05-0540 Sewer Reveiw No 2 032907City of Yelm Sewer Department
March 29, 2007
RE: Review McCammant 4-Plexes
What is the depth of Bury on these STEP tanks?
How does the contractor propose to make the connection with the service line to the main?
What is the proposed location of the Service Boxes (carson boxes)?
What is the proposed location of the Pump Control Panels?
The S.S. from the Westerly Bldg appears to go under the Easterly Bldg. Shouldn’t Clean Outs be installed between the bldgs?
What is the Location of the nearest hose bib for servicing these tanks?
What size are these Side Sewers?
Are these pump systems symplex, Duplex, or tri-plex pump systems?