05-0540 water department comments 0402061. Where is the water service, services, or a master meter going to be put at these complexes? If it is a master meter it needs to be a 11/2” meter. (2-10 units) And a Double Check Valve
Assembly behind the potable water meter.
2. Is there going to be an irrigation system here? If so were are the meter and Double Check Valve Assembly going to be placed?
3. Is there a fire hydrant going to be installed?
4. The well needs to be removed as per DOH and DOE specification. And a copy of the report sent to the water department before the final project.