJECT
05/03/06
16:50:43
SIGNAL2000/TEAPAC[Ver 2.70.07] - Evaluation of Intersection Performance
APPR TOTALS
Param:Units
AdjVOl: vph
Svc Lv1:LOS
Deg Sat:v/c
HCM Delis/v
Tot Del:min
# Stops:veh
EUel: gal
CO Em: kg
Queue 1 veh
Queue 1: ft
SB Approach
70
C+
0.27
26.9
8
16
0.3
0.3
30
WB Approach PIB Approach
1024 57
A C+
0.65 0.28
9.1 27.0
17 6
113 19
1.9 0.3
1.7
____
___
____ 0.3
______________
__
_
19 1
359 35
Int
EB Approach Total
1352
______________ 2503
_____
B+ B+
0.89 0.76
13.0 10.1
73 109
299 392
4.1 6.6L
4.2 6.5L
_____________
33 _ _____
33
835 835
YELM CODASERCIAL
YELM AVE 6 CLARK RD/PRAIRIE PARK ST
2008 PM PEAR HOUR VOLUMES WITH PROJECT
05/03/06
16:52:46
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Input Worksheet
Intersection # 1 - Area Location Type: NONCBD
I I 1 I 1 Key: VOLUMES -- >
I 26 I 4 1 35 I I WIDTHS
I 0.0 112.0 112.0 I v LANES
I 0 1 1 1 1 II _________
I I I II \ 28 0.0 0
-------------- / I \ ------------------- /I\
-- 897 12.0 1 I
__°_-__-___--- ______ I
28 12.0 1 / + / 60 12.0 1 North
___________________ _____________-___ I
1172 12.0 1 --
___________________ \ I / ______________
8 0_0 0\ I I I I
------ 1 10 I 5 1 32 I Phasing: SEQUENCE 11
I II 12.0 112.0 I 0.0 I PERMSV N N N N
II 1 1 1 1 0 1 OVERLP N N N N
II I 1 I LEADLAG LD LD
SB WB NB EB
RT TH LT RT TH LT RT TH LT RT TH LT
Heavy veh, ~HV .0 .0 .0 .0 2.0 .0 .0 .0 .0 0 2.0 .0
Pk-hr fact, PHF .93 .93 .93 .95 .95 .95 .83 .83 .83 .89 .89 .89
Pretimed or Act A A A A A A A A A A A A
Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Arrival typ, AT 3 3 3 3 3 3 3 3 3 3 3 3
_______________ __ _______ ______________ ______________
Ped vol, vped 0 0 0 0
Bike vol, vbic 0 0 0 0
Parking locatns NO NO NO NO
Park mnvra, Nm 0 0 0 0
Bus stops, NB 0 0 0 0
Grade, &G .0 .0 .0 .0
_________________________________________________________________________
Sq 11 I Phase 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 1
I**+ I I I I I I
1**+ 1 ++++I I I I I
I I v I ++++I I I 1 I
I I I++++ v I I I I I
North I <+ ++>I****> I I I I 1
I I +++ I**** I I I I I
Im +++ I v I I I I I
-------------------------------------------------------------------------
C= 60"I G= 5.0" I G-- 47.0" G-- 0.0" I G= 0.0" I G= 0.0" G-- 0.0" I
I Y+R= 4.0" Y+R= 4.0" I Y+R= 0.0" I Y+A= 0.0" I Y+R= 0.0" Y+R= 0.0"
_________________________________________________________________________
YELM COMMERCIAL 05/03/06
YELM AVE fi CLAAE RD/PRAIRIE PARE ST 16:52:48
2008 PM PEAK HOUR VOLUMES WITH PROJECT
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Volume Adjust & Satflow Worksheet
