City of Yelm Inspection Form 4 McCammant 4-Plexes
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 2/21/08
Day: Thursday
Time: 4:05 p.m.
Project Name:
Trump Plat
Project Number
SPR-05-0540-YL
Project Description:
Subdivision
Contractor's Name:
Bulls Eye Trucking & Excavating / PSE
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) PSE has capped
the gas service line at the gas main for 903 Crystal Springs Rd. Contractor working on asphalting the trench patch.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on trench patch on Crystal Springs Rd.
Sketch or Paste Pictures Below:
Date
2/21/08
Typed or Printed Name and Title
Steve Harrington
Signature