Loading...
This is not the official review letterIPM.Note This is not the official review letter Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH This is not the official review letter Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH 'mantonoff@msn.com' This is not the official review letter 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server Michael: This is only a copy of the review letter # 5 to help in expediting your changes for this project. Use this as reference only. The original draft to respond to will be arriving to you by mail. Thank you, Steve Harrington Engineering / Civil Inspector City of Yelm Office (360) 458-8423 / Field (360) 561-4264 <DC90029353CCCD468AA2A2858FFCD8F528FA2C@server1.ci.yelm.wa.us> This is not the official review letter.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh Not the official Review letter No 5 For expediting project only Not the official Review letter No 5 For expediting project only 'mantonoff@msn.com' SMTP mantonoff@msn.com 'mantonoff@msn.com' mantonoff@msn.com mantonoff@msn.com Not the official Review letter No 5 For expediting project only.doc City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 November 1, 2007 Michael N. Antonoff, P.E. 3316 Deer Island Drive E Lake Tapps, WA 98391 RE: McCammant Fourplexes – City of Yelm Project No. SPR-05-0540-YL Civil Plan Review #5 Mr. Antonoff: The City of Yelm has completed the 5th Civil Plan Review of the proposed subdivision. Your application included: Engineers Response Letter from 4th Review Full size Plans Please only use this as reference to expedite your changes. The official Review Letter # 5 will come to you via United Postal Service (Mail). When you respond to review letter # 5, please type your responses to comments for review # 5 on an official response letter that states how you resolved each item. Be sure to submit 4 full sets of revised plans, not just a single sheet. We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Sewer Comments: Please make these changes on Civil Plans The existing sewer main is being shown on the wrong side of Crystal Springs Rd. The step sewer main is located 16’ from the centerline of Crystal Springs and 1’ off the edge of pavement on the West side of Crystal Springs, according to the step sewer asbuilt.  A copy of the asbuilt was forwarded to the engineer via e-mail. Please tap the main with 2” PVC, and use 2” throughout (both service lines to the tanks). Use detail 7-2 but substitute 2” pipe where 1” is shown in the detail. Irrigation Plan: (These comments were from Review No. 4. Not addressed with submittal No. 5) The following is for the Landscaping Designer The Landscape plans were approved in the previous review. The irrigation plans need to be updated to match the revised civil plans. The irrigation plans need to be resubmitted and reviewed. Please submit 8 sets of the irrigation plans. Drip Irrigation is required within the planter strip on Crystal Springs Road. The irrigation system that you have proposed is acceptable. However, the City is striving to reduce the consumption of water and we would approve if you wanted to propose a drip irrigation system on the remainder of the site instead of sprinkler heads. Please review and revise the plans to address the above referenced comments. Before you resubmit the plans please contact Steve Harrington to arrange the submittal. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, Jim Gibson P.E. Development Review Engineer cc. Bryan McCammant November 1, 2007 Page 3 of 2 (360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us .doc NOTTHE~1.DOC Not the official Review letter No 5 For expediting project only.doc