Loading...
McCammant 4 Plex Review Letter No 2IPM.Note McCammant 4 Plex Review Letter No.2 Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH McCammant 4 Plex Review Letter No.2 Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jim Gibson McCammant 4 Plex Review Letter No.2 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server Jim: Attached is a copy of the Review Letter No.2 for McCammant 4-plexes. Please review and let me know if there is anything I may need to add or change. I will give you the file back, including water, sewer and my mark-ups. Thank you, Steve <DC90029353CCCD468AA2A2858FFCD8F528F747@server1.ci.yelm.wa.us> McCammant 4 Plex Review Letter No.2.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh Review letter 2 McCammant 4-Plexes SPR-05-0540-YL Review letter 2 McCammant 4-Plexes SPR-05-0540-YL Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson jimg@ci.yelm.wa.us jimg Community Development Jim Gibson Jim Gibson Gibson Review letter 2 McCammant 4-Plexes SPR-05-0540-YL.doc City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 May 17, 2007 Michael N. Antonoff, P.E. 3316 Deer Island Drive E. Lake Tapps, WA 98391 RE: McCammant Fourplexes – SPR-05-0540-YL Civil Plan Review #2 – Site Construction Documents Mr. Antonoff: The City of Yelm has completed the 2nd Civil Plan Review of the proposed subdivision: Civil Engineering Comments Water Department Comments Sewer Department Comments The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Construction Plans: All Sheets: Please change approval signature box to read Development Review Engineer. 2. Please include all sheet numbers (1 of 5, 2 of 5, 3 of 5, 4 of 5 and 5 of 5). Sheet 1 of 4: 3. The existing well will need to be decommissioned per DEO and DOH regulations and a copy of report sent to City of Yelm Water Department at 901 Rhoton Road P.O. Box 479 Yelm Washington 98597. Please follow City of Yelm Water Details for proper size of water meters for this project. Fire hydrant water line and step sewer service line need to be 10 feet apart. Is there an irrigation system on this project? Water lines should not be installed under buildings. What is the bury depth of step tanks. Please show current City of Standard Details 4/2007. Please show connection of step sewer service line to step sewer main and call out the current COY Detail. Show locations of Carson boxes. Show location of pump control panels. Step sanitary sewer lines should not be installed under buildings. Clean outs should be installed between buildings. A hose bib needs to be installed near step tanks for servicing. Please provide current COY Detail for step / pump tank dated 4/2007. Please provide type of pumps used. The City of Yelm does not allow the use of cartridge or filter systems; please revise with a City of Yelm approved treatment structure. Please add stationing. What is proposed parking lot pavement thickness? As shown, the infiltration trench has a top elevation of 329 feet. This is one foot or less below the top of asphalt in the parking area. Depending on the proposed pavement section, this is likely not deep enough to provide adequate separation between the top of the gallery and the bottom of the pavement section. The city of Yelm Water Department does not make the tap on the water main for the service line. However the City of Water Department will have to be notified for inspection. Please follow the City of Yelm Development Guidelines. Please provide size, type, and slope information of the sewer pipe connecting the buildings to the STEP tank. Provide type of screening for refuse collection area. A cleanout detail should be provided. Please show location and call out on plans. Please provide a detailed landscape and irrigation plan reflecting land use condition of approval #10. Please define hatch for cement concrete and asphalt. Please show the correct hatch for cement concrete and asphalt in the legend on sheet 2 of 4. Jim: Gary is asking about FDC for fire, does the hydrant need to be located inside project limits and should there be a fire truck turn around inside project. I would like to know if we are going to approve the method of treatment for storm water. They are calling out CDS Model 264 which uses cartridges. Sheet 3 of 4. Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans. The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at steveh@ci.yelm.wa.us. Community Development Department Respectfully, Steve Harrington Civil Inspector Bryan McCammant Ronald McCammant May 17, 2007 Page 3 of 3 (360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us .doc REVIEW~1.DOC Review letter 2 McCammant 4-Plexes SPR-05-0540-YL.doc