City of Yelm Inspection Form 4 McCammant 4-Plexes City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 2/21/08 Day: Thursday Time: 4:05 p.m.  Project Name: Trump Plat Project Number SPR-05-0540-YL  Project Description: Subdivision Contractor's Name: Bulls Eye Trucking & Excavating / PSE  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) PSE has capped the gas service line at the gas main for 903 Crystal Springs Rd. Contractor working on asphalting the trench patch.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on trench patch on Crystal Springs Rd.  Sketch or Paste Pictures Below:    Date 2/21/08 Typed or Printed Name and Title Steve Harrington Signature