Volume SB WB NB EB
Adjustment RT TH LT RT TH LT RT TH LT RT TH LT
Volume, V 26 9 35 28 897 60 32 5 SO 8 1172 28
Pk-hr fact, PHF .93 .93 .93 .95 .95 .95 .83 .83 .83 .89 .89 .89
Adj my flow, vp
_______________ 28
_____ 4
____ 38 29 944
____
_ 63
___ 39
_____ 6
_____
_ 12
___ 9 1317
__________
_ 31
___
Lane group, LG RT+TH LT RT+TH LT RT+TH LT RT+TH LT
Adj LG flow, v 32 38 973 63 45 12 1326 31
Prop LT, PLT .000 1 .00 .000 1 .00 .000 1 .00 .000 1 .00
Prop RT, PRT
_______________
_____ .875
_____ .
_ 000
___
_____ .030
_____ .
_ 000
___
_____ .867
_____ .
_ 000
___ .007
__________ .
_ 000
___
Saturation SB WB NB EB
Flow Rate RT TH LT RT TH LT RT TH LT RT TH LT
Base satflo, so 1900 1900 1900 1 900 1900 1900 1900 1900
Number lanes, N 1 1 1 1 1 1 1 1
Lane width, fW 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1.000 1 .00
Heavy veh, fHV 1 .000 1 .00 .981 1 .00 1 .000 1 .00 .981 1 .00
Grade, fg 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1.000 1 .00
Parking, fp 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1.000 1 .00
Bua block, fbb 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1.000 1 .00
Area type, fa 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1.000 1 .00
Lane util, fLU 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1.000 1 .00
Left-turn, fLT 1 .000 . B00 1 .000 . 085 1 .000 . 800 1.000 . 235
Right-turn, fRT .869 1 .00 .996 1 .00 .870 1 .00 .999 1 .00
PedBike LT,fLpb 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1.000 1 .00
PedBike RT,fRpb 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1.000 1 .00
Local adjuatmnt 1 .000 1 .00 1 .000 1 .00 1 .000 1 .00 1.000 1 .00
Adj satflow, a 1651 1520 1856 162 1653 1520 1861 446
SIGNAL2000/TEAPAC[Ver 2.70.07] - HCM Capacity and LOS Worksheet
Capacity SB WB NB EB
Analysis RT TH LT RT TH LT RT TH LT RT TH LT
Lane group LG RT+TH LT RT+TH LT RT+TH LT RT+TH LT
Adj Flow, v 32 38 973 63 95 12 1326 31
Satflow, s 1651 1520 1856 162 1653 1520 1861 446
Lost time, tL 4.0 4.0 4.0 4.0 9.0 4.0 4.0 4.0
Effect green, g 5.0 5.0 47.0 4 7.0 5.0 5.0 47.0 47.0
Grn ratio, g/C .083 .083 .783 . 783 .083 .083 .763 .783
LG capacity, c 138 127 1453 127 138 127 1458 349
v/c ratio, X .232 .299 .670 . 496 .326 .094 .909 .089
Flow ratio, v/s .019 .025 .524 . 390 .027 .008 .712 .070
Crit lane group
_______________
__________
____
___________
___
__________
____
__________
____
Sum crit v/s,YC 0.740 Total lost, L 8.0
Crit v/c, Xc .859
YELM CO2MIERCIAL
YELM AVE 6 CLARK RD/PRAIRIE PARK ST
2008 PM PEAR HOUR VOLUMES WITH PROJECT
SIGNAL2000/TEAPAC[Vei 2.70.07] - HCM Capacity and LOS Worksheet
05/03/06
16:52:48
Delay SB WB NB EB
and LOS RT TH LT RT TH LT RT TH LT RT TH LT
Lane group, LG RT+TH LT RT+TH LT RT+TH LT RT+TH LT
Adj Flow, v 32 38 973 63 45 12 1326 31
