Approval Signed-- ,_~, o~~~ T"E p~~ STAFF REPOR T City of Yelm YELM Community Development Department WASHINGTON ' Case Number: SPR-05-0581-YL Applicant: Forbest Partners - P.O. Box 12540 Olympia WA 98508-2540 Property Owner: Forbest Partners Agent: Mike McKinnon, Sr 2647 Westwood Drive NW Olympia, WA 98502. Request: Construct three retail buildings, with associated parking. Action: Approval of the Site Plan Review with conditions Findings of Fact Site Plan Review The Proposal includes three retail buildings with associated parking on approximately 1.23 acres. A Notice of Application was mailed to local .and state agencies, and surrounding property owners on June 5, 2006. Section 17.84.020 (C) Yelm Municipal Code allows the Site Plan Review Committee to approve a proposal when the site plan conforms to the standards, provisions and policies of the city as expressed in its various adopted plans and ordinances including the applicable sections of the shoreline master program for the Thurston Region. Property Characteristics The property is located at 106 Plaza Road, North of Yelm Avenue East (SR 507), and is identified by assessor tax parcel number 22730110900. The surrounding area is commercially zoned with existing commercial uses. The property is identified by the Yelm Comprehensive Plan Map as Commercial (C1). All Commercial uses, including retail/business centers are allowed to serve the needs of the community for convenience goods and services. The City of Yelm will provide police protection, water service, and sewer .service. Fire protection services are provided by The SE Thurston Fire/EMS District (Thurston County Fire Protection District #2). Concurrency Chapter 15.40 YMC requires the reviewing authority to determine that required urban infrastructure is available concurrent with development. Concurrency with sewer infrastructure is achieved pursuant to Section 15.40.020 (B)(1) YMC when the project is within an area approved for sewer pursuant to the adopted sewer .comprehensive plan for the city and improvements necessary to provide city standard facilities and services are present to meet the needs of the proposed development. Concurrency with water infrastructure is achieved pursuant to Section 15:40.020 (B)(2) YMC when the project is within an area approved for municipal water service pursuant to the adopted water comprehensive plan for the city and improvements necessary to provide city standard facilities and services are present. Concurrency with transportation infrastructure is achieved pursuant to. Section 15.40.020 (5)(c) YMC when the project: • Makes on-site and frontage improvements consistent with city standards and roads necessary to serve the proposed project consistent with safety grid public interest; • Makes such off-site facility improvements, not listed on the capital facilities plan, as are necessary to meet city standards for the safe movement of traffic and pedestrians attributable to the project; • Makes a contribution to the facilities relating to capacity improvements identified in the adopted six-year traffic improvement program, in the form of a transportation facility charge. Concurrency with school infrastructure is achieved pursuant to 15.40.020 (B)(4) when the developer provides a letter from the local school district that the school facilities impacted by the proposed development are present, or are on an approved and funded plan, to assure that facilities will .be available to meet the needs and impacts of the proposed development. Concurrency with Fire Protection is achieved pursuant to 15.40.020(6) when the developer makes a contribution to the fire protection facilities as identified in the most current version of the .capital facilities plan adopted by the Yelm Fire District (SE Thurston Fire/EMS) and endorsed by resolution of the Yelm city council. July 12 2006 Page 2 of 11 State Environmental Policy Act The City of Yelm SEPA Responsible Official issued a Mitigated Determination of Non- significance based on WAC 197-11-158 on October 9, 2006. This determination is final and fulfils the City's responsibility for disclosure of potential, significant environmental impacts. The Hearing Examiner may take action to deny or condition the proposal based on impacts identified in the environmental checklist or other environmental documents. The Mitigated Determination of Non-significance included the following findings of fact: 1. This Mitigated Determination of Non Significance is based on the project as proposed and the impacts and potential mitigation measures reflected in the following environmental documents: • Environmental Checklist (May 2006, Olympic Engineering) • Traffic Impact Analysis 2. The City of Yelm has adopted a concurrency management system as required by the Growth Management'Act. Chapter 15.40 YMC (concurrency Management) is designed to ensure that the improvements required to support development are available at the time of development. A concurrency determination may be issued for a proposal as it relates to transportation issues when: the development provides on-site frontage improvements; the project makes off-site improvements as necessary to provide for the safe movement of traffic; and the project makes a contribution to projects identified the six year transportation improvement program in the form of a Transportation Facilities Charge. 