Loading...
DRAFT 05-0540 Review letter No 5 10-25-07 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   October 25, 2007 Michael N. Antonoff, P.E. 3316 Deer Island Drive E Lake Tapps, WA 98391 RE: McCammant Fourplexes – City of Yelm Project No. SPR-05-0540-YL Civil Plan Review #5 Mr. Antonoff: The City of Yelm has completed the 5th Civil Plan Review of the proposed subdivision. Your application included: Comments regarding our 4th Review letter Full size Plans We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Water All items look good. Sewer As was mentioned in review #4 – The Sewer Main being tapped is shown on the wrong side of Crystal Springs Rd. Please tap the main with 2” PVC, and use 2” throughout (both service lines to the tanks). Use detail 7-2 but substitute 2” pipe where 1” is shown in the detail. Engineering Item # 5 from the 5th review still needs to be addressed.  Until recently I did not have a copy of step sewer contract # 2 asbuilts.  The info I gave to the Engineer was based on what little information and locate information that I collected in the field that turned out to be erroneous.  The step sewer main is located 16’ from the centerline of Crystal Springs and 1’ off the edge of pavement on the West side of Crystal Springs, according to the step sewer contract # 2 asbuilt.  I forwarded a copy of this asbuilt on to Engineer via e-mail. Planning The landscape plans were approved as part of review # 3. Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports and 4 sets of landscape and irrigation plans. The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, Jim Gibson P.E. Development Review Engineer cc. Bryan McCammant