LG capacity, c 138 127 1453 127 138 127 1458 349
v/c ratio, X .232 .299 .670 .496 .326 .094 .909 .089
Grn ratio, g/C .063 .063 .783 .783 .083 .083 .783 .763
Unif delay, dl 25.7 25.9 3.0 2.3 25.9 25.4 4.9 1.5
Incr calib, k .11 .11 .24 .11 .11 .11 .43 .11
Incr delay, d2 .9 1.3 1.2 3.0 1.4 .3 8.8 .1
¢ueue Delay, d3 .0 .0 .0 .0 .0 .0 .0 .0
Unif delay, dl* .0 .0 .0 .0 .0 .0 .0 .0
Prog factor, PF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Contrl delay, d 26.6 27.2 9.2 5.3 27.3 25.7 13.7 1.6
Lane group LOS C+ C+ A A C+ C+ B+ A
Final Queue,Qbi 0
__________ 0
____ 0
__________ 0
____ 0
_______ 0 0 0
_______________
Appr delay, dA 26.9 9.2 27.0 13.4
Approach LOS C+ A C+ e+
Appr flow, vA 70 1036 57
_
_ 1357
__
_
___
_______________
Intersection: __________
Delay ____
10.3 __________
LOS ____
8+ _________ _
__ __
_____ _
YELM COM[~RCIAL 05/03/06
YELM AVE 6 CLARK RD/PRAIRIE PARK ST 16:52:48
2008 PM PEAK HOUR VOLUMES WITH PROJECT
SIGNAL2000/TEAPAC[Ver 2.70.07] - Evaluation of Intersection Performance
intersection # 1 -
_________________________
Sq 11 I Phase 1 1 Phase 2 1
I * * + I ^ I
I I v I ++++I
I I I++++ v I
North I <+ + +>I****> I
I I + + + I**** I
Im +++ I v I
I G/C=0 083 I G/C=0.783 I
G= 5.0" I G= 47.0" I
I Y+R= 4.0" I Y+R= 4.0" I
I Off= 0.08 I Off=15.08 I
_________________________
C= 60 sec G= 52.0 aec = 86.78 Y= 8.0 sec = 13.38 Ped= 0.0 sec = 0.08
MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int
Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total
AdjVOl: vph 28 4 38 29 944 63 39 6 12 9 1317 31 2520
Wid/Ln:ft/# 0/0 12/1 12/1 0/0 12/1 12/1 0/0 12/1 12/1 0/0 12/1 12/1
g/C Rqd@C:8 0 4 0 0 59 0 0 5 0 0 71 0
g/C Used: 8 0 8 8 0 78 78 0 8 8 0 78 78
SV @E: vph 0 127 116 0 1453 125 0 127 116 0 1458 349 3871
___________ ______________ ____________ _ _____
Svc Lv1:LO5 C+ C+ A A C+ C+ 8+ A B+
Deg Sat:v/c 0.00 0.23 0.30 0.00 0.67 0.50 0.00 0.33 0.09 0.00 0.91 0.09 0.76
HCM Delis/v 0.0 26.6 27.2 0.0 4.2 5.3 0.0 27.3 25.7 0.0 13.7 1.6 10.3
Tot Del:min 0 4 9 0 17 1 0 5 1 0 75 0 107
# Stops:veh 0 7 9 0 111 6 0 it 3 0 250 2 399
EUel: gal 0.0 0.1 0.2 0.0 1.9 0.1 0.0 0.2 0.1 0.0 4.2 0.0 6.BL
CO Em: kg 0.0 0.1 0.2 0.0 1.6 0.1 0.0 0.2 0.1 0.0 9.2 0.0 6.SL
______ ________ ______________ ______________ ______________ _____
queue l:veh 0 1 1 0 14 1 0 1 0 0 33 0 33
Queue 1: ft 0 25 30 0 366 23 0 35 9 0 847 7 897
YELM COEAfERCIAL 05/03/06
YELM AVE fi CLARK RD/PRAIRIE PARK ST 16:52:48
2008 PM PEAK HOUR VOLUMES WITH PROJECT
SIGNAL2000/TEAPAC[Vez 2.70.07] - Evaluation of Intersection Performance
APPR TOTALS Int
Param:Units SB Approach WB Approach NB Approach EB Approach Total
AdjVOl: vph 70
_______ 1036
______________ 57
______________ 1357 2520
____
__________
Svc Lv1:LOS C+ A C+ B+ B+