3. The City of Yelm is identified as a Critical Aquifer Recharge Area, a designated environmentally sensitive area. Potential Impacts to groundwater quality and quantity will be mitigated through measures that exceed the standards in the 1992 DOE stormwater manual as adopted by the City. of Yelm. The Mitigated DNS contained the following conditions, based on review of the environmental checklist and other environmental documents The developer shall mitigate transportation impacts based on the new P.M. peak hour trips generated by the project. The Transportation Facility Charge (TFC) shall be based on specific uses, an the time of tenant improvement. 2. Temporary erosion control systems to be approved by the City of Yelm. 3. stormwater treatment shall meet or exceed the 1992 DOE stormwater Manual. July 12 2006 Page 3 of 11 Design Guidelines The property lies within a (C1) Commercial zone which is required to meet the City of Yelm's design guidelines. The guidelines are intended to supplement the design standards in the City of Yelm zoning ordinance. Guidelines include provisions, requirements or considerations that are in addition to the zoning ordinance standards. Street Fronts The design guidelines require that development must define the street edge with building, landscaping, or other features, must provide direct access to the building from the frontage, and provide treatment to spatially define the street edge when parking is adjacent to street frontages. The building is located adjacent to the street frontage of Plaza Drive NE. Frontage improvements to Plaza Drive were completed during the short platting process. There is a private access easement that is located off Plaza Drive,, between this parcel and an improved commercial site to the south. A concrete or other approved sidewalk must be installed across this private access easement, to provide pedestrian access. Pedestrian access shall also be provided from Plaza Drive to the front of the proposed buildings. Pedestrian Circulation The follovvirig elements must be provided as part of the site plan for new developments: / All pedestrian paths must comply with the ADA. / Adequate lighting must be provided for pedestrian access. / Walkways should be integrated with the required parking lot landscaping. / Provide pathways through parking lots / Integrate transit stops into the planning of site improvements / Provide weather protection such as a canopy to create a covered pedestrian open space. / Provide at least 200 square feet of landscaping at or near the entry. / Provide pedestrian facilities such as benches, kiosks, or bicycle racks. / Provide pedestrian scaled lighting. / Provide adjacent window displays. / Provide artwork or special pedestrian scaled signs. Building Design and Defails To encourage buildings that are comfortable at a human scale, at least three of the following features must be incorporated into the building design: / Balconies in upper stories / Bay windows July 12 2006 Page 4 of 11 / Pedestrian oriented space / Individual windows / Gable or hipped roof . / Porch or covered entry / Spatially defining building elements that define an occupied space / Upper story setbacks / Composing smaller building elements near the entry or pedestrian oriented street fronts To ensure new development is compatible with Yelm's architectural size and character, at least two of the following features must be incorporated into the building design: / Upper story setback / Horizontal building modulation / Modulated roof line / Building articulation To encourage unique identifiable architectural features at intersections, at least one of the following features must be included on a facade facing a public street: / Decorated roofline / Decorative treatment of windows. and doors / Decorative railings, grill work, or landscape guards / Landscape trellises / Decorative light fixtures / Decorative building materials (masonry, wood details or patterns) Metal roofing must be of high quality with a standing seam and cannot be brightly colored. Blank walls must be treated with trellis and plantings, landscaping beds or other methods. Critical Areas All of Yelm is considered a critical aquifer recharge area. Existing development Regulations which require the treatment of stormwater prior to infiltration into the ground as well as the containment of hazardous materials on-site address the .potential. impacts to this critical area. The City wetland maps indicate that the property is located outside of wetlands, flood zones, and high ground water buffer areas. July 12 2006 Page 5 of 11 Transportation Yelm is a small compact community most directly affected by two state highways, SR 510 and SR 507, which bisect the community. These state routes are used by local residents for transportation throughout the City, and for access to commercial and residential areas throughout the community as well as serving regional traffic. The updated Transportation element of the Yelm Comprehensive Plan identifies a number of improvements designed to avoid the need to significantly widen existing streets, and .particularly Yelm Avenue. New development impacts the transportation system in Yelm and, unless the improvements identified in the transportation plan are constructed, the City would need to require developers to pay the cost of internal street widening. The City has adopted a Transportation Facility Charge (TFC) of $750.00 per pm peak trip. The concurrency chapter of the Municipal Code provides a default table that is used to determine new peak PM trips generated by a proposed use. The trip generation rates will be determined at the time of tenant improvement, based on the use proposed. The existing access for the private road into the site. is not pedestrian oriented. To complete the required frontage improvements, a sidewalk