Loading...
McCammant 4 Plexes Punch ListIPM.Note McCammant 4 Plexes Punch List Steve Harrington Jon Yanasak Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JONY McCammant 4 Plexes Punch List EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Jon Yanasak EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=JONY Tim Peterson Steve Harrington McCammant 4 Plexes Punch List 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=jonyMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=jonyMicrosoft Exchange Server Steve, here you go ---- Jon Yanasak City of Yelm Sewer Dept. Mgr Po Box 479 Yelm Wa 98597 Phone 360-458-8411 Fax 360-458-8166 jony@ci.yelm.wa.us <DC90029353CCCD468AA2A2858FFCD8F5397F03@server1.ci.yelm.wa.us> McCammant 4 Plexes Punch List.EML Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=jony McCammant 4Plexes Punch List July 24, 2008 McCammant 4Plexes Punch List July 24, 2008 Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh 458-8423 Community Development Steve Harrington Steve Harrington Tim Peterson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim tim@ci.yelm.wa.us tim 458-8499 Public Works Tim Peterson Tim Peterson McCammant 4Plexes Punch List July 24, 2008.doc CITY OF YELM SEWER DEPARTMENT July 24, 2008 Re: Punch list McCammant 4-Plexes Bldg “A” Green riser lids need to be installed on all risers. A 3rd neutral wire needs to be installed between the house breaker panel and the pump Control Panel. The Pump Control Panel has a broken mount on the Motor Starter and must be replaced. A surge arrester needs to be installed in the Pump Control Panel per our spec. The float wiring needs to be corrected so each float does what it is designed to do. The wires in the “J” box within the vault have multiple cuts in the insulation. Connections need to be re-done. The Side Sewer “Clean-Outs” have been buried and must be found and brought up to grade. Bldg “B” Green riser lids need to be installed on all risers. A 3rd neutral wire needs to be installed between the house breaker panel and the pump Control Panel. A surge arrester needs to be installed in the Pump Control Panel per our spec. The Side Sewer “Clean-Outs” have been buried and must be found and brought up to grade. The wires in the “J” box within the vault have multiple cuts in the insulation. Connections need to be re-done. The float wiring needs to be corrected so each float does what it is designed to do. .doc MCCAMM~1.DOC McCammant 4Plexes Punch List July 24, 2008.doc