Deg Sat:v/c 0.27 0.66 0.28 0.89 0.76
HCM Delis/v 26.9 4.2 27.0 13.9 10.3
Tot Del:min 8 18 6 75 107
# Stops:veh 16 117 14 252 399
Ebel: gal 0.3 2.0 0.3 4.2 6.BL
CO Em: kg 0.3
_______ 1.7
______________ 0.3
______________ 4.2
______________ 6.SL
_____
__________
Queue l:veh 1 14 1 33 33
queue 1: ft 30 36fi 35 847 847
TWO-WAY STOP CONTROL SUMMARY
eneral Information ite Information
nal st Intersection Yelm Ave 8 4fh St
en /CC. uristliction
Date PeROrmetl nal sis Year
na sis Time Periotl
Pro'ect Desui lion EXISTING PM PEAK HOUR VOLUMES
EasWJest Street. Yelm Avenue SR-50] North/South Street 4th Street BE/NE
Intersection Orientation: Eest-West tutl Periotl hrs : 0.25
ehicle Volumes antl Adustments
Ma'or Street Eastbcuntl Weslbountl
Movement 1 2 3 4 5 6
L T R L T R
olume vehlh 6 93] 1 2 ]B2 11
Peak-hour (actor, PHF 0.9] 0.9] 0.9] 0.95 095 0.95
Hourly Flow Rate (veh/h) 6 965 / 2 823 if
roportion of heavy vehicles,
Pav 0 0 - -
Metlian type Two Way Leff Tum Lane
RT Channelizetl? 0 0
Lanes 1 1 0 1 f 0
onfguretion L TR L TR
U stream Si nal 0 0
Minor SVeet Northbountl Southbound
Movement T 8 9 10 11 12
L T R L T R
olume vehlh 3 0 6 5 0 8
eak-hour factor, PHF 0.56 056 0.56 O.Bf 0.81 O.H7
Hourly Flow Rate (veh/h) 5 0 f0 6 0 9
Proportion of heavy vehicles,
PHv 0 0 0 0 0 0
Percent gratle (%) 0 0
Flared approach N N
Storage 0 0
RT Channelizetl] 0 0
Lanes 0 1 0 0 1 0
on6guralicn LTR LTR
ontrol Oela Queue Len th Level of Serv ice
pproach EB W13 Northbountl Southbound
Movement 1 4 T 8 9 10 11 12
Lane Configuration L L LTR LTR
olume, v(vph) 6 2 15 15
opacity, c,,, (vphj B08 ]21 246 255
Ic ratio 0.01 000 0.06 006
ueue length (95%) 0.02 0.01 0.19 0.19
ontrol Delay (slveh) 9.5 10.0 20-6 20.0
LOS A B C C
pproach tlelay (s/veh) -- -- 20.6 20.0
pproach LOS - -- C C
xcazaam, ~wn~e~~~.w~~~~..,~,no~.,o„d..~ s ~waa ••
TWO-WAY STOP CONTROL SUMMARY
eneral Information ite Information
nal st Intersecion Yelm AVe 84th St
en /Ca. uristliciion
Date Perlormetl nal sis Vear
nal sis Time Period
Prc ed Desui lion 2008 PM PEAK HOUR VOLUMES WITHOUT P ROJECT
EasWJesl Street. Ye1m Avenue SR-507 otlh/South Street: 4fh Street SE?JE
Intersection Orientation: East-West tutl Periotl hrs '. 025
ehicle Volumes and Ad'ustments
a'or Street Eastbountl Westbountl
Movement 1 2 3 4 5 6
L T R L T R
olume vehlh 6 1218 i 3 1055 12
Peak-hourfactor, PHF 097 0.9] 0.9] 0.95 0.95 095
Hourly Flow Rate (vehm) 6 1255 1 3 1110 12
Proponion of heavy vehicles,
Pnv 0 _ _ 0 - -
Metlian type Two Way Le@ Tum Lene
RT ChannelizetlP 0 0
Lanes 1 1 0 1 1 0
anflguration L TR L 7R
U stream B' nal 0 0
Inor SUeat Northbountl Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume vehm 3 0 7 ] 0 B
Peak-hour (actor, PHF 056 0.56 056 0.81 0.81 0.81
Houry Flow Rate (vehlT) 5 0 12 B 0 9