shall be extended across the easement access to promote safe pedestrian circulation. All other frontage improvements on Plaza Road are complete. Water Supply The proposed site would need to connect to the City's .water system. There is an existing 6" water line located on Plaza Drive. Water connections are based on a consumption rate of 900 cubic feet a month and are. charged at a rate of $1,500 per connection (fee subject to change) inside city limits. Any onsite wells must be decommissioned per Department of Ecology standards. The City of Yelm is dedicated to providing the best quality water possible to its consumers. Section 246-290-490, WAC, requires that the City take measures to ensure that contamination does not occur as a result of cross contamination. An irrigation meter may be installed for the purpose of irrigation. A backflow prevention device will be required for all landscape irrigation connections between the irrigation system and the water meter. Identified in the 2002 City of Yelm Water Comprehensive Plan is a requirement to install fire hydrant locks as part of the City's water conservation and accountability program. In 2004, the City was also required to complete a vulnerability assessment in response to the Homeland Security measures. ,July 12 2006 Page 6 of 11 Sewer System The proposed site will be required to connect to the City's sewer system. There are existing services extended to this lot from Plaza Drive. The building(s) will be required to install a step sewer tank, pumps etc. The current fee to connect to the City sewer system is $5,725.00 per connection. Sewer connection fees are based on water consumption. Stormwater Impervious surfaces create stormwater runoff which, when uncontrolled and untreated can create health, safety, and environmental hazards. The City of Yelm has adopted the 1992 Department of Ecology Stormwater Manual, which requires all development to treat and control stormwater on site. The applicant has submitted a preliminary stormwater plan which includes a conceptual design for the treatment and infiltration of the stormwater. A final stormwater plan is required as part of civil plan application submission. Stormwater facilities require continued maintenance to ensure they remain in proper working condition. Parking The City of Yelm Development Guidelines, Design Guidelines, and Municipal Code address parking regulations from many aspects, including, but not limited to the design of lots, the number of stalls required, pedestrian pathways within lots, and safety. The requirements of off-street parking and loading facilities and their design shall be regarded as the minimum; however, the owner, developer or operator of the premises for which the parking facilities are intended shall be responsible for providing adequate amounts and arrangement of space for the particular premises even though such space or. its arrangement is in excess of the minimum set forth. A loading ,space must accommodate a truck 45 feet in length, 12 feet in width, and 14 feet tall As stated in Chapter 17.72YMC, Retail establishments require one (1) parking space for every 250 square feet of gross floor area. Commercial offices require one (1) parking. space for every 300 square feet of gross floor area. A standard stall is 9 feet by 20 feet while a compact stall is 8 feet by 16 feet. In all parking facilities containing 25 or more parking spaces, twenty-five percent (25%) of the required spaces may be designated compact car. The total number of parking stalls required based on 14,040 square feet of retail/commercial office space is forty-nine (49) stalls. The Americans with Disabilities Act (ADA) requires a minimum of one (2) handicap accessible stall for parking lots over 25 stalls. Two (2) handicap accessible stalls are required, with a minimum of one (1) being van accessible. July 12 2006 Page 7 of 11 Off street loading is required for all establishments requiring regular delivery such as food retailers and retail. A loading space must accommodate a truck 45 feet in length, 12 feet in width, and 14 feet tall. The loading zone location shall be marked within the twenty-three (23) foot drive lane located on the east property line. A pedestrian pathway shall be provided from the loading zone to the sidewalks along the building frontages. Fire Fire protection to the buildings shall be provided pursuant to the International Fire Code. The specific requirements for installation of additional fire hydrants and fire lanes will be determined during civil plan review. The International Building Code (IBC) provides occupancy ratings for different types of uses. The fire coverage and sprinkler system for the proposed use must meet IBC requirements. A Fire Impact Fee pursuant to Section 15.40.020 (B)(6) YMC is established at a rate of $0.216 per square foot of development for all new development in the City of Yelm. Landscaping Landscaping and screening are necessary to provide screening between compatible and incompatible land uses, to safeguard privacy and to preserve the aesthetic assets of the City. Chapter 17.80 YMC requires all development to provide on site landscaping. Type II landscaping is intended to provide visual separation of uses from streets, and visual separation of compatible uses so as to soften the appearance of streets, parking areas, and building elevation. This landscaping is used around the perimeter of a site; and adjacent to buildings. Type II landscaping would be required along the perimeter of the site. A portion of the type II landscaping along the east perimeter, south of the building is