Loading...
Steve McCammant 4 Plexes Review #5 CommentsIPM.Note Steve McCammant 4 Plexes Review #5 Comments Roberta Allen Steve Harrington Roberta Allen EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH McCammant 4 Plexes Review #5 Comments EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Roberta Allen Steve McCammant 4 Plexes Review #5 Comments Roberta: The following are review comments for the McCammant 4-Plexes 5th Review. 1. Item # 5 from the 5th review still needs to be addressed. Until recently I did not have a copy of step sewer contract # 2 asbuilts. The info I gave to the Engineer was based on what little information and locate information that I collected in the field that turned out to be erroneous. The step sewer main is located 16’ from the centerline of Crystal Springs and 1’ off the edge of pavement on the West side of Crystal Springs, according to the step sewer contract # 2 asbuilt. I forwarded a copy of this asbuilt on to Engineer via e-mail. Thank you, Steve Harrington Engineering / Civil Inspector City of Yelm Office (360) 458-8423 / Field (360) 561-4264 <DC90029353CCCD468AA2A2858FFCD8F548FA26@server1.ci.yelm.wa.us> McCammant 4 Plexes Review %235 Comments.EML Steve Harrington Roberta Allen 11.0 Roberta Allen EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_allen r_allen@ci.yelm.wa.us r_allen 458-3835 Community Development Roberta Allen Roberta Allen r_allen