Proponion of heavy vehicles,
Pnv 0 0 0 0 0 0
Percent gretle (%) 0 0
Flaretl approach N N
Storage 0 0
RT Channelizetl? 0 0
Lanes 0 1 0 0 1 0
onfguration LTR LTR
ontrol Dela Dueue Len th Level of Serv ice
pproach EB VJB Northbountl Southbountl
Movement 1 4 ] 8 9 10 if 12
Lane Configuration L L LTR LTR
olume,v(vph) 6 3 i7 1]
opacity, cm (vph) 630 561 i6] 156
/c ratio 0.01 0.01 0.10 0.11
ueue length (95%) 0.03 002 033 0.36
ontrol Delay (slveh) 10.8 11.5 29.0 30.9
LOS B B D D
pproach tlelay (slveh) - -- 29.0 30.9
pproach LOS -- -- D D
rrLVOOm.~ corrneni c rm~ u.»~„~y orno~~ea. nn a~en~ xd.rvm va,~o~ <.ir
TWO-WAY STOP CONTROL SUMMARY
arai mfnrmatinn ite Information
nal st Intersection Yelm AVe 84th Sf
en /Co. urisdiction
Date Pemortned nal sis Year
nal sis Time Period
uuloam+~ cavn~nn~ ozw~ o~~.en~n orno~m. nn asni. a..>.a s~~ <~~
TWO-WAY STOP CONTROL SUMMARY
eneral Information ite Information
nalysl
gang/Co.
ate Pertormetl
nal s¢Time Periotl Intersection
uristlidion
nalysis Vear Plaza Dr& Entrance
Pro'ed Descn tion 2008 PM PEAK HOUR VOLUMES WITH PROJ ECT
EastNVest Street: Entrance Nonh/South Street: Plaza Drive
Intersection Orientation: North-SOUM tud Period hrs : 0.25
ehicle Volumes antl Ad'u stments
a or Street Northbountl Soulhbountl
Movement 1 2 3 4 5 6
L T R L T R
olume 0 52 43 6 28 0
Peak-Hour Factor, PHF 090 090 090 0.90 0.90 0.90
Hourly Flow Rate, HFR D 5] 47 6 31 0
ercent Heavy Vehicles 0 - - 0 - -
Median Type UnCivitletl
RT Channelaed 0 0
Lanes 0 f 0 0 1 0
onfguration TR LT
U stream Si nal 0 0
inor Street WesOOUntl Eastbountl
Movement ] 8 9 10 11 12
L T R L T R
olume 46 0 8 0 0 0
Peak-Hour Factor, PHF 0.90 0.90 0.90 090 0.90 0.90
ouM Flow Rate, HFR 51 0 8 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Gretle (h) 0 0
Flared Approach N N
tox9e 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
onfiguretion LR
Dela Queue Lan th antl Level of Service
proach NB SB Westbountl Eastbountl
Movement 1 4 ] 8 9 10 11 12
Lane Configuration Li LR
(vph) 6 59
(m)(vph) 1500 88]
/c 0.00 0.07
5% pueue length 0.01 0 21
ontrol Delay ].4 9.3
LOS A A
pproach Delay - - 9.3
pproach LOS - - A
Rights Reserved
xevaoaM coprnem o zoo cm....,,~rorrmem nu a~se~ aQe~.~e ~e„o~ aie
v.a~o. a v
eelow ame, „~
ataspe not
eta
Above arve,
ti hathar araysb
recgnmxMed. 1aa
ira
7D
s
~t21 50
~M
tpMpHl21
50M~~
25 20 16 1D o ~
%TObI DHV Tumpq Leo (ekgb tuming molertie~
(1) DHV is total volume from both directions.
(2) Speeds are posted speeds.
Left-Turn Storage Guidelines (Two-Lane, Unsignalized)
Flgure 910-@a
.'' w r
~ r
2
c n
~ N
I W s ~ d
F
~
~^ O' F- N
3 `~ w 2
~
J -.
~. ..
~
H
7
G( Z ~ F,
A A _
-$ J
Q J ~ Q
¢ ~
1
- W
4 F- ~ ~
N
0
A
0
w
0
2
W
z
a
2
z
F-
F-
u
W
J
Deslgn Manual M 21.01 /niersectlons Ar Grade
Jenuary2005 Pege 810-18