waived to provide atwenty-three (23) foot driving surface to promote shared access with the adjacent property. Type IV landscaping is intended to provide visual relief and shade in parking areas. Refuse The City of Yelm Development Guidelines, Design Guidelines, and Municipal Code provides guidance for refuse storage and screening. Refuse areas are required to be assessable by LeMay, screened with a material and design compatible with the overall architectural theme of the associated structure, at July 12 2006 Page 8 of 11 least as high as the refuse container, and must be at least six-feet in height with a gate enclosure. No refuse container is allowed between a public street and the front of a building. Refuse collection areas must be designed to contain all refuse generated on site and deposited between collections and refuse should not be visible from outside the refuse enclosure. Conclusions of Law A. The Site Plan Review Committee has jurisdiction to consider and decide the issues presented by this request. B. The applicant has established that the request for site plan review approval satisfies all criteria set forth in Section 17.84.020(C) YMC, meets alf requirements of the (C-1) Commercial zoning classification, and meets all other requirements of the Yelm Municipal Code. Therefore, the site plan should be approved subject to the following conditions: 1. The conditions of the Mitigated Determination of Non-significance are hereby referenced and considered conditions of this approval. 2. A concrete, or other approved sidewalk shall be created across the access easement drive off of Plaza Drive. 3. The building construction and pedestrian access through the site shall reflect the design elements of the Yelm Design Guideline requirements. 4. The applicant shall mitigate transportation impacts based on the new P.M. peak hour trips generated by the project. The Transportation Facility Charge (TFC) is $750 per pm peak trip. Actual costs shall be determined at tenant improvement. 5. Each building shall connect to City water service. The project will be required to connect to an existing 6" water line located on Plaza Drive. The connection fee and meter fee will be established at the time of building permit issuance. All conditions for cross connection control as required in Section 246-290-490 WAC. 6. Each building shall connect to City sewer service. There are existing services extended to this lot from Plaza Drive. The connection fee will be established at the time of building permit issuance. 7. The applicant shall design and construct all stormwater facilities in accordance with the 1992 Department of Ecology Manual, as adopted by the City of Yelm. Best Management Practices are required during construction. July 12 2006 Page 9 of 11 8. Parking shall be provided in accordance with the City of Yelm Development Guideline standards. A minimum of forty-nine (49) stalls are required. Two (2) Handicap Accessible spaces shall be provided, with a minimum of one (1) stall being van accessible, pursuant to the ADA requirements. 9. Loading zone shall be displayed and marked within the- twenty-three (23) foot drive lane east of the site, and shown as part of civil plan review submission. A pedestrian pathway connecting the loading zone and the building frontages shall be provided. 10. Fire protection shall be provided in accordance with the International Fire Code, as adopted by the City of Yelm, and may include FDC's, fire hydrants, and/or fire lanes. Fire Impact Fee pursuant to Section 15.40.020 (B)(6) YMC is established at a rate of $0.216 per square foot of development for all new development in the City of Yelm 11. Landscaping of the site is required. a. Type II landscaping `is required along the perimeter of the site, and adjacent to buildings. The Type II landscaping is waived for a portion of the east property line, to allow a twenty three (23) foot driving surface. c. Type IV landscaping is required in all parking areas. d. A final detailed landscape plan is required as part of civil plan review and approval 12. Refuse collection areas shall be designed to contain all refuse generated on site and deposited between collections. Deposited refuse shall not be visible from outside the refuse enclosure. Screening shall be of a material and design compatible with the overall architectural theme of the associated structure, shall be at least as high as the refuse container, and must be at least six-feet in height with a gate enclosure. Refuse location shall require LeMay approval. C. The Site Plan is valid for eighteen (18) months from the date of this approval. The applicant may request asix-month extension on the approval, if the request is made in writing prior to the expiration date of this approval. If you need additional information or assistance, please -call the Community Development Department at (360) 458-3835. July 12 2006 Page 10 of 11 ;; Decision The request for site plan review approval is hereby granted subject to the conditions contained in the conclusions above. Prepared this ?~ day of :S . ~ l,i~ ~ 2007 ~~'~ ~~~- Nisha .Box, Assistant Planner APP ~~, s ~ ~ S~T day of.~ :'~~`~+~ 2007 ~ , Grant eck, Director of Community Development Site Ian Review Committee ' of Yelm Appeal Site Plan Approval is a Type II Administrative land use approval. An appeal of this decision can be filed within 14 days from the date of this approval, .pursuant to YMC, Chapter 15.49, Integrated Project Review Process. Any appeal must be in writing, contain specific factual objections, and include the appeal fee of $50.00. July 12 2006 Page 11 of 11