Steve McCammant 4 Plexes Review #5 CommentsIPM.Note
Steve McCammant 4 Plexes Review #5 Comments
Roberta Allen
Steve Harrington
Roberta Allen
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
McCammant 4 Plexes Review #5 Comments
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Roberta Allen
Steve McCammant 4 Plexes Review #5 Comments
Roberta: The following are review comments for the McCammant 4-Plexes 5th Review.
1. Item # 5 from the 5th review still needs to be addressed. Until recently I did not have a copy of step sewer contract # 2 asbuilts. The info I gave to the Engineer was based on
what little information and locate information that I collected in the field that turned out to be erroneous. The step sewer main is located 16’ from the centerline of Crystal Springs
and 1’ off the edge of pavement on the West side of Crystal Springs, according to the step sewer contract # 2 asbuilt. I forwarded a copy of this asbuilt on to Engineer via e-mail.
Thank you,
Steve Harrington
Engineering / Civil Inspector
City of Yelm
Office (360) 458-8423 / Field (360) 561-4264
<DC90029353CCCD468AA2A2858FFCD8F548FA26@server1.ci.yelm.wa.us>
McCammant 4 Plexes Review %235 Comments.EML
Steve Harrington
Roberta Allen
11.0
Roberta Allen
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_allen
r_allen@ci.yelm.wa.us
r_allen
458-3835
Community Development
Roberta Allen
Roberta Allen
r_allen